SitePathLocal intelWisconsin › St. Croix County
Wisconsin

Solar permitting — St. Croix County, Wisconsin

FIPS 55109

0 indexed meetings (0 energy-related), 0 PSC dockets, 0 news items, 0 known opposition groups.

B
St. Croix County, WI
Risk score 39.5/100 · Full scorecard →
Compliance: ModerateTrajectory: StableSaturation: Low

W WI; Hudson area; Twin Cities exurb (fastest growing WI county); active solar; local CUP. Permitting: Saint Croix County: CUP in Agricultural/Industrial district for projects <100 MW.; 200-ft setback. Track record: St. Croix County

Permitting process

Local permitting pathway

Saint Croix County: CUP in Agricultural/Industrial district for projects <100 MW.

Setbacks & buffers

State standard: Local jurisdiction authority; typical setbacks 65-200 ft from property lines

Spacing requirements

None codified.

Size restrictions

None codified; managed via CUP/SUP conditions

Penalties & bonding

No penalties or adjustments. Standard CUP/SUP process.

State-level permits & approvals

PSC of Wisconsin has siting authority for wind/solar ≥100 MW (Wis. Stat. §196.491). Projects <100 MW: local CUP/SUP under county/town zoning governs. Local restrictions on wind systems must meet one of 3 conditions: (1) public health/safety; (2) not significantly increase cost/decrease efficiency; (3) allows comparable alternative. Local solar restrictions face similar reasonableness standard. No statewide preemption below 100 MW threshold — strong local control. MISO interconnection territory statewide.

State policy & grid context

State RPS & clean energy policy

10% by 2015 (met, no update) | Act 141 (2005) | Wis. Stat. §196.378

State incentive programs

Wisconsin RPS: 10% renewable by 2015 (met — weakest in region). Focus on Energy program: commercial/industrial rebates for solar ($150-450/kW for ≤25 kW). Property tax exemption: Wis. Stat. §70.111(18) — solar systems exempt from property tax assessment. Sales tax exemption: Wis. Stat. §77.54(57m) — solar equipment purchases exempt. Wisconsin Green Energy program: voluntary renewable program through WPS, MGE, We Energies. Alliant WPL (WI) has deployed ~1,089 MW solar by 2024; Vista Sands (1,315 MW Portage Co.) approved June 2025 — largest WI solar project. Utility: We Energies (WEC) serves SE WI/Milwaukee; WPS (WEC) serves NE WI; Alliant Energy (WPL) serves central/southern WI; MGE serves Madison metro; Xcel NSPW serves far NW WI; Dairyland Power Coop and WPPI Energy serve rural areas.

Grid & interconnection

MISO / Dairyland Power Cooperative (DPC) zone

Subscriber intel Subscribers

Researched for this county and available with a subscription:

Sign in to viewSee plans

Energy-related meetings & dockets P1

No meetings indexed yet for this jurisdiction.

State PSC dockets P1

No PSC dockets matched to this county yet.

Sentiment & opposition P2

No sentiment rollup yet (requires meeting transcripts to be processed).

Local news P3

News ingestion not yet active for this county (GDELT/RSS pipeline pending).

Explore all 3,143 counties on the interactive map

Filter by grade, state, moratorium status, and compliance stringency. Compare counties side by side.

Open the county map → SitePath home All Wisconsin counties
Data sources: public agendas/minutes from local government sites; PSC dockets from state regulators; news from GDELT and curated RSS; sentiment derived from public meeting transcripts. Last refreshed 2026-06-10. See the county risk scorecard or the full Wisconsin permitting index.