Solar permitting — Ozaukee County, Wisconsin
2 indexed meetings (0 energy-related).
✅ LOW RISK (Score 34/100, Grade A, improving trajectory) — Milwaukee N suburb; affluent suburban; very limited utility-scale land; commercial primary; local CUP. Permitting: Ozaukee County: CUP in Agricultural/Industrial district for projects <100 MW.; 200-ft setback. Track record: no prior utility-…
Permitting process
Local permitting pathway
Ozaukee County: CUP in Agricultural/Industrial district for projects <100 MW.
Setbacks & buffers
State standard: Local jurisdiction authority; typical setbacks 65-200 ft from property lines
Spacing requirements
None codified.
Size restrictions
None codified; managed via CUP/SUP conditions
Penalties & bonding
No penalties or adjustments. Standard CUP/SUP process.
State-level permits & approvals
PSC of Wisconsin has siting authority for wind/solar ≥100 MW (Wis. Stat. §196.491). Projects <100 MW: local CUP/SUP under county/town zoning governs. Local restrictions on wind systems must meet one of 3 conditions: (1) public health/safety; (2) not significantly increase cost/decrease efficiency; (3) allows comparable alternative. Local solar restrictions face similar reasonableness standard. No statewide preemption below 100 MW threshold — strong local control. MISO interconnection territory statewide.
Full records for this county are part of a SitePath subscription.
State policy & grid context
State RPS & clean energy policy
10% by 2015 (met, no update) | Act 141 (2005) | Wis. Stat. §196.378
State incentive programs
Wisconsin RPS: 10% renewable by 2015 (met — weakest in region). Focus on Energy program: commercial/industrial rebates for solar ($150-450/kW for ≤25 kW). Property tax exemption: Wis. Stat. §70.111(18) — solar systems exempt from property tax assessment. Sales tax exemption: Wis. Stat. §77.54(57m) — solar equipment purchases exempt. Wisconsin Green Energy program: voluntary renewable program through WPS, MGE, We Energies. Alliant WPL (WI) has deployed ~1,089 MW solar by 2024; Vista Sands (1,315 MW Portage Co.) approved June 2025 — largest WI solar project. Utility: We Energies (WEC) serves SE WI/Milwaukee; WPS (WEC) serves NE WI; Alliant Energy (WPL) serves central/southern WI; MGE serves Madison metro; Xcel NSPW serves far NW WI; Dairyland Power Coop and WPPI Energy serve rural areas.
Grid & interconnection
MISO / We Energies (WE) zone
Full records for this county are part of a SitePath subscription.
Community opposition P1
No organized opposition on record for this county yet — no petition, group, or oppositional coverage tracked. Absence of opposition is a positive siting signal.
Subscriber intel Subscribers
Researched for this county and available with a subscription:
- 🔒Project track record
- 🔒Developer intelligence
- 🔒Community & board sentiment
- 🔒Governing board
Energy-related meetings & dockets P1
2 meetings indexed for this jurisdiction; none flagged as discussing solar, BESS, data centers, wind, or transmission yet. Coverage expands weekly.
State PSC dockets P1
No tracked activity yet — coverage expands weekly.
Sentiment rollup P2
No sentiment rollup yet (requires meeting transcripts to be processed).
Local news P3
No tracked activity yet — coverage expands weekly.
Filter by grade, state, moratorium status, and compliance stringency. Compare counties side by side.