Solar permitting — Klickitat County, Washington
33 indexed meetings (10 energy-related), 18 news items, 7 known opposition groups.
Columbia Gorge NSA restrictions and moderate ag land sensitivity are primary risk factors; Simcoe Mountains plateau outside NSA boundary has viable so. Permitting: Klickitat County: CUP in Agricultural and Resource zones. Track recor…
Key driver: Columbia Gorge NSA restrictions and moderate ag land sensitivity are primary risk factors; Simcoe Mountains plateau outside NSA boundary has viable solar development potential.
Permitting process
Local permitting pathway
Klickitat County: CUP in Agricultural and Resource zones; Columbia River Gorge Commission review required for projects within NSA boundary; Board of County Commissioners approval.
Setbacks & buffers
No county-specific solar setbacks; Columbia River Gorge NSA scenic review applies within designated corridor.
Spacing requirements
None codified.
Size restrictions
None codified; managed via CUP/SUP conditions
Penalties & bonding
No penalties or adjustments. Standard CUP/SUP process.
State-level permits & approvals
Large facilities (≥350 MW): Washington EFSEC exclusive siting jurisdiction — state preempts local permitting. Projects <350 MW: county CUP or SUP in agricultural or resource-zoned land; no statewide preemption floor for smaller projects. SEPA review required for utility-scale; DNS/MDNS/EIS per county SEPA lead agency. GMA counties must address energy siting in comprehensive plans. SMA applies near shorelines. Critical Areas Ordinances: wetlands, fish habitat, flood zones require county CAO compliance. Agricultural land: county-specific farmland protection policies apply; prime farmland conversion may require additional findings.
Full records for this county are part of a SitePath subscription.
State policy & grid context
State RPS & clean energy policy
100% clean by 2045 | Clean Energy Transformation Act / SB 5116 (2019) | RCW 19.405
State incentive programs
Washington Clean Energy Transformation Act (CETA/SB 5116, 2019): IOUs must be carbon-neutral by 2030; 100% carbon-free by 2045. Net metering: ≤100 kW for IOU customers under WUTC; PUDs set individual limits, most allow up to 100% annual consumption offset. RESIP (Renewable Energy System Incentive Program): production incentives for systems ≤100 kW, utility-funded. Sales & use tax exemption: solar PV equipment fully exempt (RCW 82.08.962). Property tax exemption: solar systems excluded from assessed value (RCW 84.36.635). Community solar programs through PSE, SnoPUD, Tacoma Power, Clark Public Utilities, and most WA PUDs. PACE financing available in participating WA counties. Federal ITC: 30% (IRA 2022); low-income adder: 10% bonus ITC for qualifying community benefit projects.
Grid & interconnection
WECC / BPA Transmission — Klickitat PUD and Pacific Power service territory; Columbia River Gorge corridor grid
Full records for this county are part of a SitePath subscription.
Battery storage (BESS) P1 State-Default Permitting
No confirmed county BESS ordinance.
Local BESS ordinances & bylaws
Tracked storage projects
County-level battery-storage status, safety requirements, and projects — each linked to a primary source.
Community opposition P1 7 tracked
Organized opposition signals on record for this county — petitions, community groups, and oppositional coverage — each linked to its primary source.
- Can farms and solar energy installations coexist? Solar
- Even In The Bright Of Day, Some Klickitat County Residents Have A Solar Energy ‘Nightmare’ Solar
- Petition · Impose emergency moratorium to update Klickitat County's ordinances for solar farms Storage
- Solar project meets resistance; Carriger Solar Project proposed in Klickitat County Solar
- ⚡ Special Report: Klickitat County’s Solar & Battery Storage Ordinance Storage
- Proposal for 1,300 acre solar farm goes again to Washington governor Solar
- Klickitat County proposes ordinance severely restricting utility-scale solar and BESS Solar
SitePath maintains the most complete community-opposition dataset available, refreshed continuously from primary sources.
Subscriber intel Subscribers
Researched for this county and available with a subscription:
- 🔒Project track record
- 🔒Developer intelligence
- 🔒Community & board sentiment
- 🔒Governing board
Energy-related meetings & dockets P1
Halo color = sentiment of the relevant agenda excerpt: green positive, yellow neutral, red negative.
- 2025-01-21 OtherBESS
The Klickitat County Planning Commission approved a resolution to establish an advisory committee for the planning and development of solar and battery energy storage systems.
- 2025-01-14 OtherBESS
The Planning Commission voted to deny a special-use permit application for a 150 MW solar farm.
- 2025-01-09 OtherBESS
The County Board of Commissioners discussed and voted on appointing volunteers for various county projects, including a solar farm and planning commission positions.
- 2025-01-07 OtherBESS
County Solar & BESS Ordinance Project Advisory Committee members will be appointed to review and provide input on a proposed battery storage project.
- 2025-01-07 OtherBESS
County Solar and BESS Ordinance Project Advisory Committee (PAC) volunteers will be appointed to discuss applicants in the afternoon meeting.
Full records for this county are part of a SitePath subscription.
State PSC dockets P1
No tracked activity yet — coverage expands weekly.
Sentiment rollup P2
No sentiment rollup yet (requires meeting transcripts to be processed).
Local news P3
- 2026-08-03 Rising Tension In Central Washington As Farmland Is Eyed For Energy And Data Center Projects,406239
- 2026-08-03 Rising Tension Central Wa Farmland 110050887
- 2026-06-04 Avangrid Bags New Contract To Power Microsoft 04 Jun 2026 183852 Article
- 2026-06-03 Avangrid Completes Tower Solar
- 2026-06-01 Going Green Now For Who Yakama Protest Pumped Storage Project On Sacred Site To Power Data Center
- 2026-05-31 Avangrid Executes Ppa With Microsoft For New 140 Mw Solar Project In Washington U S Contracts Now Exceed 500 Mw 204098
- 2026-05-26 Yakama Nation Fights To Protect A Sacred Site From An Energy Storage Center
- 2026-05-26 Iberdrola Signs New Long Term Electricity Supply Agreement In Washington 0001
- 2026-05-26 Puget Sound Energy Signs Contract To Acquire 20260526
- 2026-05-25 Yakama Protest Clean Energy Project On Sacred Site To Power Data Center
- 2026-05-25 Going Green Now For Who Yakama Protest Clean Energy Project On Sacred Site To Power Data Center
- 2026-05-25 Going Green Now For Who Yakama Protest Clean Energy Project On Sacred Site To Power Data,403001
- 2026-05-22 Washingtons Largest Utility Moves To Add More Wind Power,402868
- 2026-05-22 Renewable Energy Update 5 21 26 3778702
- 2026-05-22 Washingtons Largest Utility Moves To Add More Wind Power
Filter by grade, state, moratorium status, and compliance stringency. Compare counties side by side.