F
Surry County, VA
Risk score 74/100 · Full scorecard →
Compliance: ExtremeTrajectory: WorseningSaturation: Very High

Hard cap: 7% countywide (~10,695 ac); Sycamore Cross DENIED 2024 citing cap proximity. Permitting: M-1; hard 7% countywide cap (~10,695 ac max); extreme compliance stringency. Track record: denial on record — Graymont…

Key driver: Hard cap: 7% countywide (~10,695 ac); Sycamore Cross DENIED 2024 citing cap proximity. HB 711/SB 347: county-wide percentage caps not explicitly addressed; cap-as-functional-ban arguments possible once threshold approached but legal outcome uncertain. Current saturation leaves limited headroom regardless.

Permitting process

Local permitting pathway

M-1, M-2 | CUP

Setbacks & buffers

300-ft minimum vegetative buffer from all public rights-of-way and adjoining structures. 7% county-wide acreage cap (10,695 acres) enacted Feb 13 2025 (prior 10% / 15,278-acre cap, 2023). Former Planning Commission Chair Eddie Brock noted most localities use 2–3% caps. Source: Smithfield Times Feb 2025

Spacing requirements

≥1 mile centroid to nearest high-voltage transmission line; ≥1 mile from airports (FAA certification required)

Size restrictions

≤65% site coverage by panels; ≥10% of site acreage must be pollinator/pollinator-friendly habitat

Penalties & bonding

Total penalty: +5 (Denial +5)

State-level permits & approvals

Local permit: Special Use Permit (SUP) or Conditional Use Permit (CUP) in A-1 Agricultural zoning; issued by Board of Supervisors (BOS) or Planning Commission per county ordinance. Counties without zoning (Buchanan, Russell, Lee, Scott, etc.) proceed via revenue-sharing siting agreements. SCC CPCN: Va. Code §56-580 (as amended by HB 1558/SB 762, eff. Jul 2021) — SCC Certificate of Public Convenience & Necessity required for generating facilities ≥5 MW; waivable for utility-owned projects under SCC-approved IRP. DEQ Permit by Rule (PBR): Required for all solar facilities ≥1 MW per Va. Code §10.1-1197.6; includes VSMP/VPDES erosion & stormwater permits. Mar 2022 DEQ rule: solar panels counted as impervious surface same as parking lots. Revenue sharing: Va. Code §15.2-2288.7 — localities may require up to $1,400/MW-year for utility-scale solar on agricultural or forestal land; increases 10% in year 1 then every 5 years thereafter. VDACS notice: VA Dept. of Agriculture & Consumer Services must be notified for projects converting prime agricultural or forestal land. PENDING LEGISLATION (as of Mar 11, 2026): HB 711 (Herring) / SB 347 (VanValkenburg) both cleared both chambers and await Gov. Spanberger's signature (session ends Mar 14, 2026). If signed: (1) all localities must allow solar ≥1 MW via special exception — outright bans illegal; (2) statewide setback floor: 150–200 ft non-participating dwellings, 50–100 ft from state roads, 100–250 ft from streams/wetlands, 50–75 ft from property lines; (3) localities retain denial authority but must report reasons to SCC public database; (4) companion HB 891/SB 443: BESS permitted accessory use on approved solar SE sites. Spanberger is pro-solar; signature expected. Monitor: lis.virginia.gov.

Full permitting requirements

Full records for this county are part of a SitePath subscription.

State policy & grid context

State RPS & clean energy policy

100% carbon-free by 2050 (Dominion), 2045 (APCo) | Virginia Clean Economy Act (2020) | Va. Code §56-585.5

State incentive programs

Virginia Clean Economy Act (VCEA, 2020): Dominion must reach 100% carbon-free by 2045; Appalachian Power by 2050; major driver of utility-scale solar procurement. Net metering: available under VCEA for systems up to 1 MW (by-right); large-scale behind-the-meter negotiated. SCC SolarShare: Dominion program offering renewable energy credits. Virtual net metering (Virginia): programs vary by utility. DEQ review: required for solar facilities ≥150 MW (permit by rule) or DEQ standalone review. Utility: Dominion Energy Virginia serves 2/3 of VA; Appalachian Power (AEP) serves western VA; Northern Virginia Electric Coop (NOVEC) serves NoVA exurbs; various rural cooperatives and municipal utilities.

Grid & interconnection

PJM / Dominion Energy Virginia (DEV) transmission zone (Surry Nuclear Station proximity)

Full state policy & grid detail

Full records for this county are part of a SitePath subscription.

Battery storage (BESS) P1 Standalone Ordinance

STANDALONE BESS ORDINANCE ADOPTED — Surry County, VA Board of Supervisors unanimously approved zoning ordinance amendment April 3 2025

Setback: 200 ft

Local BESS ordinances & bylaws

County-level battery-storage status, safety requirements, and projects — each linked to a primary source.

Community opposition P1

No organized opposition on record for this county yet — no petition, group, or oppositional coverage tracked. Read that as nothing found, not as nothing there: absence of records is not evidence of local support.

Subscriber intel Subscribers

Researched for this county and available with a subscription:

Sign in to view

Energy-related meetings & dockets P1

solar · bess · data center

Halo color matches the energy category tagged on each meeting.

  • 2020-07-02 Other
    Solar

    The Comprehensive Plan Text Amendment for the Spring Grove Solar III, LLC project was approved.

  • 2020-03-05 County Board
    Solar

    Discussion of a solar project

  • 2020-02-06 Other
    Solar

    Spring Grove Solar III, LLC applied for an amendment to the Surry County Comprehensive Plan to rezone a property for industrial use.

  • 2018-05-03 County Board
    Solar

    Planning Commission discussed a solar project Conditional Use Permit application.

  • Planning Commission
    BESS

    Planning Commission reviewed a site plan for a solar generation facility with battery storage and approved it in substantial conformity with a preliminary site plan.

  • Planning Commission
    BESS

    IN THE GENERAL DISTRICT COURTROOM LOCATED AT THE SURRY COUNTY GOVERNMENT CENTER 45 SCHOOL STREET, SURRY, VIRGINIA TO CONSIDER AND INTENDS TO TAKE ACTION ON THE FOLLOWING: PC ORDINANCE AMENDMENT 2024-04: The Planning Commission will consider

  • Planning Commission
    Solar

    Surry County Comprehensive Plan amendment to designate a property as Industrial for a solar project

  • Planning Commission
    Solar

    Surry County Comprehensive Plan amendment to designate a property as Industrial for a solar project

  • Other
    BESS

    IN THE GENERAL DISTRICT COURTROOM LOCATED AT THE SURRY COUNTY GOVERNMENT CENTER 45 SCHOOL STREET, SURRY, VIRGINIA TO CONSIDER AND INTENDS TO TAKE ACTION ON THE FOLLOWING: PC ORDINANCE AMENDMENT 2024-04: The Planning Commission will consider

  • Other
    Solar

    Planning Commission heard a public hearing request for a 240 MW solar energy facility in Surry County.

  • County Board
    BESS

    The Board of Supervisors will consider an ordinance amendment initiated by Clenera, LLC to amend the Surry County Zoning Ordinance.

  • County Board
    Solar

    Board of Supervisors May 3, 2018 Meeting AGENDA NOTE Agenda Item: Order of Public Hearing – CUP 2018-03 and 2018-04 Spring Grove Solar, LLC I.

  • Planning Commission
    Solar

    Planning Commission will consider and intends to take action on amendments to the Solar Energy Ordinance.

  • Planning Commission
    Data Center

    County discussed a data center project, including its facilities and infrastructure.

  • Zoning Board
    Solar

    The Board of Supervisors directed the planning commission to hold a public hearing to consider an amendment to the County's zoning for solar photovoltaic projects.

  • County Board
    Solar

    IN THE GENERAL DISTRICT COURTROOM LOCATED AT THE SURRY COUNTY GOVERNMENT CENTER 45 SCHOOL STREET, SURRY, VIRGINIA TO CONSIDER AND INTENDS TO TAKE ACTION ON THE FOLLOWING: PC Ordinance Amendment 2024-02: The Board of Supervisors will conside

More energy-related meetings

Full records for this county are part of a SitePath subscription.

State PSC dockets P1

No tracked activity yet — coverage expands weekly.

Local news P3

Explore every US county on the interactive map

Filter by grade, state, moratorium status, and compliance stringency. Compare counties side by side.

Open the county map → SitePath home All Virginia counties
Data sources: public agendas/minutes from local government sites; PSC dockets from state regulators; news from GDELT and curated RSS. Last refreshed 2026-10-11. See the county risk scorecard or the full Virginia permitting index.