SitePath › Local intel › Virginia › Stafford County
Virginia

Solar permitting — Stafford County, Virginia

FIPS 51179

On file: public meetings, local news, known opposition groups.

B
Stafford County, VA
Risk score 41/100 · Full scorecard →
Compliance: Very HighTrajectory: StableSaturation: High

Rapidly suburbanizing Northern VA county; very limited utility-scale solar land; SUP pathway but minimal market opportunity. Permitting: SUP; 50-ft setback; very high compliance stringency. Track record: Multiple CUP approvals 2018–2…

Permitting process

Local permitting pathway

SUP

Setbacks & buffers

Stafford County-specific SE/SUP conditions control — county-set setbacks vary from 50 ft (rural) to 300+ ft (residential adjacent). Verify current Stafford County zoning ordinance for adopted local setback standards. — NOTE: the distances above are a STATE-level fallback, not a figure read from this county's own ordinance. We hold siting-rule records for this county which may include a stricter local limit we have not yet extracted. Verify against the county's own ordinance before relying on these.

Spacing requirements

None codified

Size restrictions

None codified

Penalties & bonding

No penalties or adjustments. Standard CUP/SUP process.

State-level permits & approvals

Local permit: Special Use Permit (SUP) or Conditional Use Permit (CUP) in A-1 Agricultural zoning; issued by Board of Supervisors (BOS) or Planning Commission per county ordinance. Counties without zoning (Buchanan, Russell, Lee, Scott, etc.) proceed via revenue-sharing siting agreements. SCC CPCN: Va. Code §56-580 (as amended by HB 1558/SB 762, eff. Jul 2021) — SCC Certificate of Public Convenience & Necessity required for generating facilities ≥5 MW; waivable for utility-owned projects under SCC-approved IRP. DEQ Permit by Rule (PBR): Required for all solar facilities ≥1 MW per Va. Code §10.1-1197.6; includes VSMP/VPDES erosion & stormwater permits. Mar 2022 DEQ rule: solar panels counted as impervious surface same as parking lots. Revenue sharing: Va. Code §15.2-2288.7 — localities may require up to $1,400/MW-year for utility-scale solar on agricultural or forestal land; increases 10% in year 1 then every 5 years thereafter. VDACS notice: VA Dept. of Agriculture & Consumer Services must be notified for projects converting prime agricultural or forestal land. PENDING LEGISLATION (as of Mar 11, 2026): HB 711 (Herring) / SB 347 (VanValkenburg) both cleared both chambers and await Gov. Spanberger's signature (session ends Mar 14, 2026). If signed: (1) all localities must allow solar ≥1 MW via special exception — outright bans illegal; (2) statewide setback floor: 150–200 ft non-participating dwellings, 50–100 ft from state roads, 100–250 ft from streams/wetlands, 50–75 ft from property lines; (3) localities retain denial authority but must report reasons to SCC public database; (4) companion HB 891/SB 443: BESS permitted accessory use on approved solar SE sites. Spanberger is pro-solar; signature expected. Monitor: lis.virginia.gov.

Full permitting requirements

Full records for this county are part of a SitePath subscription.

State policy & grid context

State RPS & clean energy policy

100% carbon-free by 2050 (Dominion), 2045 (APCo) | Virginia Clean Economy Act (2020) | Va. Code §56-585.5

State incentive programs

Virginia Clean Economy Act (VCEA, 2020): Dominion must reach 100% carbon-free by 2045; Appalachian Power by 2050; major driver of utility-scale solar procurement. Net metering: available under VCEA for systems up to 1 MW (by-right); large-scale behind-the-meter negotiated. SCC SolarShare: Dominion program offering renewable energy credits. Virtual net metering (Virginia): programs vary by utility. DEQ review: required for solar facilities ≥150 MW (permit by rule) or DEQ standalone review. Utility: Dominion Energy Virginia serves 2/3 of VA; Appalachian Power (AEP) serves western VA; Northern Virginia Electric Coop (NOVEC) serves NoVA exurbs; various rural cooperatives and municipal utilities.

Grid & interconnection

PJM / Dominion Energy Virginia (DEV) transmission zone

Full state policy & grid detail

Full records for this county are part of a SitePath subscription.

Battery storage (BESS) P1 State-Default Permitting

Standalone BESS (not co-located with approved solar): still requires county SE/SUP and host siting agreement

Local BESS ordinances & bylaws

County-level battery-storage status, safety requirements, and projects — each linked to a primary source.

Community opposition P1

Organized opposition signals on record for this county — petitions, community groups, and oppositional coverage — each linked to its primary source.

SitePath maintains the most complete community-opposition dataset available, refreshed continuously from primary sources.

Subscriber intel Subscribers

Researched for this county and available with a subscription:

Sign in to view

Energy-related meetings & dockets P1

data center · solar · bess · transmission

Halo color matches the energy category tagged on each meeting.

  • Other
    Solar

    Conditional Use Permit Application Enon Road Solar Farm Stafford County, VA Enon Road Solar Farm, LLC July 6, 2022 Contents 1.

  • Other
    Data Center

    Stafford County is considering a conditional use permit for a data center at the Kings Hill Substation.

  • Other
    Data Center

    Stafford County is considering a conditional use permit for a data center at the Kings Hill Substation.

  • County Board
    Data Center

    The Voting Board voted to budget and appropriate funds to acquire tax map parcels for a data center project.

  • Planning Commission
    Data Center

    28- 102, “Off Street Parking” to create the ICTP, Integrated Corporate and Technology Park Overlay Zoning District.

  • Other
    Solar

    Conditional Use Permit Application Enon Road Solar Farm Stafford County, VA Enon Road Solar Farm, LLC July 6, 2022 Contents 1.

  • Other
    Data Center

    Stafford County is considering a conditional use permit for a data center at the Kings Hill Substation.

  • Other
    Data Center

    Stafford County is considering a conditional use permit for a data center at the Kings Hill Substation.

  • County Board
    Data Center

    Authorization for the County Administrator to execute a Memorandum of Agreement for the Stafford Technology and Research Park.

  • Other
    Solar

    Stafford County updated policies for siting utility-scale solar facilities and affordable housing.

  • Planning Commission
    Data Center

    28- 102, “Off Street Parking” to create the ICTP, Integrated Corporate and Technology Park Overlay Zoning District.

  • Planning Commission
    Data Center

    28- 102, “Off Street Parking” to create the ICTP, Integrated Corporate and Technology Park Overlay Zoning District.

  • Other
    Data Center

    Stafford County government is asked to slow down data center development until its impacts are understood.

  • County Board
    Transmission

    Stafford County officials attended a public hearing for a Dominion Virginia Power transmission line project.

  • Zoning Board
    Data Center

    Stafford County is considering a conditional use permit for a data center at the Kings Hill Substation.

  • Planning Commission
    Data Center

    28- 102, “Off Street Parking” to create the ICTP, Integrated Corporate and Technology Park Overlay Zoning District.

  • Planning Commission
    Data Center

    28- 102, “Off Street Parking” to create the ICTP, Integrated Corporate and Technology Park Overlay Zoning District.

More energy-related meetings

Full records for this county are part of a SitePath subscription.

State PSC dockets P1

No tracked activity yet — coverage expands weekly.

Local news P3

Explore every US county on the interactive map

Filter by grade, state, moratorium status, and compliance stringency. Compare counties side by side.

Open the county map → SitePath home All Virginia counties
Data sources: public agendas/minutes from local government sites; PSC dockets from state regulators; news from GDELT and curated RSS. Last refreshed 2026-10-07. See the county risk scorecard or the full Virginia permitting index.