Solar permitting — Rockingham County, Virginia

FIPS 51165

35 indexed meetings (27 energy-related), 12 news items, 3 known opposition groups.

D
Rockingham County, VA
Risk score 64/100 · Full scorecard →
Compliance: ExtremeSolar ordinance on fileTrajectory: WorseningSaturation: Very High

Extremely Stringent ordinance; worsening trajectory. Permitting: SUP; 250-ft max / 150-ft min setbacks; hard 150-acre cap; extreme compliance stringency. Track record: denial on record — MCG Solar — SUP-23-1734; specifi…

Key driver: Extremely Stringent ordinance; worsening trajectory. HB 711/SB 347: statewide setback floor and SE requirement apply; any above-floor restrictions reviewable. Shenandoah Valley agricultural identity means board will use SE discretion aggressively; denials still likely but ban structure removed.

Permitting process

Local permitting pathway

SUP

Setbacks & buffers

150 ft from property lines for transformers/substation equipment. 250 ft minimum setback from existing occupied dwellings. Public meeting required before SUP application submission.

Spacing requirements

None codified

Size restrictions

≤50 acres per site under A-1, A-2, and most zoning districts (SUP required for each site)

Penalties & bonding

Total penalty: +5 (Denial +5)

State-level permits & approvals

Local permit: Special Use Permit (SUP) or Conditional Use Permit (CUP) in A-1 Agricultural zoning; issued by Board of Supervisors (BOS) or Planning Commission per county ordinance. Counties without zoning (Buchanan, Russell, Lee, Scott, etc.) proceed via revenue-sharing siting agreements. SCC CPCN: Va. Code §56-580 (as amended by HB 1558/SB 762, eff. Jul 2021) — SCC Certificate of Public Convenience & Necessity required for generating facilities ≥5 MW; waivable for utility-owned projects under SCC-approved IRP. DEQ Permit by Rule (PBR): Required for all solar facilities ≥1 MW per Va. Code §10.1-1197.6; includes VSMP/VPDES erosion & stormwater permits. Mar 2022 DEQ rule: solar panels counted as impervious surface same as parking lots. Revenue sharing: Va. Code §15.2-2288.7 — localities may require up to $1,400/MW-year for utility-scale solar on agricultural or forestal land; increases 10% in year 1 then every 5 years thereafter. VDACS notice: VA Dept. of Agriculture & Consumer Services must be notified for projects converting prime agricultural or forestal land. PENDING LEGISLATION (as of Mar 11, 2026): HB 711 (Herring) / SB 347 (VanValkenburg) both cleared both chambers and await Gov. Spanberger's signature (session ends Mar 14, 2026). If signed: (1) all localities must allow solar ≥1 MW via special exception — outright bans illegal; (2) statewide setback floor: 150–200 ft non-participating dwellings, 50–100 ft from state roads, 100–250 ft from streams/wetlands, 50–75 ft from property lines; (3) localities retain denial authority but must report reasons to SCC public database; (4) companion HB 891/SB 443: BESS permitted accessory use on approved solar SE sites. Spanberger is pro-solar; signature expected. Monitor: lis.virginia.gov.

🔒
Full permitting requirements

Full records for this county are part of a SitePath subscription.

State policy & grid context

State RPS & clean energy policy

100% carbon-free by 2050 (Dominion), 2045 (APCo) | Virginia Clean Economy Act (2020) | Va. Code §56-585.5

State incentive programs

Virginia Clean Economy Act (VCEA, 2020): Dominion must reach 100% carbon-free by 2045; Appalachian Power by 2050; major driver of utility-scale solar procurement. Net metering: available under VCEA for systems up to 1 MW (by-right); large-scale behind-the-meter negotiated. SCC SolarShare: Dominion program offering renewable energy credits. Virtual net metering (Virginia): programs vary by utility. DEQ review: required for solar facilities ≥150 MW (permit by rule) or DEQ standalone review. Utility: Dominion Energy Virginia serves 2/3 of VA; Appalachian Power (AEP) serves western VA; Northern Virginia Electric Coop (NOVEC) serves NoVA exurbs; various rural cooperatives and municipal utilities.

Grid & interconnection

PJM / Dominion Energy Virginia (DEV) / Shenandoah Valley zone

🔒
Full state policy & grid detail

Full records for this county are part of a SitePath subscription.

Battery storage (BESS) P1 State-Default Permitting

STANDALONE BESS SUP DENIED — Rockingham County BOS unanimously refused to grant Special Use Permit to Swift Current Energy (Buckeye/IFM Investors) for 'Rocktown Power' standalone BESS

Local BESS ordinances & bylaws

County-level battery-storage status, safety requirements, and projects — each linked to a primary source.

Community opposition P1 3 tracked

Organized opposition signals on record for this county — petitions, community groups, and oppositional coverage — each linked to its primary source.

SitePath maintains the most complete community-opposition dataset available, refreshed continuously from primary sources.

Subscriber intel Subscribers

Researched for this county and available with a subscription:

Sign in to view

Energy-related meetings & dockets P1

17 energy-related35 total in calendar10 solar · 4 bess · 1 transmission · 1 data center · 1 wind

Halo color = sentiment of the relevant agenda excerpt: green positive, yellow neutral, red negative.

  • 2026-03-03 Planning Commission
    Solar

    The Planning Commission voted to approve a solar energy facility in Rockingham County.

  • 2026-02-25 County Board
    BESS

    The Planning Commission approved a special-use permit application for a 150 MW solar farm.

  • 2026-02-11 County Board
    Solar

    The Rockingham County Planning Commission voted to approve a special-use permit application for a large solar energy facility.

  • 2026-02-03 Planning Commission
    BESS

    Approved ordinance amendment to bring Rockingham County Code into compliance with State Code requirements for energy storage system projects

  • 2026-01-06 Planning Commission
    Solar

    The Rockingham County Planning Commission approved the SolAmerica solar farm project.

  • Other
    Solar

    The Rockingham County Planning Commission voted to approve a special-use permit application for a 150 MW solar farm.

  • Other
    Transmission

    The Virginia Dominion Power company plans to replace transmission lines in Rockingham County.

  • Other
    Solar

    The Board of Supervisors approved a resolution supporting the solar project and authorizing the Clerk of Circuit Court to execute the necessary documents

  • Other
    Data Center

    The Lake Shenandoah Watershed Land Purchase and Improvements item was discussed.

  • Other
    BESS

    The Planning Commission approved a single-family dwelling development on Huckleberry Road, Elkton…

  • Other
    BESS

    The Board approved a proposal for an energy storage system on Craney Island Road.

  • Other
    Wind

    The Planning Commission voted to deny a special-use permit application for a 150 MW solar farm in Harrisonburg, Virginia.

  • County Board
    Solar

    Repealed and re-enacted ordinance to update solar energy facility regulations

  • County Board
    Solar

    The Co oper reviewed and discussed the Staff- Proposed Ordinance : Ground-Mount ed Large Solar Energy Facility

🔒
14 more energy-related meetings

Full records for this county are part of a SitePath subscription.

State PSC dockets P1

No tracked activity yet — coverage expands weekly.

Local news P3

Explore all 3,143 counties on the interactive map

Filter by grade, state, moratorium status, and compliance stringency. Compare counties side by side.

Open the county map → SitePath home All Virginia counties
Data sources: public agendas/minutes from local government sites; PSC dockets from state regulators; news from GDELT and curated RSS; sentiment derived from public meeting transcripts. Last refreshed 2026-08-21. See the county risk scorecard or the full Virginia permitting index.