Solar permitting — Rockingham County, Virginia
On file: public meetings, local news, known opposition groups.
Extremely Stringent ordinance; worsening trajectory. Permitting: SUP; 250-ft max / 150-ft min setbacks; hard 150-acre cap; extreme compliance stringency. Track record: denial on record — MCG Solar — SUP-23-1734; specifi…
Key driver: Extremely Stringent ordinance; worsening trajectory. HB 711/SB 347: statewide setback floor and SE requirement apply; any above-floor restrictions reviewable. Shenandoah Valley agricultural identity means board will use SE discretion aggressively; denials still likely but ban structure removed.
Permitting process
Local permitting pathway
SUP
Setbacks & buffers
150 ft from property lines for transformers/substation equipment. 250 ft minimum setback from existing occupied dwellings. Public meeting required before SUP application submission.
Spacing requirements
None codified
Size restrictions
≤50 acres per site under A-1, A-2, and most zoning districts (SUP required for each site)
Penalties & bonding
Total penalty: +5 (Denial +5)
State-level permits & approvals
Local permit: Special Use Permit (SUP) or Conditional Use Permit (CUP) in A-1 Agricultural zoning; issued by Board of Supervisors (BOS) or Planning Commission per county ordinance. Counties without zoning (Buchanan, Russell, Lee, Scott, etc.) proceed via revenue-sharing siting agreements. SCC CPCN: Va. Code §56-580 (as amended by HB 1558/SB 762, eff. Jul 2021) — SCC Certificate of Public Convenience & Necessity required for generating facilities ≥5 MW; waivable for utility-owned projects under SCC-approved IRP. DEQ Permit by Rule (PBR): Required for all solar facilities ≥1 MW per Va. Code §10.1-1197.6; includes VSMP/VPDES erosion & stormwater permits. Mar 2022 DEQ rule: solar panels counted as impervious surface same as parking lots. Revenue sharing: Va. Code §15.2-2288.7 — localities may require up to $1,400/MW-year for utility-scale solar on agricultural or forestal land; increases 10% in year 1 then every 5 years thereafter. VDACS notice: VA Dept. of Agriculture & Consumer Services must be notified for projects converting prime agricultural or forestal land. PENDING LEGISLATION (as of Mar 11, 2026): HB 711 (Herring) / SB 347 (VanValkenburg) both cleared both chambers and await Gov. Spanberger's signature (session ends Mar 14, 2026). If signed: (1) all localities must allow solar ≥1 MW via special exception — outright bans illegal; (2) statewide setback floor: 150–200 ft non-participating dwellings, 50–100 ft from state roads, 100–250 ft from streams/wetlands, 50–75 ft from property lines; (3) localities retain denial authority but must report reasons to SCC public database; (4) companion HB 891/SB 443: BESS permitted accessory use on approved solar SE sites. Spanberger is pro-solar; signature expected. Monitor: lis.virginia.gov.
Full records for this county are part of a SitePath subscription.
State policy & grid context
State RPS & clean energy policy
100% carbon-free by 2050 (Dominion), 2045 (APCo) | Virginia Clean Economy Act (2020) | Va. Code §56-585.5
State incentive programs
Virginia Clean Economy Act (VCEA, 2020): Dominion must reach 100% carbon-free by 2045; Appalachian Power by 2050; major driver of utility-scale solar procurement. Net metering: available under VCEA for systems up to 1 MW (by-right); large-scale behind-the-meter negotiated. SCC SolarShare: Dominion program offering renewable energy credits. Virtual net metering (Virginia): programs vary by utility. DEQ review: required for solar facilities ≥150 MW (permit by rule) or DEQ standalone review. Utility: Dominion Energy Virginia serves 2/3 of VA; Appalachian Power (AEP) serves western VA; Northern Virginia Electric Coop (NOVEC) serves NoVA exurbs; various rural cooperatives and municipal utilities.
Grid & interconnection
PJM / Dominion Energy Virginia (DEV) / Shenandoah Valley zone
Full records for this county are part of a SitePath subscription.
Battery storage (BESS) P1 State-Default Permitting
STANDALONE BESS SUP DENIED — Rockingham County BOS unanimously refused to grant Special Use Permit to Swift Current Energy (Buckeye/IFM Investors) for 'Rocktown Power' standalone BESS
Local BESS ordinances & bylaws
County-level battery-storage status, safety requirements, and projects — each linked to a primary source.
Community opposition P1
Organized opposition signals on record for this county — petitions, community groups, and oppositional coverage — each linked to its primary source.
- Virginia county officials deny Special Use Permit for BESS project Storage
- Petition · Oppose Timberville Solar Farm Project Solar
- Rockingham County supervisors reject solar farm proposal Solar
SitePath maintains the most complete community-opposition dataset available, refreshed continuously from primary sources.
Subscriber intel Subscribers
Researched for this county and available with a subscription:
- Project track record
- Developer intelligence
- Governing board
Energy-related meetings & dockets P1
Halo color matches the energy category tagged on each meeting.
- 2026-02-25 OtherSolar
Eligible Improvements for a C-PACE Loan include energy usage efficiency systems and other capital improvements that reduce energy consumption.
- 2025-09-10 OtherData Center
The Board removed OA25-1006 from the table to amend zoning regulations for Data Centers.
- 2024-09-11 OtherSolar
Three special-use permits for large-scale solar facilities were approved without waivers.
- 2024-06-26 OtherSolar
Eligible Improvements for a C-PACE Loan include energy usage efficiency systems and other capital improvements that reduce energy consumption.
- 2024-02-28 County BoardSolar
Amendment to Rockingham County Code to allow large and small solar energy facilities in various zoning districts.
- 2024-01-10 OtherSolar
Three special-use permits for large-scale solar facilities were approved without waivers.
- 2023-09-13 OtherSolar
Three special-use permits for large-scale solar facilities were approved without waivers.
- 2023-05-10 OtherSolar
Three special-use permits for large-scale solar facilities were approved without waivers.
- 2022-09-14 OtherSolar
Planning Commission considered a special-use permit application for a solar farm on Craney Island Road and Mt. Valley Road.
- 2021-09-22 OtherSolar
Eligible Improvements for a C-PACE Loan include energy usage efficiency systems and other capital improvements that reduce energy consumption.
- 2021-07-28 County BoardBESS
The Board of Supervisors discussed definitions for various terms related to a battery storage project.
- 2021-07-14 County BoardBESS
The Board of Supervisors discussed definitions for various terms related to a battery storage project.
- 2021-05-12 County BoardSolar
Planning Commission considered a special-use permit application for a solar farm on Craney Island Road and Mt. Valley Road.
- 2020-12-01 OtherData Center
Data Center Upgrade 7. Lake Shenandoah Watershed Land Purchase and Improvements 8.
- 2020-10-28 OtherData Center
The Board appointed a committee to review the data center project in the Technology Park.
- 2020-09-09 County BoardSolar
Planning Commission considered a special-use permit application for a solar farm on Craney Island Road and Mt. Valley Road.
- OtherBESS
The Board of Supervisors discussed definitions for various terms related to a battery storage project.
- OtherSolar
Planning Commission discussed a solar project at 103 5TH ST, GROTTOES, VA 24441
- OtherSolar
Planning Commission discussed a solar project at 103 5TH ST, GROTTOES, VA 24441
- OtherSolar
The Board of Supervisors discussed a solar project.
- OtherData Center
Administrator Paxton reminded the Board that SRI International reimburses the County for all maintenance expenses.
- OtherData Center
The Board removed OA25-1006 from the table to amend zoning regulations for Data Centers.
- OtherData Center
The Board appointed a committee to review the data center project in the Technology Park.
- Planning CommissionSolar
Rockingham County Code amendment to allow large and small solar energy facilities in various zoning districts.
- County BoardSolar
Amendment to Rockingham County Code to allow large and small solar energy facilities in various zoning districts.
Full records for this county are part of a SitePath subscription.
State PSC dockets P1
No tracked activity yet — coverage expands weekly.
Local news P3
- 2026-06-15 Clean Energy Wins Factor This Brief 6 15
- 2026-06-12 Renewable Energy News Elevate Renewables Sembcorp Mulilo Alinta Energy 53703
- 2026-06-12 New 250 Million Battery Energy Storage System Coming Rockingham County
- 2026-06-11 Elevate Arclight Bring Energy Storage Facility Online In Virginia
- 2026-04-20 Us Roundup Bess Developers Highlight Bring Your Own Capacity Model In Data Centre Announcements
- 2026-04-13 Elevate Secures 50M Rabobank Financing To Accelerate Battery Storage Project Powering Next Generation Data Centers 302740784
- 2026-01-16 Us Roundup Duke Energy Elevate Fluence With Brightnight And Cordelio Progress Bess Projects
- 2026-01-15 Elevate Renewables Acquires Major Battery 142733136
- 2026-01-15 Elevate Renewables Acquires Major Battery Storage Project In Pjm
- 2025-09-04 Swift Current Energy Closes Us242 Million Financing For Virginia Battery Storage Project
Filter by grade, state, moratorium status, and compliance stringency. Compare counties side by side.