Solar permitting — Pittsylvania County, Virginia
6 indexed meetings (6 energy-related), 11 news items, 7 known opposition groups.
17 projects / 11,539 acres; 2% per-zoning-district cap + one-mile spacing rule. Permitting: A-1; hard 2% countywide acreage cap; very high compliance stringency. Track record: denial on record — RESTRICTIVE: Pittsylvani…
Key driver: 17 projects / 11,539 acres; 2% per-zoning-district cap + one-mile spacing rule. Comprehensive rewrite underway 2025. HB 711/SB 347: caps and spacing rules reviewable under new statewide standards — ordinance terms above state floor may face SCC scrutiny after any future denial. Pittsylvania's scale and complexity make it a likely test case for the new denial-reporting requirement.
Permitting process
Local permitting pathway
A-1, M-1, M-2, Agricultural | Special Use Permit, SE
Setbacks & buffers
5-mile minimum distance required between utility-scale solar facilities. 2% acreage cap per zoning district (adopted Mar 2024 amendments). Source: Pittsylvania County Solar Development page pittsylvaniacountyva.gov
Spacing requirements
≤2 miles from existing high-voltage transmission; ≥1 mile from other solar facilities
Size restrictions
None codified per-project panel coverage limit; 2%-per-district cap is the binding constraint
Penalties & bonding
No penalties or adjustments. Standard CUP/SUP process.
State-level permits & approvals
Local permit: Special Use Permit (SUP) or Conditional Use Permit (CUP) in A-1 Agricultural zoning; issued by Board of Supervisors (BOS) or Planning Commission per county ordinance. Counties without zoning (Buchanan, Russell, Lee, Scott, etc.) proceed via revenue-sharing siting agreements. SCC CPCN: Va. Code §56-580 (as amended by HB 1558/SB 762, eff. Jul 2021) — SCC Certificate of Public Convenience & Necessity required for generating facilities ≥5 MW; waivable for utility-owned projects under SCC-approved IRP. DEQ Permit by Rule (PBR): Required for all solar facilities ≥1 MW per Va. Code §10.1-1197.6; includes VSMP/VPDES erosion & stormwater permits. Mar 2022 DEQ rule: solar panels counted as impervious surface same as parking lots. Revenue sharing: Va. Code §15.2-2288.7 — localities may require up to $1,400/MW-year for utility-scale solar on agricultural or forestal land; increases 10% in year 1 then every 5 years thereafter. VDACS notice: VA Dept. of Agriculture & Consumer Services must be notified for projects converting prime agricultural or forestal land. PENDING LEGISLATION (as of Mar 11, 2026): HB 711 (Herring) / SB 347 (VanValkenburg) both cleared both chambers and await Gov. Spanberger's signature (session ends Mar 14, 2026). If signed: (1) all localities must allow solar ≥1 MW via special exception — outright bans illegal; (2) statewide setback floor: 150–200 ft non-participating dwellings, 50–100 ft from state roads, 100–250 ft from streams/wetlands, 50–75 ft from property lines; (3) localities retain denial authority but must report reasons to SCC public database; (4) companion HB 891/SB 443: BESS permitted accessory use on approved solar SE sites. Spanberger is pro-solar; signature expected. Monitor: lis.virginia.gov.
Full records for this county are part of a SitePath subscription.
State policy & grid context
State RPS & clean energy policy
100% carbon-free by 2050 (Dominion), 2045 (APCo) | Virginia Clean Economy Act (2020) | Va. Code §56-585.5
State incentive programs
Virginia Clean Economy Act (VCEA, 2020): Dominion must reach 100% carbon-free by 2045; Appalachian Power by 2050; major driver of utility-scale solar procurement. Net metering: available under VCEA for systems up to 1 MW (by-right); large-scale behind-the-meter negotiated. SCC SolarShare: Dominion program offering renewable energy credits. Virtual net metering (Virginia): programs vary by utility. DEQ review: required for solar facilities ≥150 MW (permit by rule) or DEQ standalone review. Utility: Dominion Energy Virginia serves 2/3 of VA; Appalachian Power (AEP) serves western VA; Northern Virginia Electric Coop (NOVEC) serves NoVA exurbs; various rural cooperatives and municipal utilities.
Grid & interconnection
PJM / Appalachian Power (APCo) & Dominion split zone; verify by project location
Full records for this county are part of a SitePath subscription.
Battery storage (BESS) P1 State-Default Permitting
Standalone BESS (not co-located with approved solar): still requires county SE/SUP and host siting agreement
Local BESS ordinances & bylaws
County-level battery-storage status, safety requirements, and projects — each linked to a primary source.
Community opposition P1 7 tracked
Organized opposition signals on record for this county — petitions, community groups, and oppositional coverage — each linked to its primary source.
- r/Virginia on Reddit: Megasite project could be in jeopardy if data center tax exemptions are ended, finance secretary… Data center
- r/Virginia on Reddit: Virginia's Pittsylvania County Data Center and Gas Plant Proposal Faces Backlash: Local Residents Data center
- State would gain power to approve large solar and wind projects over local objections under proposed legislation Wind
- Concerned citizens meet to oppose power plant General
- A grassroots fight against data centers builds in rural Pittsylvania County Data center
- Concerned Citizens Chalk Level to Hold Concerned Citizens Community Meeting About Proposed Data Center and Power Plant i Data center
- Rural Virginia Community Defeats Massive Gas Plant and Data Center Proposal Data center
SitePath maintains the most complete community-opposition dataset available, refreshed continuously from primary sources.
Subscriber intel Subscribers
Researched for this county and available with a subscription:
- 🔒Project track record
- 🔒Developer intelligence
- 🔒Community & board sentiment
- 🔒Governing board
- 🔒Sentiment rollup
Energy-related meetings & dockets P1
Halo color = sentiment of the relevant agenda excerpt: green positive, yellow neutral, red negative.
- OtherBESS
The Pittsylvania County Planning Commission approved a special-use permit for a 6-megawatt solar power and energy storage facility in Danville.
- Zoning BoardBESS
The Planning Commission approved a draft of the battery storage project.
- Zoning BoardData Center
The Planning Commission approved a special-use permit application for a 150 MW solar farm in Pittsylvania County.
- OtherSolar
Pittsylvania County adopts comprehensive ordinance governing utility-scale solar development
Full records for this county are part of a SitePath subscription.
State PSC dockets P1
No tracked activity yet — coverage expands weekly.
Local news P3
- 2026-06-09 Rocky Forge Wind Farm To Wrap Construction By End Of 2026 Bringing Jobs And Tax Revenue Botetourt County June 2026
- 2026-05-19 Stack 100B Berry Hill Data Center Project
- 2026-05-06 Lawmakers Face Questions In Salem On Budget Delays Data Centers
- 2026-05-04 Virginia Court Case Could Influence Other Data Center Fights
- 2026-05-01 Microporous Pittsylvania Battery Plant Construction
- 2026-04-30 New Details Massive Data Center Planned Pittsylvania County
- 2026-04-17 Currents Energy Industry Insights V 10 6964306
- 2026-03-19 Budget Stalemate Data Center Tax Breaks Stall Virginia Spending Plan
- 2025-10-02 Pollution For Fluvanna Power For Data Centers Critics Say
- 2025-07-28 Restoring Common Sense To Americas Energy Policy
- 2025-07-23 Northern Virginia Wants To Become An Ai Hub From Energy To Education Heres What That Means For The Rest Of The State
Filter by grade, state, moratorium status, and compliance stringency. Compare counties side by side.