Compliance: LowNo local solar ordinanceTrajectory: StableSaturation: Low

Tri-Cities; economically distressed; some undeveloped land. Permitting: Petersburg: Site plan / CUP through city planning commission; hard N/A — independent city; limited developable land. Track record: no prior utility-scale solar on record —

Permitting process

Local permitting pathway

Petersburg: Site plan / CUP through city planning commission

Setbacks & buffers

No solar-specific setbacks; governed by general municipal zoning — NOTE: the distances above are a STATE-level fallback, not a figure read from this county's own ordinance. We hold siting-rule records for this county which may include a stricter local limit we have not yet extracted. Verify against the county's own ordinance before relying on these.

Spacing requirements

No spacing requirements codified

Size restrictions

No size restrictions codified

Penalties & bonding

No penalties or adjustments. Standard CUP/SUP process.

State-level permits & approvals

Local zoning approval via city council/planning commission; DEQ PBR for >5 MW; SCC PBR for 5–150 MW utility-scale under VCEA framework HB 711/SB 347 (signed Apr 13 2026, eff. July 1 2026): OUTRIGHT BANS and blanket exclusions on ≥1 MW solar in ag/commercial/industrial/institutional zones PROHIBITED. Localities must accept and review SE/SUP for every ≥1 MW application. Statewide minimum setbacks: 150–200 ft from adjacent houses; 50–100 ft from state roads; 100–250 ft from streams/wetlands. Decommissioning plan required + updated every 5 yrs. Denials reported to SCC public database. Counties CAN still DENY on case-by-case basis. VACo opposed; Virginia Farm Bureau opposed. Passed House 63-33 / Senate 21-17. Source: lis.virginia.gov/bill-details/20261/SB347

Full permitting requirements

Full records for this county are part of a SitePath subscription.

State policy & grid context

State RPS & clean energy policy

100% carbon-free by 2050 (Dominion), 2045 (APCo) | Virginia Clean Economy Act (2020) | Va. Code §56-585.5

State incentive programs

Virginia Clean Economy Act (VCEA); Dominion/AEP net metering (residential/commercial); state solar equipment tax exemption; locality solar revenue share option (SB 1258)

Grid & interconnection

PJM / Dominion zone

Full state policy & grid detail

Full records for this county are part of a SitePath subscription.

Battery storage (BESS) P1 State-Default Permitting

Standalone BESS (not co-located with approved solar): still requires county SE/SUP and host siting agreement

BESS ordinances & bylaws

County-level battery-storage status, safety requirements, and projects — each linked to a primary source.

Community opposition P1

No organized opposition on record for this county yet — no petition, group, or oppositional coverage tracked. Read that as nothing found, not as nothing there: absence of records is not evidence of local support.

Subscriber intel Subscribers

Researched for this county and available with a subscription:

Sign in to view

Energy-related meetings & dockets P1

solar · data center

Halo color matches the energy category tagged on each meeting.

  • 2021-09-01 Planning Commission
    Solar

    Planning Commission discussed a proposal for a commercial/industrial solar energy harvesting project.

  • 2021-09-01 Planning Commission
    Solar

    The use of commercial/industrial solar energy harvesting equipment is permitted in certain zoning districts with a special use permit.

  • 2017-01-03 Other
    Solar

    Planning Commission discussed a special use permit application for a solar farm.

  • Other
    Solar

    Jones Solar Energy Equipment proposed a change to the Local Property Tax exemption for solar projects.

  • City Council
    Data Center

    o Data Center. Retained as a by-right use in M-1 and M-2 Districts.

  • City Council
    Data Center

    In contrast, the City Council in Petersburg voted in favor of a data center, sending a clear message to the 7th Ward and the City as a whole.

More energy-related meetings

Full records for this county are part of a SitePath subscription.

State PSC dockets P1

No tracked activity yet — coverage expands weekly.

Local news P3

No tracked activity yet — coverage expands weekly.

Explore every US county on the interactive map

Filter by grade, state, moratorium status, and compliance stringency. Compare counties side by side.

Open the county map → SitePath home All Virginia counties
Data sources: public agendas/minutes from local government sites; PSC dockets from state regulators; news from GDELT and curated RSS. Last refreshed 2026-10-08. See the county risk scorecard or the full Virginia permitting index.