Solar permitting — Page County, Virginia
1 indexed meeting (1 energy-related).
🟠 HIGH-FRICTION JURISDICTION (Score 63/100, Grade D, deteriorating trajectory) — Strongest setbacks in Virginia: 1,200 ft from primary roads + 300-acre aggregate cap — functionally prohibitive. Permitting: SUP; 300-ft setback; hard 300-acre aggregate cap for all solar facilities county-wide;; very…
Key driver: Strongest setbacks in Virginia: 1,200 ft from primary roads + 300-acre aggregate cap — functionally prohibitive. CRITICAL: HB 711/SB 347 set a setback floor of 50–100 ft from roads. If signed, Page's 1,200 ft road setback — 12× the state maximum — is likely preempted. Could reopen development opportunity in northern/eastern portions of county.
Permitting process
Local permitting pathway
SUP, Special Use Permit, SE
Setbacks & buffers
Page County (Jun 28 2022): all aboveground infrastructure/equipment/structures including security fencing: ≥300 ft from property lines with existing dwellings. Other property line setbacks per underlying zoning. Viewshed analysis required using scaled elevation views and photographs.
Spacing requirements
≥2 miles from other utility-scale solar facilities; ≥1 mile from town boundaries; slope and farmland avoidance limits apply
Size restrictions
≤30 acres maximum panel coverage per project; ≤65% site coverage ratio
Penalties & bonding
No penalties or adjustments. Standard CUP/SUP process.
State-level permits & approvals
Local permit: Special Use Permit (SUP) or Conditional Use Permit (CUP) in A-1 Agricultural zoning; issued by Board of Supervisors (BOS) or Planning Commission per county ordinance. Counties without zoning (Buchanan, Russell, Lee, Scott, etc.) proceed via revenue-sharing siting agreements. SCC CPCN: Va. Code §56-580 (as amended by HB 1558/SB 762, eff. Jul 2021) — SCC Certificate of Public Convenience & Necessity required for generating facilities ≥5 MW; waivable for utility-owned projects under SCC-approved IRP. DEQ Permit by Rule (PBR): Required for all solar facilities ≥1 MW per Va. Code §10.1-1197.6; includes VSMP/VPDES erosion & stormwater permits. Mar 2022 DEQ rule: solar panels counted as impervious surface same as parking lots. Revenue sharing: Va. Code §15.2-2288.7 — localities may require up to $1,400/MW-year for utility-scale solar on agricultural or forestal land; increases 10% in year 1 then every 5 years thereafter. VDACS notice: VA Dept. of Agriculture & Consumer Services must be notified for projects converting prime agricultural or forestal land. PENDING LEGISLATION (as of Mar 11, 2026): HB 711 (Herring) / SB 347 (VanValkenburg) both cleared both chambers and await Gov. Spanberger's signature (session ends Mar 14, 2026). If signed: (1) all localities must allow solar ≥1 MW via special exception — outright bans illegal; (2) statewide setback floor: 150–200 ft non-participating dwellings, 50–100 ft from state roads, 100–250 ft from streams/wetlands, 50–75 ft from property lines; (3) localities retain denial authority but must report reasons to SCC public database; (4) companion HB 891/SB 443: BESS permitted accessory use on approved solar SE sites. Spanberger is pro-solar; signature expected. Monitor: lis.virginia.gov.
Full records for this county are part of a SitePath subscription.
State policy & grid context
State RPS & clean energy policy
100% carbon-free by 2050 (Dominion), 2045 (APCo) | Virginia Clean Economy Act (2020) | Va. Code §56-585.5
State incentive programs
Virginia Clean Economy Act (VCEA, 2020): Dominion must reach 100% carbon-free by 2045; Appalachian Power by 2050; major driver of utility-scale solar procurement. Net metering: available under VCEA for systems up to 1 MW (by-right); large-scale behind-the-meter negotiated. SCC SolarShare: Dominion program offering renewable energy credits. Virtual net metering (Virginia): programs vary by utility. DEQ review: required for solar facilities ≥150 MW (permit by rule) or DEQ standalone review. Utility: Dominion Energy Virginia serves 2/3 of VA; Appalachian Power (AEP) serves western VA; Northern Virginia Electric Coop (NOVEC) serves NoVA exurbs; various rural cooperatives and municipal utilities.
Grid & interconnection
PJM / Dominion Energy Virginia (DEV) / Shenandoah Valley zone
Full records for this county are part of a SitePath subscription.
Community opposition P1
No organized opposition on record for this county yet — no petition, group, or oppositional coverage tracked. Absence of opposition is a positive siting signal.
Subscriber intel Subscribers
Researched for this county and available with a subscription:
- 🔒Project track record
- 🔒Developer intelligence
- 🔒Community & board sentiment
- 🔒Governing board
- 🔒Sentiment rollup
Energy-related meetings & dockets P1
1 meeting indexed for this jurisdiction; none flagged as discussing solar, BESS, data centers, wind, or transmission yet. Coverage expands weekly.
State PSC dockets P1
No tracked activity yet — coverage expands weekly.
Local news P3
No tracked activity yet — coverage expands weekly.
Filter by grade, state, moratorium status, and compliance stringency. Compare counties side by side.