Solar permitting — Nottoway County, Virginia
On file: public meetings, known opposition groups.
Moratorium lifted Apr 2025 with 40-acre panel cap — effectively prohibitive for utility-scale. Permitting: SE; hard 40-acre maximum panel coverage cap per facility (Nottoway Co; very high compliance stringen…
Key driver: Moratorium lifted Apr 2025 with 40-acre panel cap — effectively prohibitive for utility-scale. HB 711/SB 347: 40-acre cap as functional ban likely challenged; state setback floor of 150–200 ft replaces any more-restrictive local setbacks. Monitor whether Nottoway amends ordinance proactively post-enactment.
Permitting process
Local permitting pathway
SE
Setbacks & buffers
40-acre maximum panel coverage per facility (adopted Apr 17 2025 — setback language potentially creates de facto ban for large projects). Prior moratorium enacted 2024, lifted Apr 2025 with new restrictive ordinance. Source: nottoway.org/_T8_R180.php
Spacing requirements
None codified
Size restrictions
≤40 acres under panels per project; ≤300 acres total project area including buffers
State-level permits & approvals
Local permit: Special Use Permit (SUP) or Conditional Use Permit (CUP) in A-1 Agricultural zoning; issued by Board of Supervisors (BOS) or Planning Commission per county ordinance. Counties without zoning (Buchanan, Russell, Lee, Scott, etc.) proceed via revenue-sharing siting agreements. SCC CPCN: Va. Code §56-580 (as amended by HB 1558/SB 762, eff. Jul 2021) — SCC Certificate of Public Convenience & Necessity required for generating facilities ≥5 MW; waivable for utility-owned projects under SCC-approved IRP. DEQ Permit by Rule (PBR): Required for all solar facilities ≥1 MW per Va. Code §10.1-1197.6; includes VSMP/VPDES erosion & stormwater permits. Mar 2022 DEQ rule: solar panels counted as impervious surface same as parking lots. Revenue sharing: Va. Code §15.2-2288.7 — localities may require up to $1,400/MW-year for utility-scale solar on agricultural or forestal land; increases 10% in year 1 then every 5 years thereafter. VDACS notice: VA Dept. of Agriculture & Consumer Services must be notified for projects converting prime agricultural or forestal land. PENDING LEGISLATION (as of Mar 11, 2026): HB 711 (Herring) / SB 347 (VanValkenburg) both cleared both chambers and await Gov. Spanberger's signature (session ends Mar 14, 2026). If signed: (1) all localities must allow solar ≥1 MW via special exception — outright bans illegal; (2) statewide setback floor: 150–200 ft non-participating dwellings, 50–100 ft from state roads, 100–250 ft from streams/wetlands, 50–75 ft from property lines; (3) localities retain denial authority but must report reasons to SCC public database; (4) companion HB 891/SB 443: BESS permitted accessory use on approved solar SE sites. Spanberger is pro-solar; signature expected. Monitor: lis.virginia.gov.
Full records for this county are part of a SitePath subscription.
State policy & grid context
State RPS & clean energy policy
100% carbon-free by 2050 (Dominion), 2045 (APCo) | Virginia Clean Economy Act (2020) | Va. Code §56-585.5
State incentive programs
Virginia Clean Economy Act (VCEA, 2020): Dominion must reach 100% carbon-free by 2045; Appalachian Power by 2050; major driver of utility-scale solar procurement. Net metering: available under VCEA for systems up to 1 MW (by-right); large-scale behind-the-meter negotiated. SCC SolarShare: Dominion program offering renewable energy credits. Virtual net metering (Virginia): programs vary by utility. DEQ review: required for solar facilities ≥150 MW (permit by rule) or DEQ standalone review. Utility: Dominion Energy Virginia serves 2/3 of VA; Appalachian Power (AEP) serves western VA; Northern Virginia Electric Coop (NOVEC) serves NoVA exurbs; various rural cooperatives and municipal utilities.
Grid & interconnection
PJM / Dominion Energy Virginia (DEV) transmission zone
Full records for this county are part of a SitePath subscription.
Battery storage (BESS) P1 State-Default Permitting
Standalone BESS (not co-located with approved solar): still requires county SE/SUP and host siting agreement
BESS ordinances & bylaws
County-level battery-storage status, safety requirements, and projects — each linked to a primary source.
Community opposition P1
Organized opposition signals on record for this county — petitions, community groups, and oppositional coverage — each linked to its primary source.
- More Virginia Counties Are Seeking Solar Moratoriums, But Are They Legal? Solar
- Some in Southside feel overwhelmed by solar farms Solar
SitePath maintains the most complete community-opposition dataset available, refreshed continuously from primary sources.
Subscriber intel Subscribers
Researched for this county and available with a subscription:
- Project track record
- Developer intelligence
- Governing board
Energy-related meetings & dockets P1
Halo color matches the energy category tagged on each meeting.
- OtherSolar
Courthouse Road, Nottoway, VA To Include a Public Hearing for and Consider Approval of the Rocky Ford Solar Facility Siting Agreement Rocky Ford Solar Siting Agreement With Exhibits Rocky Ford Solar Performance Agreement to be considered by
State PSC dockets P1
No tracked activity yet — coverage expands weekly.
Local news P3
No tracked activity yet — coverage expands weekly.
Filter by grade, state, moratorium status, and compliance stringency. Compare counties side by side.