SitePath › Local intel › Virginia › Nelson County
Virginia

Solar permitting — Nelson County, Virginia

FIPS 51125

On file: public meetings, local news.

C
Nelson County, VA
Risk score 49/100 · Full scorecard →
Compliance: HighTrajectory: StableSaturation: Moderate

SUP pathway; scenic/winery county with rural character sensitivity; moderate siting friction. Permitting: A-1; 50-ft setback. Track record: Multiple CUP approvals 2019–2023. Political environment: Republican majority; community: caut…

Permitting process

Local permitting pathway

A-1, Agricultural | SUP

Setbacks & buffers

Nelson County-specific SE/SUP conditions control — county-set setbacks vary from 50 ft (rural) to 300+ ft (residential adjacent). Verify current Nelson County zoning ordinance for adopted local setback standards. — NOTE: the distances above are a STATE-level fallback, not a figure read from this county's own ordinance. We hold siting-rule records for this county which may include a stricter local limit we have not yet extracted. Verify against the county's own ordinance before relying on these.

Spacing requirements

Scenic corridor protections emphasized.

Size restrictions

None codified

Penalties & bonding

No penalties or adjustments. Standard CUP/SUP process.

State-level permits & approvals

Local permit: Special Use Permit (SUP) or Conditional Use Permit (CUP) in A-1 Agricultural zoning; issued by Board of Supervisors (BOS) or Planning Commission per county ordinance. Counties without zoning (Buchanan, Russell, Lee, Scott, etc.) proceed via revenue-sharing siting agreements. SCC CPCN: Va. Code §56-580 (as amended by HB 1558/SB 762, eff. Jul 2021) — SCC Certificate of Public Convenience & Necessity required for generating facilities ≥5 MW; waivable for utility-owned projects under SCC-approved IRP. DEQ Permit by Rule (PBR): Required for all solar facilities ≥1 MW per Va. Code §10.1-1197.6; includes VSMP/VPDES erosion & stormwater permits. Mar 2022 DEQ rule: solar panels counted as impervious surface same as parking lots. Revenue sharing: Va. Code §15.2-2288.7 — localities may require up to $1,400/MW-year for utility-scale solar on agricultural or forestal land; increases 10% in year 1 then every 5 years thereafter. VDACS notice: VA Dept. of Agriculture & Consumer Services must be notified for projects converting prime agricultural or forestal land. PENDING LEGISLATION (as of Mar 11, 2026): HB 711 (Herring) / SB 347 (VanValkenburg) both cleared both chambers and await Gov. Spanberger's signature (session ends Mar 14, 2026). If signed: (1) all localities must allow solar ≥1 MW via special exception — outright bans illegal; (2) statewide setback floor: 150–200 ft non-participating dwellings, 50–100 ft from state roads, 100–250 ft from streams/wetlands, 50–75 ft from property lines; (3) localities retain denial authority but must report reasons to SCC public database; (4) companion HB 891/SB 443: BESS permitted accessory use on approved solar SE sites. Spanberger is pro-solar; signature expected. Monitor: lis.virginia.gov.

Full permitting requirements

Full records for this county are part of a SitePath subscription.

State policy & grid context

State RPS & clean energy policy

100% carbon-free by 2050 (Dominion), 2045 (APCo) | Virginia Clean Economy Act (2020) | Va. Code §56-585.5

State incentive programs

Virginia Clean Economy Act (VCEA, 2020): Dominion must reach 100% carbon-free by 2045; Appalachian Power by 2050; major driver of utility-scale solar procurement. Net metering: available under VCEA for systems up to 1 MW (by-right); large-scale behind-the-meter negotiated. SCC SolarShare: Dominion program offering renewable energy credits. Virtual net metering (Virginia): programs vary by utility. DEQ review: required for solar facilities ≥150 MW (permit by rule) or DEQ standalone review. Utility: Dominion Energy Virginia serves 2/3 of VA; Appalachian Power (AEP) serves western VA; Northern Virginia Electric Coop (NOVEC) serves NoVA exurbs; various rural cooperatives and municipal utilities.

Grid & interconnection

PJM / Dominion Energy Virginia (DEV) transmission zone

Full state policy & grid detail

Full records for this county are part of a SitePath subscription.

Battery storage (BESS) P1 State-Default Permitting

Standalone BESS (not co-located with approved solar): still requires county SE/SUP and host siting agreement

Local BESS ordinances & bylaws

County-level battery-storage status, safety requirements, and projects — each linked to a primary source.

Community opposition P1

No organized opposition on record for this county yet — no petition, group, or oppositional coverage tracked. Read that as nothing found, not as nothing there: absence of records is not evidence of local support.

Subscriber intel Subscribers

Researched for this county and available with a subscription:

Sign in to view

Energy-related meetings & dockets P1

solar · bess · data center

Halo color matches the energy category tagged on each meeting.

  • 2024-05-22 Planning Commission
    Solar

    Planning Commission to consider Wild Rose Solar Special Use Permit application

  • 2022-08-09 Zoning Board
    Solar

    Solar Energy Ordinance § 22A-1 – 22A-11 Art. 23.

  • Other
    Solar

    Amherst County's Planning Commission unanimously voted to deny a special exception request for a solar project due to view shed and environmental concerns.

  • Other
    BESS

    She then noted that they had about 90 projects in solar development and battery storage development across 27 states.

  • County Board
    BESS

    Nelson County considers siting agreements for two 4MW battery energy storage systems in Colleen and Piney River.

  • County Board
    Solar

    Planning Commission discussed a special-use permit for the Wild Rose Solar project, citing potential legal issues.

  • Other
    Solar

    Planning Commission discussed a special-use permit for the Wild Rose Solar Project in Gladstone, South District.

  • County Board
    Solar

    The Board of Supervisors discussed a large solar energy system project, Wild Rose, and its associated application and siting agreement.

  • Other
    BESS

    Nelson County discussed a utility-scale solar and battery storage development project by Savion, a subsidiary of Shell.

  • Other
    Solar

    Staff and Mr. Payne met with Savion staff and their legal team for an initial siting agreement discussion regarding the Savion/Wild Rose Solar project.

  • Other
    Solar

    Amherst County Solar Project: County Administration was advised by Amherst County of a Special Exception Request by Piney River Solar, LLC for a utility- scale project on property in Amherst County that adjoins the Virginia Blue Ridge Railw

  • County Board
    BESS

    Nelson County considers siting agreements for two 4MW battery energy storage systems.

  • Other
    Data Center

    County officials discussed the benefits of hosting a data center in Zions Crossroads to reduce network issues and traffic.

More energy-related meetings

Full records for this county are part of a SitePath subscription.

State PSC dockets P1

No tracked activity yet — coverage expands weekly.

Local news P3

Explore every US county on the interactive map

Filter by grade, state, moratorium status, and compliance stringency. Compare counties side by side.

Open the county map → SitePath home All Virginia counties
Data sources: public agendas/minutes from local government sites; PSC dockets from state regulators; news from GDELT and curated RSS. Last refreshed 2026-10-07. See the county risk scorecard or the full Virginia permitting index.