Solar permitting — Mecklenburg County, Virginia
17 indexed meetings (11 energy-related), 2 news items, 2 known opposition groups.
Board of Supervisors voted unanimously April 14 2025 to REMOVE utility-scale solar as a permitted use (revised Article 20); all-Republican board (Fisher, Graham, Massengill, McGhee, Clanton). NOTE: Virginia HB 711/SB 347 (eff. July 1, 2…
Key driver: Article 20 (Apr 2025) removes utility-scale as permitted use — functional ban. CRITICAL: HB 711/SB 347 — if signed, Mecklenburg's ban becomes illegal and must be repealed or amended to allow SE applications. Risk trajectory shifts from Worsening toward Stable once legislation signed, but board hostility remains; denials via SE process still possible.
Permitting process
Local permitting pathway
Utility-scale solar removed (no longer allowed as new land use); small/medium-scale allowed with limits in specified districts.
Setbacks & buffers
Mecklenburg County-specific SE/SUP conditions control — county-set setbacks vary from 50 ft (rural) to 300+ ft (residential adjacent). Verify current Mecklenburg County zoning ordinance for adopted local setback standards.
Spacing requirements
Ordinance amendment packet references distance controls relative to other solar facilities (applied to remaining categories).
Size restrictions
Utility-scale removed; remaining categories include acreage limits (see amendment packet).
Penalties & bonding
Total penalty: +5 (Denial +5)
State-level permits & approvals
Local permit: Special Use Permit (SUP) or Conditional Use Permit (CUP) in A-1 Agricultural zoning; issued by Board of Supervisors (BOS) or Planning Commission per county ordinance. Counties without zoning (Buchanan, Russell, Lee, Scott, etc.) proceed via revenue-sharing siting agreements. SCC CPCN: Va. Code §56-580 (as amended by HB 1558/SB 762, eff. Jul 2021) — SCC Certificate of Public Convenience & Necessity required for generating facilities ≥5 MW; waivable for utility-owned projects under SCC-approved IRP. DEQ Permit by Rule (PBR): Required for all solar facilities ≥1 MW per Va. Code §10.1-1197.6; includes VSMP/VPDES erosion & stormwater permits. Mar 2022 DEQ rule: solar panels counted as impervious surface same as parking lots. Revenue sharing: Va. Code §15.2-2288.7 — localities may require up to $1,400/MW-year for utility-scale solar on agricultural or forestal land; increases 10% in year 1 then every 5 years thereafter. VDACS notice: VA Dept. of Agriculture & Consumer Services must be notified for projects converting prime agricultural or forestal land. PENDING LEGISLATION (as of Mar 11, 2026): HB 711 (Herring) / SB 347 (VanValkenburg) both cleared both chambers and await Gov. Spanberger's signature (session ends Mar 14, 2026). If signed: (1) all localities must allow solar ≥1 MW via special exception — outright bans illegal; (2) statewide setback floor: 150–200 ft non-participating dwellings, 50–100 ft from state roads, 100–250 ft from streams/wetlands, 50–75 ft from property lines; (3) localities retain denial authority but must report reasons to SCC public database; (4) companion HB 891/SB 443: BESS permitted accessory use on approved solar SE sites. Spanberger is pro-solar; signature expected. Monitor: lis.virginia.gov.
Full records for this county are part of a SitePath subscription.
State policy & grid context
State RPS & clean energy policy
100% carbon-free by 2050 (Dominion), 2045 (APCo) | Virginia Clean Economy Act (2020) | Va. Code §56-585.5
State incentive programs
Virginia Clean Economy Act (VCEA, 2020): Dominion must reach 100% carbon-free by 2045; Appalachian Power by 2050; major driver of utility-scale solar procurement. Net metering: available under VCEA for systems up to 1 MW (by-right); large-scale behind-the-meter negotiated. SCC SolarShare: Dominion program offering renewable energy credits. Virtual net metering (Virginia): programs vary by utility. DEQ review: required for solar facilities ≥150 MW (permit by rule) or DEQ standalone review. Utility: Dominion Energy Virginia serves 2/3 of VA; Appalachian Power (AEP) serves western VA; Northern Virginia Electric Coop (NOVEC) serves NoVA exurbs; various rural cooperatives and municipal utilities.
Grid & interconnection
PJM / Dominion Energy Virginia (DEV) transmission zone
Full records for this county are part of a SitePath subscription.
Battery storage (BESS) P1 State-Default Permitting
Standalone BESS (not co-located with approved solar): still requires county SE/SUP and host siting agreement
Local BESS ordinances & bylaws
County-level battery-storage status, safety requirements, and projects — each linked to a primary source.
Community opposition P1 2 tracked
Organized opposition signals on record for this county — petitions, community groups, and oppositional coverage — each linked to its primary source.
- Mecklenburg County blocks future large-scale solar development Solar
- Why it’s better to let counties review solar projects case-by-case • Virginia Mercury Solar
SitePath maintains the most complete community-opposition dataset available, refreshed continuously from primary sources.
Subscriber intel Subscribers
Researched for this county and available with a subscription:
- 🔒Project track record
- 🔒Developer intelligence
- 🔒Community & board sentiment
- 🔒Governing board
- 🔒Sentiment rollup
Energy-related meetings & dockets P1
Halo color = sentiment of the relevant agenda excerpt: green positive, yellow neutral, red negative.
- County BoardSolar
County Administrator approved extension of Planning Commission's review of Antlers Road Solar Project
- Planning CommissionSolar
Mecklenburg County Planning Commission approved a public hearing for a solar project with no changes
- OtherSolar
The Mecklenburg County Board of Supervisors voted to deny a special-use permit application for a 150 MW solar farm proposed by Antlers Road Solar, LLC.
- County BoardSolar
The Mecklenburg County Planning Commission voted to deny a commercial/solar permit application for a 150 MW solar farm.
- County BoardSolar
The Board of Supervisors approved a proposal for a solar facility sitting agreement with Dominion Energy Virginia.
- Zoning BoardSolar
The Planning Commission voted to approve a special-use permit application for a 150 MW solar farm
- County BoardSolar
The Grasshopper Solar Project was approved for development and construction.
- County BoardData Center
The Mecklenburg County Planning Commission approved a special-use permit application for a 150 MW solar farm.
Full records for this county are part of a SitePath subscription.
State PSC dockets P1
No tracked activity yet — coverage expands weekly.
Local news P3
Filter by grade, state, moratorium status, and compliance stringency. Compare counties side by side.