Solar permitting — King and Queen County, Virginia
On file: public meetings.
Protective but allows projects via CUP; strong emphasis on agriculture/forestry; uses a revenue share framework. Permitting: SUP; 50-ft setback. Track record: denial on record — None confirmed — Walnut Solar 149.9 MW under con…
Permitting process
Local permitting pathway
SUP, CUP, SE
Setbacks & buffers
King And Queen County-specific SE/SUP conditions control — county-set setbacks vary from 50 ft (rural) to 300+ ft (residential adjacent). Verify current King And Queen County zoning ordinance for adopted local setback standards. — NOTE: the distances above are a STATE-level fallback, not a figure read from this county's own ordinance. We hold siting-rule records for this county which may include a stricter local limit we have not yet extracted. Verify against the county's own ordinance before relying on these.
Spacing requirements
Prime farmland avoidance stressed.
Size restrictions
None codified; managed via CUP conditions
Penalties & bonding
No penalties or adjustments. Standard CUP/SUP process.
State-level permits & approvals
Local permit: Special Use Permit (SUP) or Conditional Use Permit (CUP) in A-1 Agricultural zoning; issued by Board of Supervisors (BOS) or Planning Commission per county ordinance. Counties without zoning (Buchanan, Russell, Lee, Scott, etc.) proceed via revenue-sharing siting agreements. SCC CPCN: Va. Code §56-580 (as amended by HB 1558/SB 762, eff. Jul 2021) — SCC Certificate of Public Convenience & Necessity required for generating facilities ≥5 MW; waivable for utility-owned projects under SCC-approved IRP. DEQ Permit by Rule (PBR): Required for all solar facilities ≥1 MW per Va. Code §10.1-1197.6; includes VSMP/VPDES erosion & stormwater permits. Mar 2022 DEQ rule: solar panels counted as impervious surface same as parking lots. Revenue sharing: Va. Code §15.2-2288.7 — localities may require up to $1,400/MW-year for utility-scale solar on agricultural or forestal land; increases 10% in year 1 then every 5 years thereafter. VDACS notice: VA Dept. of Agriculture & Consumer Services must be notified for projects converting prime agricultural or forestal land. PENDING LEGISLATION (as of Mar 11, 2026): HB 711 (Herring) / SB 347 (VanValkenburg) both cleared both chambers and await Gov. Spanberger's signature (session ends Mar 14, 2026). If signed: (1) all localities must allow solar ≥1 MW via special exception — outright bans illegal; (2) statewide setback floor: 150–200 ft non-participating dwellings, 50–100 ft from state roads, 100–250 ft from streams/wetlands, 50–75 ft from property lines; (3) localities retain denial authority but must report reasons to SCC public database; (4) companion HB 891/SB 443: BESS permitted accessory use on approved solar SE sites. Spanberger is pro-solar; signature expected. Monitor: lis.virginia.gov.
Full records for this county are part of a SitePath subscription.
State policy & grid context
State RPS & clean energy policy
100% carbon-free by 2050 (Dominion), 2045 (APCo) | Virginia Clean Economy Act (2020) | Va. Code §56-585.5
State incentive programs
Virginia Clean Economy Act (VCEA, 2020): Dominion must reach 100% carbon-free by 2045; Appalachian Power by 2050; major driver of utility-scale solar procurement. Net metering: available under VCEA for systems up to 1 MW (by-right); large-scale behind-the-meter negotiated. SCC SolarShare: Dominion program offering renewable energy credits. Virtual net metering (Virginia): programs vary by utility. DEQ review: required for solar facilities ≥150 MW (permit by rule) or DEQ standalone review. Utility: Dominion Energy Virginia serves 2/3 of VA; Appalachian Power (AEP) serves western VA; Northern Virginia Electric Coop (NOVEC) serves NoVA exurbs; various rural cooperatives and municipal utilities.
Grid & interconnection
PJM / Dominion Energy Virginia (DEV) transmission zone
Full records for this county are part of a SitePath subscription.
Battery storage (BESS) P1 State-Default Permitting
Standalone BESS (not co-located with approved solar): still requires county SE/SUP and host siting agreement
Local BESS ordinances & bylaws
County-level battery-storage status, safety requirements, and projects — each linked to a primary source.
Community opposition P1
No organized opposition on record for this county yet — no petition, group, or oppositional coverage tracked. Read that as nothing found, not as nothing there: absence of records is not evidence of local support.
Subscriber intel Subscribers
Researched for this county and available with a subscription:
- Project track record
- Developer intelligence
- Governing board
Energy-related meetings & dockets P1
Halo color matches the energy category tagged on each meeting.
- 2026-02-20 OtherSolar
Approved a conditional use permit for utility scale solar facilities in Agricultural zoning district.
- 2025-11-12 Planning CommissionData Center
King and Queen County Commission is preparing for potential data center applications by reviewing their work.
- 2025-06-20 County BoardSolar
Planning Commission discussed a zoning ordinance change for solar facilities in agricultural zoning
- 2024-08-05 Planning CommissionBESS
Discussion of battery storage project in King and Queen County
- 2024-07-20 County BoardData Center
Staff is researching the possibility of a data center in King and Queen County.
- 2023-12-20 County BoardSolar
Solar facilities shall be reviewed for substantial accord with the comprehensive plan in accordance with VA State Code 15.2-2232(H) which states “A solar facility subject to subsection (A) shall be deemed to be substantially in accord with
- 2023-11-10 Planning CommissionSolar
The transaction involved is: Walnut Solar Project 2. My personal interest affected by this transaction is: I have a direct financial interest in the outcome of this application/transaction.
- 2023-11-01 Planning CommissionSolar
CUP18-01 and SP18-04 – Open Road Renewables - Walnut Solar I, LLC (public hearing – Continued from December 2, 2019) Milton Watkins stated that he will reconvene the public hearing for CUP18-01 and SP18-04, Open Road Renewables, Walnut Sola
- OtherBESS
The county hereby assesses: (i) a revenue share of $1,400 per megawatt, as measured in alternating current (AC) generation capacity of the nameplate capacity of the facility based upon submissions by the facility owner to the interconnectin
Full records for this county are part of a SitePath subscription.
State PSC dockets P1
No tracked activity yet — coverage expands weekly.
Local news P3
No tracked activity yet — coverage expands weekly.
Filter by grade, state, moratorium status, and compliance stringency. Compare counties side by side.