Solar permitting — Hampton city, Virginia
115 indexed meetings (0 energy-related), 15 news items.
Hampton Roads military city; limited undeveloped land. Permitting: Hampton: Site plan / CUP through city planning commission; hard N/A — independent city; limited developable land. Track record: no prior utility-scale solar on record — greenfie…
Permitting process
Local permitting pathway
Hampton: Site plan / CUP through city planning commission
Setbacks & buffers
No solar-specific setbacks; governed by general municipal zoning
Spacing requirements
No spacing requirements codified
Size restrictions
No size restrictions codified
Penalties & bonding
No penalties or adjustments. Standard CUP/SUP process.
State-level permits & approvals
Local zoning approval via city council/planning commission; DEQ PBR for >5 MW; SCC PBR for 5–150 MW utility-scale under VCEA framework HB 711/SB 347 (signed Apr 13 2026, eff. July 1 2026): OUTRIGHT BANS and blanket exclusions on ≥1 MW solar in ag/commercial/industrial/institutional zones PROHIBITED. Localities must accept and review SE/SUP for every ≥1 MW application. Statewide minimum setbacks: 150–200 ft from adjacent houses; 50–100 ft from state roads; 100–250 ft from streams/wetlands. Decommissioning plan required + updated every 5 yrs. Denials reported to SCC public database. Counties CAN still DENY on case-by-case basis. VACo opposed; Virginia Farm Bureau opposed. Passed House 63-33 / Senate 21-17. Source: lis.virginia.gov/bill-details/20261/SB347
Full records for this county are part of a SitePath subscription.
State policy & grid context
State RPS & clean energy policy
100% carbon-free by 2050 (Dominion), 2045 (APCo) | Virginia Clean Economy Act (2020) | Va. Code §56-585.5
State incentive programs
Virginia Clean Economy Act (VCEA); Dominion/AEP net metering (residential/commercial); state solar equipment tax exemption; locality solar revenue share option (SB 1258)
Grid & interconnection
PJM / Dominion zone
Full records for this county are part of a SitePath subscription.
Battery storage (BESS) P1 State-Default Permitting
Standalone BESS (not co-located with approved solar): still requires county SE/SUP and host siting agreement
Local BESS ordinances & bylaws
County-level battery-storage status, safety requirements, and projects — each linked to a primary source.
Community opposition P1
No organized opposition on record for this county yet — no petition, group, or oppositional coverage tracked. Absence of opposition is a positive siting signal.
Subscriber intel Subscribers
Researched for this county and available with a subscription:
- 🔒Project track record
- 🔒Developer intelligence
- 🔒Community & board sentiment
- 🔒Governing board
- 🔒Sentiment rollup
Energy-related meetings & dockets P1
115 meetings indexed for this jurisdiction; none flagged as discussing solar, BESS, data centers, wind, or transmission yet. Coverage expands weekly.
State PSC dockets P1
No tracked activity yet — coverage expands weekly.
Local news P3
- 2026-08-06 Jefferson Lab Data Center Newport News
- 2026-07-12 Public Records Industrial Chesapeake Storage
- 2026-06-18 Data Center Divides State Democrats
- 2026-06-12 Spanberger House Democrats Propose Data Center Study Commission As Way Around Budget Impasse
- 2026-06-04 Self Storage Real Estate Acquisitions And Sales June 2026
- 2026-03-18 Marketminute 2026 3 18 The New Industrial Powerhouse How The Southeast Is Defying National Headwinds In 2026
- 2026-02-18 42 Years Of Measuring The Sun The Earth And The Energy In Between
- 2026-02-18 42 Years Of Measuring Sun Earth And Energy In 1622339
- 2026-02-04 Nasa Libera Payload Completes Testing For Future Earth Energy Tracking Mission 999
- 2025-12-30 Business Notes Mr Rogers Windows New Building
- 2025-12-18 Talks Possible Data Center Newport 065035961
- 2025-09-13 Leif Svalgaard At Agu On The Current Solar Cycle None Of Us Alive Have Ever Seen Such A Weak Cycle
- 2025-08-12 Virginia Is Losing 156 Million For Expanding Solar Power After Epa Grant Cut
- 2025-07-25 Self Storage Development And Zoning Activity January 2025
- 2025-07-18 Letters For July 18 Time For Renewable Energy To Prove Its Worth
Filter by grade, state, moratorium status, and compliance stringency. Compare counties side by side.