Solar permitting — Halifax County, Virginia
On file: public meetings, local news, known opposition groups.
Multiple large approvals; moderately supportive sentiment; setbacks (~200 ft); few denials noted. Permitting: SUP; 50-ft setback. Track record: denial on record — MORATORIUM then RESTRICTIONS: Halifax County supervisors i…
Permitting process
Local permitting pathway
SUP, CUP, SE
Setbacks & buffers
Halifax County-specific SE/SUP conditions control — county-set setbacks vary from 50 ft (rural) to 300+ ft (residential adjacent). Verify current Halifax County zoning ordinance for adopted local setback standards. — NOTE: the distances above are a STATE-level fallback, not a figure read from this county's own ordinance. We hold siting-rule records for this county which may include a stricter local limit we have not yet extracted. Verify against the county's own ordinance before relying on these.
Spacing requirements
Scenic corridor protections
Size restrictions
None codified; managed via CUP conditions
State-level permits & approvals
Local permit: Special Use Permit (SUP) or Conditional Use Permit (CUP) in A-1 Agricultural zoning; issued by Board of Supervisors (BOS) or Planning Commission per county ordinance. Counties without zoning (Buchanan, Russell, Lee, Scott, etc.) proceed via revenue-sharing siting agreements. SCC CPCN: Va. Code §56-580 (as amended by HB 1558/SB 762, eff. Jul 2021) — SCC Certificate of Public Convenience & Necessity required for generating facilities ≥5 MW; waivable for utility-owned projects under SCC-approved IRP. DEQ Permit by Rule (PBR): Required for all solar facilities ≥1 MW per Va. Code §10.1-1197.6; includes VSMP/VPDES erosion & stormwater permits. Mar 2022 DEQ rule: solar panels counted as impervious surface same as parking lots. Revenue sharing: Va. Code §15.2-2288.7 — localities may require up to $1,400/MW-year for utility-scale solar on agricultural or forestal land; increases 10% in year 1 then every 5 years thereafter. VDACS notice: VA Dept. of Agriculture & Consumer Services must be notified for projects converting prime agricultural or forestal land. PENDING LEGISLATION (as of Mar 11, 2026): HB 711 (Herring) / SB 347 (VanValkenburg) both cleared both chambers and await Gov. Spanberger's signature (session ends Mar 14, 2026). If signed: (1) all localities must allow solar ≥1 MW via special exception — outright bans illegal; (2) statewide setback floor: 150–200 ft non-participating dwellings, 50–100 ft from state roads, 100–250 ft from streams/wetlands, 50–75 ft from property lines; (3) localities retain denial authority but must report reasons to SCC public database; (4) companion HB 891/SB 443: BESS permitted accessory use on approved solar SE sites. Spanberger is pro-solar; signature expected. Monitor: lis.virginia.gov.
Full records for this county are part of a SitePath subscription.
State policy & grid context
State RPS & clean energy policy
100% carbon-free by 2050 (Dominion), 2045 (APCo) | Virginia Clean Economy Act (2020) | Va. Code §56-585.5
State incentive programs
Virginia Clean Economy Act (VCEA, 2020): Dominion must reach 100% carbon-free by 2045; Appalachian Power by 2050; major driver of utility-scale solar procurement. Net metering: available under VCEA for systems up to 1 MW (by-right); large-scale behind-the-meter negotiated. SCC SolarShare: Dominion program offering renewable energy credits. Virtual net metering (Virginia): programs vary by utility. DEQ review: required for solar facilities ≥150 MW (permit by rule) or DEQ standalone review. Utility: Dominion Energy Virginia serves 2/3 of VA; Appalachian Power (AEP) serves western VA; Northern Virginia Electric Coop (NOVEC) serves NoVA exurbs; various rural cooperatives and municipal utilities.
Grid & interconnection
PJM / Dominion Energy Virginia (DEV) transmission zone
Full records for this county are part of a SitePath subscription.
Battery storage (BESS) P1 State-Default Permitting
Standalone BESS (not co-located with approved solar): still requires county SE/SUP and host siting agreement
Local BESS ordinances & bylaws
County-level battery-storage status, safety requirements, and projects — each linked to a primary source.
Community opposition P1
Organized opposition signals on record for this county — petitions, community groups, and oppositional coverage — each linked to its primary source.
- Solar farm moratorium amended for two hearings in Halifax County Solar
- Halifax County supervisors approve new ordinance on solar sites Solar
SitePath maintains the most complete community-opposition dataset available, refreshed continuously from primary sources.
Subscriber intel Subscribers
Researched for this county and available with a subscription:
- Project track record
- Developer intelligence
- Governing board
Energy-related meetings & dockets P1
Halo color matches the energy category tagged on each meeting.
- 2025-11-03 County BoardSolar
The solar project's acreage calculation was verified to be in accordance with the Ordinance.
- 2025-08-19 Planning CommissionSolar
The solar project's acreage calculation was verified to be in accordance with the Ordinance.
- 2025-06-17 Planning CommissionSolar
The solar project's acreage calculation was verified to be in accordance with the Ordinance.
- 2025-05-05 County BoardSolar
The solar project's acreage calculation was verified to be in accordance with the Ordinance.
- 2024-12-17 Planning CommissionSolar
Halifax County must adopt a local solar ordinance by July 2026, consistent with a state-released model ordinance.
- 2024-12-17 OtherBESS
Halifax County assesses revenue shares for solar photovoltaic projects and energy storage systems.
- 2024-11-19 Planning CommissionSolar
The solar project's acreage calculation was verified to be in accordance with the Ordinance.
- 2024-10-07 County BoardSolar
The solar project's acreage calculation was verified to be in accordance with the Ordinance.
- 2024-08-20 Planning CommissionSolar
Supervisors discussed potential changes to the solar installation ordinance.
- 2024-06-03 County BoardSolar
Halifax County Board of Supervisors will address the Conditional Use Permit application for Bluewave Solar's Opossum Branch project.
- 2024-05-06 County BoardSolar
Councilor Long discussed the inconsistency in land use regulations for solar facilities compared to other outdoor recreation activities.
- 2024-04-01 County BoardSolar
Sun Tribe Development presented the Aaron Creek Solar facility Conditional Use Permit for review.
- 2023-11-21 County BoardSolar
South Boston G Solar Development submitted a Conditional Use Permit application for a new solar facility on Grubby Road.
- 2023-04-03 County BoardSolar
The solar project's acreage calculation was verified to be in accordance with the Ordinance.
- 2023-03-06 County BoardSolar
Halifax County discussed a solar project and neighboring counties' actions on similar projects.
- 2023-02-13 County BoardSolar
The solar project's acreage calculation was verified to be in accordance with the Ordinance.
- 2022-12-20 Planning CommissionSolar
Conditional Use Permit Application for an 80 MW Solar Facility on multiple properties
- 2022-08-16 Planning CommissionSolar
The solar project's acreage calculation was verified to be in accordance with the Ordinance.
- 2022-04-19 Planning CommissionBESS
Halifax County assesses revenue shares for solar photovoltaic projects and energy storage systems.
- 2021-11-16 Planning CommissionSolar
The solar project's acreage calculation was verified to be in accordance with the Ordinance.
- 2021-06-22 County BoardSolar
The solar project's acreage calculation was verified to be in accordance with the Ordinance.
- 2021-05-18 County BoardSolar
Halifax County Planning Commission to consider conditional use permit for 3.13 MW solar facility on Philpott Road
- 2015-10-05 County BoardSolar
The solar project's acreage calculation was verified to be in accordance with the Ordinance.
- County BoardSolar
Discussion of solar project benefits and contributions
- County BoardSolar
Councilor Long discussed the inconsistency in land use regulations for solar facilities compared to other outdoor recreation activities.
- County BoardBESS
County staff and Pine Gate Renewables negotiated a solar siting agreement
- Planning CommissionSolar
The Planning Commission approved a special-use permit application for a 150 MW solar farm in agricultural district A-1.
- OtherSolar
The Planning Commission approved a special-use permit application for a 150 MW solar farm in agricultural district A-1.
- Zoning BoardSolar
Fees Zoning permits - $50 Conditional Use permits - $500 Large Scale Solar Conditional Use Permit - $1,000 Variances - $500 Plat Review - $25 ($5 for each additional parcel) Medical Variances - $25 (must be reviewed yearly) WebGIS WebGIS…
- OtherBESS
Halifax County assesses revenue shares for solar photovoltaic projects and energy storage systems.
Full records for this county are part of a SitePath subscription.
State PSC dockets P1
No tracked activity yet — coverage expands weekly.
Local news P3
Filter by grade, state, moratorium status, and compliance stringency. Compare counties side by side.