Solar permitting — Goochland County, Virginia
On file: public meetings, local news, known opposition groups.
SUP pathway; west-of-Richmond exurban context; some applications reviewed; moderate friction. Permitting: A-1; 50-ft setback. Track record: Multiple CUP approvals 2018–2024. Political environment: Republican majority; key supervisors…
Permitting process
Local permitting pathway
A-1, Agricultural | SUP
Setbacks & buffers
100 ft from public roads
Spacing requirements
None codified
Size restrictions
None codified
Penalties & bonding
No penalties or adjustments. Standard CUP/SUP process.
State-level permits & approvals
Local permit: Special Use Permit (SUP) or Conditional Use Permit (CUP) in A-1 Agricultural zoning; issued by Board of Supervisors (BOS) or Planning Commission per county ordinance. Counties without zoning (Buchanan, Russell, Lee, Scott, etc.) proceed via revenue-sharing siting agreements. SCC CPCN: Va. Code §56-580 (as amended by HB 1558/SB 762, eff. Jul 2021) — SCC Certificate of Public Convenience & Necessity required for generating facilities ≥5 MW; waivable for utility-owned projects under SCC-approved IRP. DEQ Permit by Rule (PBR): Required for all solar facilities ≥1 MW per Va. Code §10.1-1197.6; includes VSMP/VPDES erosion & stormwater permits. Mar 2022 DEQ rule: solar panels counted as impervious surface same as parking lots. Revenue sharing: Va. Code §15.2-2288.7 — localities may require up to $1,400/MW-year for utility-scale solar on agricultural or forestal land; increases 10% in year 1 then every 5 years thereafter. VDACS notice: VA Dept. of Agriculture & Consumer Services must be notified for projects converting prime agricultural or forestal land. PENDING LEGISLATION (as of Mar 11, 2026): HB 711 (Herring) / SB 347 (VanValkenburg) both cleared both chambers and await Gov. Spanberger's signature (session ends Mar 14, 2026). If signed: (1) all localities must allow solar ≥1 MW via special exception — outright bans illegal; (2) statewide setback floor: 150–200 ft non-participating dwellings, 50–100 ft from state roads, 100–250 ft from streams/wetlands, 50–75 ft from property lines; (3) localities retain denial authority but must report reasons to SCC public database; (4) companion HB 891/SB 443: BESS permitted accessory use on approved solar SE sites. Spanberger is pro-solar; signature expected. Monitor: lis.virginia.gov.
Full records for this county are part of a SitePath subscription.
State policy & grid context
State RPS & clean energy policy
100% carbon-free by 2050 (Dominion), 2045 (APCo) | Virginia Clean Economy Act (2020) | Va. Code §56-585.5
State incentive programs
Virginia Clean Economy Act (VCEA, 2020): Dominion must reach 100% carbon-free by 2045; Appalachian Power by 2050; major driver of utility-scale solar procurement. Net metering: available under VCEA for systems up to 1 MW (by-right); large-scale behind-the-meter negotiated. SCC SolarShare: Dominion program offering renewable energy credits. Virtual net metering (Virginia): programs vary by utility. DEQ review: required for solar facilities ≥150 MW (permit by rule) or DEQ standalone review. Utility: Dominion Energy Virginia serves 2/3 of VA; Appalachian Power (AEP) serves western VA; Northern Virginia Electric Coop (NOVEC) serves NoVA exurbs; various rural cooperatives and municipal utilities.
Grid & interconnection
PJM / Dominion Energy Virginia (DEV) transmission zone
Full records for this county are part of a SitePath subscription.
Battery storage (BESS) P1 State-Default Permitting
Standalone BESS (not co-located with approved solar): still requires county SE/SUP and host siting agreement
Local BESS ordinances & bylaws
County-level battery-storage status, safety requirements, and projects — each linked to a primary source.
Community opposition P1
Organized opposition signals on record for this county — petitions, community groups, and oppositional coverage — each linked to its primary source.
SitePath maintains the most complete community-opposition dataset available, refreshed continuously from primary sources.
Subscriber intel Subscribers
Researched for this county and available with a subscription:
- Project track record
- Developer intelligence
- Governing board
Energy-related meetings & dockets P1
Halo color matches the energy category tagged on each meeting.
- 2026-05-11 OtherData Center
Data center project proposed for TOD West area
- OtherSolar
Solar energy panel or structure Sec. 15-290 Place of public assembly and use open to the public A.
- OtherTransmission
15-287 P Utility – gas transmission line, compressor station, measurement station, regulator station CUP Utility distribution facility, public , and all accompanying appurtenances and structures P Utility transmission substation; transmissi
- Planning CommissionSolar
Conditional Use Permit application filed for a solar farm on Martin Road
- OtherData Center
Data center. A facility used primarily for storage, management, processing, and transmission of facts and information in digital form, which houses computer and network equipment, systems, servers, appliances and other associated components
- Zoning BoardSolar
Department of Community Development Planning and Zoning 2016 2015 % of Change 6 3 100.0% 3 3 0.0% 1 2 -50.0% 2 3 -33.3% Zoning Violations 20 13 53.8% Rezoning/Proffer Requests Certificate of Approval Ordinance Amendments 1st Quarter (Calend
- OtherData Center
Goochland County discussed a data center project
- School BoardData Center
Goochland County discussed a data center project
- OtherTransmission
15-287 P Utility – gas transmission line, compressor station, measurement station, regulator station CUP Utility distribution facility, public , and all accompanying appurtenances and structures P Utility transmission substation; transmissi
- Planning CommissionData Center
Added parking requirements for industrial uses: airport, asphalt or concrete mixing plant, automobile storage lot, cabinetmaking furniture or upholstery shop, commercial kitchen catering, composting facility, contractor equipment storage…
Full records for this county are part of a SitePath subscription.
State PSC dockets P1
No tracked activity yet — coverage expands weekly.
Local news P3
- 2026-09-30 Dominion Unveils Route Changes Valley Link Transmission Line 2
- 2026-09-30 Dominion Unveils Route Changes Valley Link Transmission Line
- 2026-09-23 We Need Our Henrico Leadership To Step Up Nearby Goochland Data Center Park Prompts Concerns For Henrico Residents
- 2026-07-13 Data Center Opponents Demand More Transparency During Rally Capitol Square
- 2026-06-27 Goochland Data Center Campus
- 2026-06-24 Vcu Researcher Examines Air Quality Concerns Tied Virginia Data Centers
- 2026-05-28 Residents Wrangle Over Transmission Line Proposal Rural Virginia
- 2026-04-10 Goochland Data Center Lawsuit April 9 2026
- 2026-03-25 Orange Community Members Pack Board Meeting Oppose Proposed 1 Billion Transmission Line
- 2026-03-12 Massive Power Transmission Line Planned For Campbell To Culpeper
- 2026-03-05 Valley Link Seeks Community Input On Proposed Transmission Line Route Through Central Virginia
- 2026-02-19 Following Goochlands Lead New Kent County Mulling Data Center Centric Tech Overlay District
- 2025-11-21 Proposed Data Center Incites Opposition From Hundreds Of Henrico Hanover Residents
- 2025-11-04 Election House District 57 Henricos Most Competitive Race Centers Around Data Centers Affordability And Trump
- 2025-09-11 Nuclear Data Centers Right Outside Virginias Capital City
Filter by grade, state, moratorium status, and compliance stringency. Compare counties side by side.