Solar permitting — Franklin County, Virginia

FIPS 51067

On file: public meetings, local news, known opposition groups.

B
Franklin County, VA
Risk score 37/100 · Full scorecard →
Compliance: ModerateNo local solar ordinanceTrajectory: StableSaturation: High

Standard SUP pathway; southern VA Blue Ridge foothills; limited track record; manageable friction. Permitting: A-1; 50-ft setback. Track record: denial on record — RESTRICTIVE: Franklin County cap of 1,500 acres countywide for all…

Permitting process

Local permitting pathway

A-1, Agricultural | SUP

Setbacks & buffers

300 ft from occupied dwellings

Spacing requirements

None codified

Size restrictions

None codified; managed via CUP/SUP conditions

Penalties & bonding

No penalties or adjustments. Standard CUP/SUP process.

State-level permits & approvals

Local permit: Special Use Permit (SUP) or Conditional Use Permit (CUP) in A-1 Agricultural zoning; issued by Board of Supervisors (BOS) or Planning Commission per county ordinance. Counties without zoning (Buchanan, Russell, Lee, Scott, etc.) proceed via revenue-sharing siting agreements. SCC CPCN: Va. Code §56-580 (as amended by HB 1558/SB 762, eff. Jul 2021) — SCC Certificate of Public Convenience & Necessity required for generating facilities ≥5 MW; waivable for utility-owned projects under SCC-approved IRP. DEQ Permit by Rule (PBR): Required for all solar facilities ≥1 MW per Va. Code §10.1-1197.6; includes VSMP/VPDES erosion & stormwater permits. Mar 2022 DEQ rule: solar panels counted as impervious surface same as parking lots. Revenue sharing: Va. Code §15.2-2288.7 — localities may require up to $1,400/MW-year for utility-scale solar on agricultural or forestal land; increases 10% in year 1 then every 5 years thereafter. VDACS notice: VA Dept. of Agriculture & Consumer Services must be notified for projects converting prime agricultural or forestal land. PENDING LEGISLATION (as of Mar 11, 2026): HB 711 (Herring) / SB 347 (VanValkenburg) both cleared both chambers and await Gov. Spanberger's signature (session ends Mar 14, 2026). If signed: (1) all localities must allow solar ≥1 MW via special exception — outright bans illegal; (2) statewide setback floor: 150–200 ft non-participating dwellings, 50–100 ft from state roads, 100–250 ft from streams/wetlands, 50–75 ft from property lines; (3) localities retain denial authority but must report reasons to SCC public database; (4) companion HB 891/SB 443: BESS permitted accessory use on approved solar SE sites. Spanberger is pro-solar; signature expected. Monitor: lis.virginia.gov.

Full permitting requirements

Full records for this county are part of a SitePath subscription.

State policy & grid context

State RPS & clean energy policy

100% carbon-free by 2050 (Dominion), 2045 (APCo) | Virginia Clean Economy Act (2020) | Va. Code §56-585.5

State incentive programs

Virginia Clean Economy Act (VCEA, 2020): Dominion must reach 100% carbon-free by 2045; Appalachian Power by 2050; major driver of utility-scale solar procurement. Net metering: available under VCEA for systems up to 1 MW (by-right); large-scale behind-the-meter negotiated. SCC SolarShare: Dominion program offering renewable energy credits. Virtual net metering (Virginia): programs vary by utility. DEQ review: required for solar facilities ≥150 MW (permit by rule) or DEQ standalone review. Utility: Dominion Energy Virginia serves 2/3 of VA; Appalachian Power (AEP) serves western VA; Northern Virginia Electric Coop (NOVEC) serves NoVA exurbs; various rural cooperatives and municipal utilities.

Grid & interconnection

PJM / Dominion Energy Virginia (DEV) transmission zone

Full state policy & grid detail

Full records for this county are part of a SitePath subscription.

Battery storage (BESS) P1 State-Default Permitting

Standalone BESS (not co-located with approved solar): still requires county SE/SUP and host siting agreement

Local BESS ordinances & bylaws

County-level battery-storage status, safety requirements, and projects — each linked to a primary source.

Community opposition P1

Organized opposition signals on record for this county — petitions, community groups, and oppositional coverage — each linked to its primary source.

SitePath maintains the most complete community-opposition dataset available, refreshed continuously from primary sources.

Subscriber intel Subscribers

Researched for this county and available with a subscription:

Sign in to view

Energy-related meetings & dockets P1

solar · data center · bess

Halo color matches the energy category tagged on each meeting.

  • 2022-11-10 Other
    BESS

    Applicants for solar or energy storage projects must provide written notice and negotiate a siting agreement with the host locality.

  • 2022-01-11 Other
    Solar

    The county introduced amendments to its solar ordinance to allow for utility-scale and small-scale solar facilities.

  • 2021-11-09 Other
    Data Center

    Discussion of data center project considering environmental and social impact.

  • 2021-01-19 County Board
    Solar

    The county introduced amendments to its solar ordinance to allow for utility-scale and small-scale solar facilities.

  • Zoning Board
    Solar

    Solar Generation Facility, Large, (see section 25-147). Storage—Boat, recreational vehicle, and recreational trailer as a use allowed by special use permit.

  • Other
    Solar

    SPEC-04-25-18269 Applicants and Owners: GBSR Property Ventures, LLC Parcel ID#: 0300001405 Address: 13595 Booker T Washington Hwy, Moneta, VA 24121 Election District: Gills Creek Special Use Permit: To allow for a daycare facility in the…

  • Zoning Board
    Solar

    Solar Generation Facility, Large, (see section 25-147). Storage—Boat, recreational vehicle, and recreational trailer as a use allowed by special use permit.

  • Other
    Solar

    Planning Commission denied a solar generator facility's conformance with the Franklin County Comprehensive Plan.

  • Other
    Solar

    Encourage utility scale solar facilities to locate on less suitable sites.

  • Other
    Solar

    Planning Commission tabled a special-use permit application for a solar generator facility.

More energy-related meetings

Full records for this county are part of a SitePath subscription.

State PSC dockets P1

No tracked activity yet — coverage expands weekly.

Local news P3

Explore every US county on the interactive map

Filter by grade, state, moratorium status, and compliance stringency. Compare counties side by side.