Solar permitting — Dinwiddie County, Virginia

FIPS 51053

On file: public meetings, local news, known opposition groups.

B
Dinwiddie County, VA
Risk score 36/100 · Full scorecard →
Compliance: LowTrajectory: WorseningSaturation: High

Most Supportive. Permitting: SED | CUP; 50-ft setback; hard No numeric cap; managed via rezoning. Track record: Multiple SED (Solar Energy Development district) facilities. Political environment: Republican majority; key super…

Key driver: Most Supportive. Utilizes a dedicated Solar Energy District (SED); 20+ projects; experienced; no numeric cap.

Permitting process

Local permitting pathway

SED | CUP, SE, rezoning

Setbacks & buffers

Dinwiddie County-specific SE/SUP conditions control — county-set setbacks vary from 50 ft (rural) to 300+ ft (residential adjacent). Verify current Dinwiddie County zoning ordinance for adopted local setback standards. — NOTE: the distances above are a STATE-level fallback, not a figure read from this county's own ordinance. We hold siting-rule records for this county which may include a stricter local limit we have not yet extracted. Verify against the county's own ordinance before relying on these.

Spacing requirements

Rezoning limits locations; avoid aviation/industrial conflicts

Size restrictions

None codified; managed via SED rezoning

Penalties & bonding

No penalties or adjustments. Standard CUP/SUP process.

State-level permits & approvals

Local permit: Special Use Permit (SUP) or Conditional Use Permit (CUP) in A-1 Agricultural zoning; issued by Board of Supervisors (BOS) or Planning Commission per county ordinance. Counties without zoning (Buchanan, Russell, Lee, Scott, etc.) proceed via revenue-sharing siting agreements. SCC CPCN: Va. Code §56-580 (as amended by HB 1558/SB 762, eff. Jul 2021) — SCC Certificate of Public Convenience & Necessity required for generating facilities ≥5 MW; waivable for utility-owned projects under SCC-approved IRP. DEQ Permit by Rule (PBR): Required for all solar facilities ≥1 MW per Va. Code §10.1-1197.6; includes VSMP/VPDES erosion & stormwater permits. Mar 2022 DEQ rule: solar panels counted as impervious surface same as parking lots. Revenue sharing: Va. Code §15.2-2288.7 — localities may require up to $1,400/MW-year for utility-scale solar on agricultural or forestal land; increases 10% in year 1 then every 5 years thereafter. VDACS notice: VA Dept. of Agriculture & Consumer Services must be notified for projects converting prime agricultural or forestal land. PENDING LEGISLATION (as of Mar 11, 2026): HB 711 (Herring) / SB 347 (VanValkenburg) both cleared both chambers and await Gov. Spanberger's signature (session ends Mar 14, 2026). If signed: (1) all localities must allow solar ≥1 MW via special exception — outright bans illegal; (2) statewide setback floor: 150–200 ft non-participating dwellings, 50–100 ft from state roads, 100–250 ft from streams/wetlands, 50–75 ft from property lines; (3) localities retain denial authority but must report reasons to SCC public database; (4) companion HB 891/SB 443: BESS permitted accessory use on approved solar SE sites. Spanberger is pro-solar; signature expected. Monitor: lis.virginia.gov.

Full permitting requirements

Full records for this county are part of a SitePath subscription.

State policy & grid context

State RPS & clean energy policy

100% carbon-free by 2050 (Dominion), 2045 (APCo) | Virginia Clean Economy Act (2020) | Va. Code §56-585.5

State incentive programs

Virginia Clean Economy Act (VCEA, 2020): Dominion must reach 100% carbon-free by 2045; Appalachian Power by 2050; major driver of utility-scale solar procurement. Net metering: available under VCEA for systems up to 1 MW (by-right); large-scale behind-the-meter negotiated. SCC SolarShare: Dominion program offering renewable energy credits. Virtual net metering (Virginia): programs vary by utility. DEQ review: required for solar facilities ≥150 MW (permit by rule) or DEQ standalone review. Utility: Dominion Energy Virginia serves 2/3 of VA; Appalachian Power (AEP) serves western VA; Northern Virginia Electric Coop (NOVEC) serves NoVA exurbs; various rural cooperatives and municipal utilities.

Grid & interconnection

PJM / Dominion Energy Virginia (DEV) transmission zone

Full state policy & grid detail

Full records for this county are part of a SitePath subscription.

Battery storage (BESS) P1 State-Default Permitting

Standalone BESS (not co-located with approved solar): still requires county SE/SUP and host siting agreement

Local BESS ordinances & bylaws

County-level battery-storage status, safety requirements, and projects — each linked to a primary source.

Community opposition P1

Organized opposition signals on record for this county — petitions, community groups, and oppositional coverage — each linked to its primary source.

SitePath maintains the most complete community-opposition dataset available, refreshed continuously from primary sources.

Subscriber intel Subscribers

Researched for this county and available with a subscription:

Sign in to view

Energy-related meetings & dockets P1

solar · bess · transmission · data center

Halo color matches the energy category tagged on each meeting.

  • 2020-11-12 Other
    Solar

    RE: PUBLIC HEARING To: Dinwiddie County Planning Commission From: Mark Bassett, Planning Director Date: October 30, 2020 Subject: Zoning Ordinance Amendment Establishing the Utility Scale Solar Energy District (SED) Proposed Zoning Ordinanc

  • Other
    BESS

    The Solar Facilities shall not include battery storage or any other means of large-scale electrical storage.

  • Other
    Transmission

    Center Star 115kV Transmission Line Southside Electric Cooperative  Southside Electric Cooperative is a not-for-profit member-owned electric distribution cooperative.

  • Zoning Board
    BESS

    Select project experience appears below: Project Name Role Technology Location Size (MW) BluePath Solar Portfolio (11 projects) Financing Solar CA/IL/HI/OH 10 NCS Solar 2020 Portfolio (32 projects) Financing Solar DC 12 NCS Solar 2021 Portf

  • Other
    Solar

    UTILITY SCALE SOLAR ENERGY DISTRICT (SE) BE IT RECOMMENDED by the Planning Commission of Dinwiddie County: (1) That Chapter 22 of the Code of the County of Dinwiddie , 1985, as amended, is amended by inserting the following language : DIVIS

  • County Board
    Data Center

    The county is proposing a power project to help keep local pricing down due to data center growth.

  • Zoning Board
    BESS

    Select project experience appears below: Project Name Role Technology Location Size (MW) BluePath Solar Portfolio (11 projects) Financing Solar CA/IL/HI/OH 10 NCS Solar 2020 Portfolio (32 projects) Financing Solar DC 12 NCS Solar 2021 Portf

  • Planning Commission
    Solar

    In order to construct the Project on the Property, the Applicant is requesting rezoning of the 308-acre portion of the Property from General Agricultural (A-2) to Utility Scale Solar Energy District (SED) together with a conditional use per

  • Zoning Board
    Solar

    REVISED REZONI NG and CONDITIONAL USE PERMIT APPLIC ATION Applicant: Lily Pond Solar, LLC Project: Lily Pond Solar Submitted: October 11th, 2022 Page 2 of 20 10/ 07/2 2 10/11/2022 M ark Bassett Director of Planning, Dinwiddie County 14010…

  • County Board
    BESS

    The Solar Facilities shall not include battery storage or any other means of large-scale electrical storage.

  • Other
    BESS

    Glidepath Power Solutions submitted a special exception permit application for a 10 MW solar and 4 MW battery energy storage system project.

  • Planning Commission
    Solar

    Flowers Solar, LLC has the right to apply for permits for a solar project through site lease agreements.

  • Other
    BESS

    BOOK 6 PAGE 2 September 8, 2021 IN RE: PUBLIC HEARING Planning Commission Staff Report File #: P-21-5 Applicant: Sam Clay, and his agent, Mike Wallgren, an authorized representative for Glidepath Power Solutions Rezoning Request: A-2, Agric

  • Other
    Solar

    County clarifies definition of pollution control equipment to include solar energy equipment and exempt certified equipment.

More energy-related meetings

Full records for this county are part of a SitePath subscription.

State PSC dockets P1

No tracked activity yet — coverage expands weekly.

Local news P3

Explore every US county on the interactive map

Filter by grade, state, moratorium status, and compliance stringency. Compare counties side by side.

Open the county map → SitePath home All Virginia counties
Data sources: public agendas/minutes from local government sites; PSC dockets from state regulators; news from GDELT and curated RSS. Last refreshed 2026-10-07. See the county risk scorecard or the full Virginia permitting index.