Solar permitting — Charlotte County, Virginia
On file: public meetings, local news, known opposition groups.
Positive Outlook. Permitting: CUP; 50-ft setback. Track record: denial on record — CPV County Line Solar (Competitive Power Ventures). Political environment: Republican majority; key supervisors/commissioners: Sherry Tharpe; commu…
Key driver: Positive Outlook. 7+ large approvals; issues typically resolved via conditions; revenue support; density goal is non-binding.
Permitting process
Local permitting pathway
CUP
Setbacks & buffers
Property lines, occupied dwellings and public roads: less otherwise prescribed by the Board of Supervisors as a condition of approval for a Conditional Use Permit, utility-Scale Solar Energy Systems shall conform to the following setbacks: a minimum setback of 125 feet from the center line of any state maintained road abutting the property; a minimum
Spacing requirements
None codified
Size restrictions
None codified; managed via CUP conditions
State-level permits & approvals
Local permit: Special Use Permit (SUP) or Conditional Use Permit (CUP) in A-1 Agricultural zoning; issued by Board of Supervisors (BOS) or Planning Commission per county ordinance. Counties without zoning (Buchanan, Russell, Lee, Scott, etc.) proceed via revenue-sharing siting agreements. SCC CPCN: Va. Code §56-580 (as amended by HB 1558/SB 762, eff. Jul 2021) — SCC Certificate of Public Convenience & Necessity required for generating facilities ≥5 MW; waivable for utility-owned projects under SCC-approved IRP. DEQ Permit by Rule (PBR): Required for all solar facilities ≥1 MW per Va. Code §10.1-1197.6; includes VSMP/VPDES erosion & stormwater permits. Mar 2022 DEQ rule: solar panels counted as impervious surface same as parking lots. Revenue sharing: Va. Code §15.2-2288.7 — localities may require up to $1,400/MW-year for utility-scale solar on agricultural or forestal land; increases 10% in year 1 then every 5 years thereafter. VDACS notice: VA Dept. of Agriculture & Consumer Services must be notified for projects converting prime agricultural or forestal land. PENDING LEGISLATION (as of Mar 11, 2026): HB 711 (Herring) / SB 347 (VanValkenburg) both cleared both chambers and await Gov. Spanberger's signature (session ends Mar 14, 2026). If signed: (1) all localities must allow solar ≥1 MW via special exception — outright bans illegal; (2) statewide setback floor: 150–200 ft non-participating dwellings, 50–100 ft from state roads, 100–250 ft from streams/wetlands, 50–75 ft from property lines; (3) localities retain denial authority but must report reasons to SCC public database; (4) companion HB 891/SB 443: BESS permitted accessory use on approved solar SE sites. Spanberger is pro-solar; signature expected. Monitor: lis.virginia.gov.
Full records for this county are part of a SitePath subscription.
State policy & grid context
State RPS & clean energy policy
100% carbon-free by 2050 (Dominion), 2045 (APCo) | Virginia Clean Economy Act (2020) | Va. Code §56-585.5
State incentive programs
Virginia Clean Economy Act (VCEA, 2020): Dominion must reach 100% carbon-free by 2045; Appalachian Power by 2050; major driver of utility-scale solar procurement. Net metering: available under VCEA for systems up to 1 MW (by-right); large-scale behind-the-meter negotiated. SCC SolarShare: Dominion program offering renewable energy credits. Virtual net metering (Virginia): programs vary by utility. DEQ review: required for solar facilities ≥150 MW (permit by rule) or DEQ standalone review. Utility: Dominion Energy Virginia serves 2/3 of VA; Appalachian Power (AEP) serves western VA; Northern Virginia Electric Coop (NOVEC) serves NoVA exurbs; various rural cooperatives and municipal utilities.
Grid & interconnection
PJM / Dominion Energy Virginia (DEV) transmission zone
Full records for this county are part of a SitePath subscription.
Battery storage (BESS) P1 State-Default Permitting
BESS ORDINANCE IN DEVELOPMENT — Charlotte County, VA: County was identified by GreeneHurlocker Midyear 2024 as beginning the process of adding battery storage provisions to its ordinance
Local BESS ordinances & bylaws
County-level battery-storage status, safety requirements, and projects — each linked to a primary source.
Community opposition P1
Organized opposition signals on record for this county — petitions, community groups, and oppositional coverage — each linked to its primary source.
- Charlotte sets hearing for 150-day pause on data center developments Data center
- East Charlotte data center delayed amid calls for total ban Data center
- Lawmakers approve a weakened bill regulating wind turbines Wind
SitePath maintains the most complete community-opposition dataset available, refreshed continuously from primary sources.
Subscriber intel Subscribers
Researched for this county and available with a subscription:
- Project track record
- Developer intelligence
- Governing board
Energy-related meetings & dockets P1
Halo color matches the energy category tagged on each meeting.
- OtherSolar
Solar Development APPLICANT INFORMATION AND RESOURCES Conditional Use Permit Application Zoning Ordinance Electrical Fee Schedule for Solar Erosion & Sediment Control Fee Schedule for Solar Charlotte County Taxation Code (See Revenue Share
- Zoning BoardBESS
Regular Meeting: NOTE CHANGE IN DATE - Public Hearings: (1) Battery Energy Storage Zoning Amendment & (2) Weston Cell Tower Conditional Use Permit Date: Thursday June 26, 2025 (06/26/25) Documents & Links: Thursday June 26, 2025 06/26/25 20
- OtherSolar
County Line Solar Project Open House Event There will be an Informational Open House to learn about the County Line Solar Project on August 23, 2023 from 5:30-8:00 PM at The Shepherd's Tavern.
- Zoning BoardBESS
Charlotte County discussed a proposed zoning amendment for battery energy storage systems.
Full records for this county are part of a SitePath subscription.
State PSC dockets P1
No tracked activity yet — coverage expands weekly.
Local news P3
- 2026-04-03 Construction Begins On Randolph Solar Project In Charlotte County After Years Of Delays April 2026
- 2026-04-02 Construction begins on Randolph Solar Project in Charlotte County after years of delays
- 2026-03-06 Valley Link seeks community input on proposed transmission line route through central Virginia
- 2025-11-06 Dominion Energy Solar Projects
- 2025-11-06 Dominion Energy Proposes Massive Solar 151700584
- 2023-01-13 Solar farm proposed for Gainesville area
Filter by grade, state, moratorium status, and compliance stringency. Compare counties side by side.