Solar permitting — Campbell County, Virginia

FIPS 51031

On file: public meetings, local news.

C
Campbell County, VA
Risk score 44/100 · Full scorecard →
Compliance: ModerateTrajectory: StableSaturation: Very High

SUP pathway exists; conservative Lynchburg-area politics; limited track record; moderate friction. Permitting: A-1; 50-ft setback. Track record: denial on record — Piney River Solar (Energix Renewables US). Political envi…

Permitting process

Local permitting pathway

A-1, Agricultural | SUP

Setbacks & buffers

Campbell County-specific SE/SUP conditions control — county-set setbacks vary from 50 ft (rural) to 300+ ft (residential adjacent). Verify current Campbell County zoning ordinance for adopted local setback standards. — NOTE: the distances above are a STATE-level fallback, not a figure read from this county's own ordinance. We hold siting-rule records for this county which may include a stricter local limit we have not yet extracted. Verify against the county's own ordinance before relying on these.

Spacing requirements

None codified

Size restrictions

None codified

Penalties & bonding

Total penalty: +10 (Denial +10)

State-level permits & approvals

Local permit: Special Use Permit (SUP) or Conditional Use Permit (CUP) in A-1 Agricultural zoning; issued by Board of Supervisors (BOS) or Planning Commission per county ordinance. Counties without zoning (Buchanan, Russell, Lee, Scott, etc.) proceed via revenue-sharing siting agreements. SCC CPCN: Va. Code §56-580 (as amended by HB 1558/SB 762, eff. Jul 2021) — SCC Certificate of Public Convenience & Necessity required for generating facilities ≥5 MW; waivable for utility-owned projects under SCC-approved IRP. DEQ Permit by Rule (PBR): Required for all solar facilities ≥1 MW per Va. Code §10.1-1197.6; includes VSMP/VPDES erosion & stormwater permits. Mar 2022 DEQ rule: solar panels counted as impervious surface same as parking lots. Revenue sharing: Va. Code §15.2-2288.7 — localities may require up to $1,400/MW-year for utility-scale solar on agricultural or forestal land; increases 10% in year 1 then every 5 years thereafter. VDACS notice: VA Dept. of Agriculture & Consumer Services must be notified for projects converting prime agricultural or forestal land. PENDING LEGISLATION (as of Mar 11, 2026): HB 711 (Herring) / SB 347 (VanValkenburg) both cleared both chambers and await Gov. Spanberger's signature (session ends Mar 14, 2026). If signed: (1) all localities must allow solar ≥1 MW via special exception — outright bans illegal; (2) statewide setback floor: 150–200 ft non-participating dwellings, 50–100 ft from state roads, 100–250 ft from streams/wetlands, 50–75 ft from property lines; (3) localities retain denial authority but must report reasons to SCC public database; (4) companion HB 891/SB 443: BESS permitted accessory use on approved solar SE sites. Spanberger is pro-solar; signature expected. Monitor: lis.virginia.gov.

Full permitting requirements

Full records for this county are part of a SitePath subscription.

State policy & grid context

State RPS & clean energy policy

100% carbon-free by 2050 (Dominion), 2045 (APCo) | Virginia Clean Economy Act (2020) | Va. Code §56-585.5

State incentive programs

Virginia Clean Economy Act (VCEA, 2020): Dominion must reach 100% carbon-free by 2045; Appalachian Power by 2050; major driver of utility-scale solar procurement. Net metering: available under VCEA for systems up to 1 MW (by-right); large-scale behind-the-meter negotiated. SCC SolarShare: Dominion program offering renewable energy credits. Virtual net metering (Virginia): programs vary by utility. DEQ review: required for solar facilities ≥150 MW (permit by rule) or DEQ standalone review. Utility: Dominion Energy Virginia serves 2/3 of VA; Appalachian Power (AEP) serves western VA; Northern Virginia Electric Coop (NOVEC) serves NoVA exurbs; various rural cooperatives and municipal utilities.

Grid & interconnection

PJM / Dominion Energy Virginia (DEV) transmission zone

Full state policy & grid detail

Full records for this county are part of a SitePath subscription.

Battery storage (BESS) P1 State-Default Permitting

Standalone BESS (not co-located with approved solar): still requires county SE/SUP and host siting agreement

Local BESS ordinances & bylaws

County-level battery-storage status, safety requirements, and projects — each linked to a primary source.

Community opposition P1

No organized opposition on record for this county yet — no petition, group, or oppositional coverage tracked. Read that as nothing found, not as nothing there: absence of records is not evidence of local support.

Subscriber intel Subscribers

Researched for this county and available with a subscription:

Sign in to view

Energy-related meetings & dockets P1

data center · solar

Halo color matches the energy category tagged on each meeting.

  • 2023-10-03 County Board
    Data Center

    The Board of Supervisors denied a rezoning request to allow a data center on a property in Campbell County.

  • 2022-03-01 Other
    Solar

    Arthur, for a special use permit to construct a community solar garden on property zoned Agricultural.

  • 2021-01-25 Planning Commission
    Solar

    Commissioners introduced a resolution to review and modify local ordinances for solar farm usage.

  • 2018-01-22 Planning Commission
    Solar

    Commissioners introduced a resolution to review and modify local ordinances for solar farm usage.

  • Zoning Board
    Data Center

    The county discussed a data center project, defining its scope and characteristics.

  • Planning Commission
    Solar

    Mitchell, Zoning and Subdivision Administrator ARM CC: Paul Harvey, Community Development Director Subject: Special Use Permit Request #PL-18-103 (Depot Road) Date: August 17, 2018 ___________________________________________________________

  • Other
    Solar

    Dragonfly Solar LLC requests a special use permit for an 80 MWac solar facility in Campbell County, Virginia.

  • County Board
    Data Center

    The public hearing for a data center project was closed after citizens spoke in favor of requiring a special use permit.

  • County Board
    Data Center

    The Board discussed potential tax revenue and regulatory requirements for a data center project.

  • County Board
    Solar

    Residents expressed concerns about a proposed power line route for a solar project.

  • Other
    Data Center

    Campbell County clarified that a data center sign on Mount Athos Road is unrelated to the Cabin Field Road project and has no further information on development interest.

More energy-related meetings

Full records for this county are part of a SitePath subscription.

State PSC dockets P1

No tracked activity yet — coverage expands weekly.

Local news P3

Explore every US county on the interactive map

Filter by grade, state, moratorium status, and compliance stringency. Compare counties side by side.

Open the county map → SitePath home All Virginia counties
Data sources: public agendas/minutes from local government sites; PSC dockets from state regulators; news from GDELT and curated RSS. Last refreshed 2026-10-07. See the county risk scorecard or the full Virginia permitting index.