Solar permitting — Campbell County, Virginia
On file: public meetings, local news.
SUP pathway exists; conservative Lynchburg-area politics; limited track record; moderate friction. Permitting: A-1; 50-ft setback. Track record: denial on record — Piney River Solar (Energix Renewables US). Political envi…
Permitting process
Local permitting pathway
A-1, Agricultural | SUP
Setbacks & buffers
Campbell County-specific SE/SUP conditions control — county-set setbacks vary from 50 ft (rural) to 300+ ft (residential adjacent). Verify current Campbell County zoning ordinance for adopted local setback standards. — NOTE: the distances above are a STATE-level fallback, not a figure read from this county's own ordinance. We hold siting-rule records for this county which may include a stricter local limit we have not yet extracted. Verify against the county's own ordinance before relying on these.
Spacing requirements
None codified
Size restrictions
None codified
Penalties & bonding
Total penalty: +10 (Denial +10)
State-level permits & approvals
Local permit: Special Use Permit (SUP) or Conditional Use Permit (CUP) in A-1 Agricultural zoning; issued by Board of Supervisors (BOS) or Planning Commission per county ordinance. Counties without zoning (Buchanan, Russell, Lee, Scott, etc.) proceed via revenue-sharing siting agreements. SCC CPCN: Va. Code §56-580 (as amended by HB 1558/SB 762, eff. Jul 2021) — SCC Certificate of Public Convenience & Necessity required for generating facilities ≥5 MW; waivable for utility-owned projects under SCC-approved IRP. DEQ Permit by Rule (PBR): Required for all solar facilities ≥1 MW per Va. Code §10.1-1197.6; includes VSMP/VPDES erosion & stormwater permits. Mar 2022 DEQ rule: solar panels counted as impervious surface same as parking lots. Revenue sharing: Va. Code §15.2-2288.7 — localities may require up to $1,400/MW-year for utility-scale solar on agricultural or forestal land; increases 10% in year 1 then every 5 years thereafter. VDACS notice: VA Dept. of Agriculture & Consumer Services must be notified for projects converting prime agricultural or forestal land. PENDING LEGISLATION (as of Mar 11, 2026): HB 711 (Herring) / SB 347 (VanValkenburg) both cleared both chambers and await Gov. Spanberger's signature (session ends Mar 14, 2026). If signed: (1) all localities must allow solar ≥1 MW via special exception — outright bans illegal; (2) statewide setback floor: 150–200 ft non-participating dwellings, 50–100 ft from state roads, 100–250 ft from streams/wetlands, 50–75 ft from property lines; (3) localities retain denial authority but must report reasons to SCC public database; (4) companion HB 891/SB 443: BESS permitted accessory use on approved solar SE sites. Spanberger is pro-solar; signature expected. Monitor: lis.virginia.gov.
Full records for this county are part of a SitePath subscription.
State policy & grid context
State RPS & clean energy policy
100% carbon-free by 2050 (Dominion), 2045 (APCo) | Virginia Clean Economy Act (2020) | Va. Code §56-585.5
State incentive programs
Virginia Clean Economy Act (VCEA, 2020): Dominion must reach 100% carbon-free by 2045; Appalachian Power by 2050; major driver of utility-scale solar procurement. Net metering: available under VCEA for systems up to 1 MW (by-right); large-scale behind-the-meter negotiated. SCC SolarShare: Dominion program offering renewable energy credits. Virtual net metering (Virginia): programs vary by utility. DEQ review: required for solar facilities ≥150 MW (permit by rule) or DEQ standalone review. Utility: Dominion Energy Virginia serves 2/3 of VA; Appalachian Power (AEP) serves western VA; Northern Virginia Electric Coop (NOVEC) serves NoVA exurbs; various rural cooperatives and municipal utilities.
Grid & interconnection
PJM / Dominion Energy Virginia (DEV) transmission zone
Full records for this county are part of a SitePath subscription.
Battery storage (BESS) P1 State-Default Permitting
Standalone BESS (not co-located with approved solar): still requires county SE/SUP and host siting agreement
Local BESS ordinances & bylaws
County-level battery-storage status, safety requirements, and projects — each linked to a primary source.
Community opposition P1
No organized opposition on record for this county yet — no petition, group, or oppositional coverage tracked. Read that as nothing found, not as nothing there: absence of records is not evidence of local support.
Subscriber intel Subscribers
Researched for this county and available with a subscription:
- Project track record
- Developer intelligence
- Governing board
Energy-related meetings & dockets P1
Halo color matches the energy category tagged on each meeting.
- 2026-01-06 OtherData Center
PUBLIC HEARING - CODE UPDATE: DATA CENTER AMENDMENTS At the December meeting of the Board of Supervisors, the Board adopted an emergency ordinance amending Chapter 22-15(A)(17) of the Campbell County Code of 1988 pursuant to Va.
- 2025-10-07 County BoardData Center
The Board of Supervisors denied a rezoning request to allow a data center on a property in Campbell County.
- 2025-09-02 County BoardData Center
The Board discussed potential tax revenue and regulatory requirements for a data center project.
- 2023-10-03 County BoardData Center
The Board of Supervisors denied a rezoning request to allow a data center on a property in Campbell County.
- 2022-03-01 OtherSolar
Arthur, for a special use permit to construct a community solar garden on property zoned Agricultural.
- 2021-01-25 Planning CommissionSolar
Commissioners introduced a resolution to review and modify local ordinances for solar farm usage.
- 2018-01-22 Planning CommissionSolar
Commissioners introduced a resolution to review and modify local ordinances for solar farm usage.
- Zoning BoardData Center
The county discussed a data center project, defining its scope and characteristics.
- Planning CommissionSolar
Mitchell, Zoning and Subdivision Administrator ARM CC: Paul Harvey, Community Development Director Subject: Special Use Permit Request #PL-18-103 (Depot Road) Date: August 17, 2018 ___________________________________________________________
- OtherSolar
Dragonfly Solar LLC requests a special use permit for an 80 MWac solar facility in Campbell County, Virginia.
- County BoardData Center
The public hearing for a data center project was closed after citizens spoke in favor of requiring a special use permit.
- County BoardData Center
The Board discussed potential tax revenue and regulatory requirements for a data center project.
- County BoardSolar
Residents expressed concerns about a proposed power line route for a solar project.
- OtherData Center
Campbell County clarified that a data center sign on Mount Athos Road is unrelated to the Cabin Field Road project and has no further information on development interest.
Full records for this county are part of a SitePath subscription.
State PSC dockets P1
No tracked activity yet — coverage expands weekly.
Local news P3
- 2026-09-30 Campbell County Neighbors Continue Push Against Proposed Transmission Line September 2026
- 2026-09-02 Campbell County Board Signals Opposition 1B Transmission Line Project
- 2026-07-08 Campbell County Supervisors Discuss Zoning Change That Would Allow Small Nuclear Reactors
- 2026-06-11 From Tech Glitches To Unanswered Emails Residents Cite Communication Gaps In Valley Link Transmission Line Project
- 2026-05-28 Residents Wrangle Over Transmission Line Proposal Rural Virginia
- 2026-04-22 Data Centers Energy Demand Drives Grid Construction In Central Virginia
- 2026-04-09 How Apco And Experts React As Virginias Power Grid Faces Pressure From New Data Centers
- 2026-03-25 Orange Community Members Pack Board Meeting Oppose Proposed 1 Billion Transmission Line
- 2026-03-12 Massive Power Transmission Line Planned For Campbell To Culpeper
- 2026-03-05 Valley Link Seeks Community Input On Proposed Transmission Line Route Through Central Virginia
- 2026-02-04 Campbell County Leaders Approve Solar Farm Site Off Brookneal Highway Dominion Energy George Jamerson Virginia Electric And Power Company…
- 2026-01-03 Virginia Tech Seeks Create Research Center Address Data Center Issues
- 2025-12-03 Campbell County Board Of Supervisors Votes On Emergency Ordinance To Require Data Centers To Apply For Special Use Permit Zoning…
- 2025-12-02 Campbell County Board Expected To Debate New Rules For Data Centers In Tuesday Meeting December 2025
- 2025-11-25 Regulators Ok Appalachian Power Bill Increase To Cover Renewable Energy Costs