68 indexed meetings (34 energy-related), 51 news items, 6 known opposition groups.

D
Botetourt County, VA
Risk score 61/100 · Full scorecard →
Compliance: ModerateTrajectory: StableSaturation: Moderate

Standard SUP pathway; Western VA rural county adjacent to Roanoke metro; moderate siting friction. Permitting: A-1; 50-ft setback. Track record: Multiple CUP approvals 2019–2024. Political environment: Republican majority; key superv…

Permitting process

Local permitting pathway

A-1, Agricultural | SUP

Setbacks & buffers

Botetourt County-specific SE/SUP conditions control — county-set setbacks vary from 50 ft (rural) to 300+ ft (residential adjacent). Verify current Botetourt County zoning ordinance for adopted local setback standards.

Spacing requirements

None codified

Size restrictions

None codified

Penalties & bonding

No penalties or adjustments. Standard CUP/SUP process.

State-level permits & approvals

Local permit: Special Use Permit (SUP) or Conditional Use Permit (CUP) in A-1 Agricultural zoning; issued by Board of Supervisors (BOS) or Planning Commission per county ordinance. Counties without zoning (Buchanan, Russell, Lee, Scott, etc.) proceed via revenue-sharing siting agreements. SCC CPCN: Va. Code §56-580 (as amended by HB 1558/SB 762, eff. Jul 2021) — SCC Certificate of Public Convenience & Necessity required for generating facilities ≥5 MW; waivable for utility-owned projects under SCC-approved IRP. DEQ Permit by Rule (PBR): Required for all solar facilities ≥1 MW per Va. Code §10.1-1197.6; includes VSMP/VPDES erosion & stormwater permits. Mar 2022 DEQ rule: solar panels counted as impervious surface same as parking lots. Revenue sharing: Va. Code §15.2-2288.7 — localities may require up to $1,400/MW-year for utility-scale solar on agricultural or forestal land; increases 10% in year 1 then every 5 years thereafter. VDACS notice: VA Dept. of Agriculture & Consumer Services must be notified for projects converting prime agricultural or forestal land. PENDING LEGISLATION (as of Mar 11, 2026): HB 711 (Herring) / SB 347 (VanValkenburg) both cleared both chambers and await Gov. Spanberger's signature (session ends Mar 14, 2026). If signed: (1) all localities must allow solar ≥1 MW via special exception — outright bans illegal; (2) statewide setback floor: 150–200 ft non-participating dwellings, 50–100 ft from state roads, 100–250 ft from streams/wetlands, 50–75 ft from property lines; (3) localities retain denial authority but must report reasons to SCC public database; (4) companion HB 891/SB 443: BESS permitted accessory use on approved solar SE sites. Spanberger is pro-solar; signature expected. Monitor: lis.virginia.gov.

🔒
Full permitting requirements

Full records for this county are part of a SitePath subscription.

State policy & grid context

State RPS & clean energy policy

100% carbon-free by 2050 (Dominion), 2045 (APCo) | Virginia Clean Economy Act (2020) | Va. Code §56-585.5

State incentive programs

Virginia Clean Economy Act (VCEA, 2020): Dominion must reach 100% carbon-free by 2045; Appalachian Power by 2050; major driver of utility-scale solar procurement. Net metering: available under VCEA for systems up to 1 MW (by-right); large-scale behind-the-meter negotiated. SCC SolarShare: Dominion program offering renewable energy credits. Virtual net metering (Virginia): programs vary by utility. DEQ review: required for solar facilities ≥150 MW (permit by rule) or DEQ standalone review. Utility: Dominion Energy Virginia serves 2/3 of VA; Appalachian Power (AEP) serves western VA; Northern Virginia Electric Coop (NOVEC) serves NoVA exurbs; various rural cooperatives and municipal utilities.

Grid & interconnection

PJM / Dominion Energy Virginia (DEV) transmission zone

🔒
Full state policy & grid detail

Full records for this county are part of a SitePath subscription.

Battery storage (BESS) P1 State-Default Permitting

Standalone BESS (not co-located with approved solar): still requires county SE/SUP and host siting agreement

Local BESS ordinances & bylaws

County-level battery-storage status, safety requirements, and projects — each linked to a primary source.

Community opposition P1 6 tracked

Organized opposition signals on record for this county — petitions, community groups, and oppositional coverage — each linked to its primary source.

SitePath maintains the most complete community-opposition dataset available, refreshed continuously from primary sources.

Subscriber intel Subscribers

Researched for this county and available with a subscription:

Sign in to view

Energy-related meetings & dockets P1

14 energy-related68 total in calendar6 data center · 3 solar · 3 transmission · 1 wind · 1 bess

Halo color = sentiment of the relevant agenda excerpt: green positive, yellow neutral, red negative.

  • 2026-01-29 Planning Commission
    Transmission

    Pike Fleet will stage vehicles for electric transmission and distribution services at this location.

  • 2018-06-05 Other
    Data Center

    The Botetourt County Planning Commission voted to approve a data center project with SCC approval

  • County Board
    Wind

    The Botetourt County Planning Commission voted to deny APEX Wind Farm Dagger Spring Road Plans due to concerns over environmental impact

  • County Board
    BESS

    The Board approved a proposal for a $150 million battery storage facility in Buchanan District.

  • County Board
    Data Center

    The Board voted to deny a special-use permit application for a 150 MW solar farm.

  • Utility Board
    Data Center

    The Co-Location Center Update committee voted to approve a special-use permit application for a 150 MW solar farm.

  • County Board
    Transmission

    The County Administrator approved a request for a supplemental easement and right-of-way for Appalachian Power Company's electrical transmission line.

  • County Board
    Data Center

    The Board approved the purchase of public assistance transport vehicles for the Senior Citizens Van Program.

  • County Board
    Solar

    The proposed solar farm for Springwood Road will be denied due to concerns about stormwater capacity and the potential photovoltaic heat island effect.

  • Other
    Solar

    The Botetourt County Planning Commission voted to deny a special-use permit application for a 150 MW solar farm due to concerns about its size and potential impact on the environment

  • Other
    Data Center

    The Botetourt County Planning Commission voted to approve a special-use permit application for a 150 MW solar farm.

🔒
11 more energy-related meetings

Full records for this county are part of a SitePath subscription.

State PSC dockets P1

No tracked activity yet — coverage expands weekly.

Local news P3

Explore all 3,143 counties on the interactive map

Filter by grade, state, moratorium status, and compliance stringency. Compare counties side by side.

Open the county map → SitePath home All Virginia counties
Data sources: public agendas/minutes from local government sites; PSC dockets from state regulators; news from GDELT and curated RSS; sentiment derived from public meeting transcripts. Last refreshed 2026-08-27. See the county risk scorecard or the full Virginia permitting index.