Solar permitting — Alexandria city, Virginia

FIPS 51510

On file: public meetings, known opposition groups.

B
Alexandria city, VA
Risk score 36/100 · Full scorecard →
Compliance: LowNo local solar ordinanceTrajectory: StableSaturation: Low

Dense urban NoVA city; no utility-scale solar land; rooftop solar only. Permitting: Alexandria: Site plan / CUP through city planning commission; hard N/A — independent city; limited developable land. Track record: no prior utility-scale solar

Permitting process

Local permitting pathway

Alexandria: Site plan / CUP through city planning commission

Setbacks & buffers

No solar-specific setbacks; governed by general municipal zoning — NOTE: the distances above are a STATE-level fallback, not a figure read from this county's own ordinance. We hold siting-rule records for this county which may include a stricter local limit we have not yet extracted. Verify against the county's own ordinance before relying on these.

Spacing requirements

No spacing requirements codified

Size restrictions

No size restrictions codified

Penalties & bonding

No penalties or adjustments. Standard CUP/SUP process.

State-level permits & approvals

Local zoning approval via city council/planning commission; DEQ PBR for >5 MW; SCC PBR for 5–150 MW utility-scale under VCEA framework HB 711/SB 347 (signed Apr 13 2026, eff. July 1 2026): OUTRIGHT BANS and blanket exclusions on ≥1 MW solar in ag/commercial/industrial/institutional zones PROHIBITED. Localities must accept and review SE/SUP for every ≥1 MW application. Statewide minimum setbacks: 150–200 ft from adjacent houses; 50–100 ft from state roads; 100–250 ft from streams/wetlands. Decommissioning plan required + updated every 5 yrs. Denials reported to SCC public database. Counties CAN still DENY on case-by-case basis. VACo opposed; Virginia Farm Bureau opposed. Passed House 63-33 / Senate 21-17. Source: lis.virginia.gov/bill-details/20261/SB347

Full permitting requirements

Full records for this county are part of a SitePath subscription.

State policy & grid context

State RPS & clean energy policy

100% carbon-free by 2050 (Dominion), 2045 (APCo) | Virginia Clean Economy Act (2020) | Va. Code §56-585.5

State incentive programs

Virginia Clean Economy Act (VCEA); Dominion/AEP net metering (residential/commercial); state solar equipment tax exemption; locality solar revenue share option (SB 1258)

Grid & interconnection

PJM / Dominion Virginia Power zone

Full state policy & grid detail

Full records for this county are part of a SitePath subscription.

Battery storage (BESS) P1 State-Default Permitting

Standalone BESS (not co-located with approved solar): still requires county SE/SUP and host siting agreement

BESS ordinances & bylaws

County-level battery-storage status, safety requirements, and projects — each linked to a primary source.

Community opposition P1

Organized opposition signals on record for this county — petitions, community groups, and oppositional coverage — each linked to its primary source.

SitePath maintains the most complete community-opposition dataset available, refreshed continuously from primary sources.

Subscriber intel Subscribers

Researched for this county and available with a subscription:

Sign in to view

Energy-related meetings & dockets P1

transmission · solar · bess

Halo color matches the energy category tagged on each meeting.

  • Other
    Solar

    The city recognized local businesses that have gone solar.

  • Other
    Transmission

    Dominion Virginia Power requested to install a 230 KVA transmission line between two substations in Arlington and Alexandria.

  • Other
    Transmission

    BACKGROUND: As discussed in the March 12,2019, Dominion Energy 230-kV Update memorandum to City Council (see Attachment 1), Dominion Energy forewent its long-planned 230-kV transmission line project under Potomac Avenue.

  • Other
    Solar

    In addition, the following regulations apply: (a) additional height for mechanical penthouses, solar photovoltaic structures and horizontally adjacent structures for common amenity spaces is permitted up to 20 feet above maximum building he

  • Other
    Transmission

    City Council discussed a transmission line project and its impact on development in the city.

  • Other
    Transmission

    Dominion Virginia Power requested to install a 230 KVA transmission line between two substations in Arlington and Alexandria.

  • Other
    BESS

    City discussed the importance of battery storage and potential funding sources

  • Other
    Transmission

    Dominion Virginia Power requested to install a 230 KVA transmission line between two substations in Arlington and Alexandria.

  • Other
    BESS

    Alexandria city is offering discounted rates for electric vehicle chargers and home battery storage as part of the Solarize Campaign.

  • Other
    Transmission

    The State Corporation Commission approved Dominion Energy's application to relocate existing overhead transmission lines underground.

  • Other
    BESS

    City discussed the importance of battery storage and potential funding sources

More energy-related meetings

Full records for this county are part of a SitePath subscription.

State PSC dockets P1

No tracked activity yet — coverage expands weekly.

Local news P3

No tracked activity yet — coverage expands weekly.

Explore every US county on the interactive map

Filter by grade, state, moratorium status, and compliance stringency. Compare counties side by side.

Open the county map → SitePath home All Virginia counties
Data sources: public agendas/minutes from local government sites; PSC dockets from state regulators; news from GDELT and curated RSS. Last refreshed 2026-10-11. See the county risk scorecard or the full Virginia permitting index.