Solar permitting — Albemarle County, Virginia
On file: public meetings, local news, known opposition groups.
Positive Shift. Permitting: by-right (no discretionary review required); 50-ft setback. Track record: Multiple SUP-approved facilities. Political environment: Democratic majority; key supervisors/commissioners: Donna Price; community: positi…
Key driver: Positive Shift. 2025 ordinance streamlines for by-right up to 21 acres; SUP for larger; emphasis on environmental standards (Pollinator Smart).
Permitting process
Local permitting pathway
by-right, SUP
Setbacks & buffers
Albemarle County-specific SE/SUP conditions control — county-set setbacks vary from 50 ft (rural) to 300+ ft (residential adjacent). Verify current Albemarle County zoning ordinance for adopted local setback standards. — NOTE: the distances above are a STATE-level fallback, not a figure read from this county's own ordinance. We hold siting-rule records for this county which may include a stricter local limit we have not yet extracted. Verify against the county's own ordinance before relying on these.
Spacing requirements
≥300 ft from historic sites; avoid viewsheds/airports
Size restrictions
21 ac fenced by-right; larger via SUP
Penalties & bonding
No penalties or adjustments. Standard CUP/SUP process.
State-level permits & approvals
Local permit: Special Use Permit (SUP) or Conditional Use Permit (CUP) in A-1 Agricultural zoning; issued by Board of Supervisors (BOS) or Planning Commission per county ordinance. Counties without zoning (Buchanan, Russell, Lee, Scott, etc.) proceed via revenue-sharing siting agreements. SCC CPCN: Va. Code §56-580 (as amended by HB 1558/SB 762, eff. Jul 2021) — SCC Certificate of Public Convenience & Necessity required for generating facilities ≥5 MW; waivable for utility-owned projects under SCC-approved IRP. DEQ Permit by Rule (PBR): Required for all solar facilities ≥1 MW per Va. Code §10.1-1197.6; includes VSMP/VPDES erosion & stormwater permits. Mar 2022 DEQ rule: solar panels counted as impervious surface same as parking lots. Revenue sharing: Va. Code §15.2-2288.7 — localities may require up to $1,400/MW-year for utility-scale solar on agricultural or forestal land; increases 10% in year 1 then every 5 years thereafter. VDACS notice: VA Dept. of Agriculture & Consumer Services must be notified for projects converting prime agricultural or forestal land. PENDING LEGISLATION (as of Mar 11, 2026): HB 711 (Herring) / SB 347 (VanValkenburg) both cleared both chambers and await Gov. Spanberger's signature (session ends Mar 14, 2026). If signed: (1) all localities must allow solar ≥1 MW via special exception — outright bans illegal; (2) statewide setback floor: 150–200 ft non-participating dwellings, 50–100 ft from state roads, 100–250 ft from streams/wetlands, 50–75 ft from property lines; (3) localities retain denial authority but must report reasons to SCC public database; (4) companion HB 891/SB 443: BESS permitted accessory use on approved solar SE sites. Spanberger is pro-solar; signature expected. Monitor: lis.virginia.gov.
Full records for this county are part of a SitePath subscription.
State policy & grid context
State RPS & clean energy policy
100% carbon-free by 2050 (Dominion), 2045 (APCo) | Virginia Clean Economy Act (2020) | Va. Code §56-585.5
State incentive programs
Virginia Clean Economy Act (VCEA, 2020): Dominion must reach 100% carbon-free by 2045; Appalachian Power by 2050; major driver of utility-scale solar procurement. Net metering: available under VCEA for systems up to 1 MW (by-right); large-scale behind-the-meter negotiated. SCC SolarShare: Dominion program offering renewable energy credits. Virtual net metering (Virginia): programs vary by utility. DEQ review: required for solar facilities ≥150 MW (permit by rule) or DEQ standalone review. Utility: Dominion Energy Virginia serves 2/3 of VA; Appalachian Power (AEP) serves western VA; Northern Virginia Electric Coop (NOVEC) serves NoVA exurbs; various rural cooperatives and municipal utilities.
Grid & interconnection
PJM / Dominion Energy Virginia (DEV) transmission zone
Full records for this county are part of a SitePath subscription.
Battery storage (BESS) P1 State-Default Permitting
SOLAR + BESS ORDINANCE IN PROCESS — Albemarle County, VA: BOS public hearing held July 16 2025 on combined Solar and Battery Storage Ordinance approved by Planning Commission in January 2025
Local BESS ordinances & bylaws
County-level battery-storage status, safety requirements, and projects — each linked to a primary source.
Community opposition P1
Organized opposition signals on record for this county — petitions, community groups, and oppositional coverage — each linked to its primary source.
SitePath maintains the most complete community-opposition dataset available, refreshed continuously from primary sources.
Subscriber intel Subscribers
Researched for this county and available with a subscription:
- Project track record
- Developer intelligence
- Governing board
Energy-related meetings & dockets P1
Halo color matches the energy category tagged on each meeting.
- OtherSolar
hosted two of its Installing and Designing PV (PhotoVoltaic) Systems credentialing training programs in the area, serving ___ community members, including ___ Albemarle residents.
- OtherTransmission
7-1400 High voltage transmission lines Any public utility is required to obtain a certificate of public convenience and necessity from the State Corporation Commission before it constructs, enlarges, or acquires, any facilities for use in…
- OtherData Center
Existing Data Center Regulations The County currently allows data centers of up to 40,000 square feet in areas with industrial zoning.
State PSC dockets P1
No tracked activity yet — coverage expands weekly.
Local news P3
- 2026-06-24 Uva Data Center Plans
- 2026-06-17 University Of Virginias Planned Data Center Grows To 102M
- 2026-06-01 Earl Zimmerman Whats Making News In Climate Energy Environment
- 2026-05-13 Dominion Energy Converts Closed Landfill Into Solar Farm Albemarle County
- 2026-03-27 Clean Energy Restrictive Siting Laws
- 2026-03-25 Loudoun Chair Randall Strengthening Democracy In Data Center Alley
- 2025-12-07 Castagno Albemarle Countys Cautious Approach To Data Centers Should Be A Model
- 2025-12-04 Virginia Grapples With How Address Data Center Growth Ahead Legislative Session
- 2025-10-13 Albemarle County Sierra Club Hosting Event On Farming Solar Facilities
- 2025-09-17 Data Centers Boom Or Bust For Albemarle County
- 2025-08-22 Albemarle County S New Solar Ordinance 4092257
- 2025-08-01 Albemarle County Grapples With Proposed Data Center Regulation