B
Beltrami County, MN
Risk score 36/100 · Full scorecard →
Compliance: ModerateSolar ordinance on fileTrajectory: StableSaturation: Low

Large north-central MN county; rural/forested; limited solar history; PUC pathway for large projects. Permitting: Beltrami County Board: CUP in Agricultural district. Track record: No named utility-scale project (≥50 MW) confirmed in…

Permitting process

Local permitting pathway

Beltrami County Board: CUP in Agricultural district (IUP or conditional use) for projects <50 MW.

Setbacks & buffers

State guidance: Accessory structure setbacks apply by district; no statewide minimum solar-specific setback

Spacing requirements

None codified.

Size restrictions

None codified; managed via CUP/SUP conditions

Penalties & bonding

No penalties or adjustments. Standard CUP/SUP process.

State-level permits & approvals

Minnesota Energy Infrastructure Permitting Act (MEIPA), effective July 1, 2025: consolidates permitting into Standard Review (solar, wind, storage, <80 MW non-renewable) and Major Review (large non-renewable, HVTLs >300 kV >30 mi). MPUC has siting authority for solar ≥50 MW (site permit required). Projects <50 MW: county/township CUP governs. Counties may assume permitting of wind 5–25 MW by resolution. Pre-2025 projects: governed by Minn. Stat. Ch. 216E site permit process. No state preemption of local ordinances for sub-threshold projects — pure local control. MISO territory statewide.

🔒
Full permitting requirements

Full records for this county are part of a SitePath subscription.

State policy & grid context

State RPS & clean energy policy

100% carbon-free by 2040 | Act 7 (2023) | Minn. Stat. §216B.1691

State incentive programs

Minnesota Renewable Energy Standard (RES): 80% carbon-free by 2030; 100% by 2040 (enacted 2023, Minnesota Next Generation Energy Act). Community Solar Gardens: Xcel Energy Solar*Rewards Community (legacy, uncapped) and new LMI-Accessible CSG Program (179 MW approved by Dec 2025; 620 MW cap by 2030; pv-magazine Mar 19 2026). Minnesota MEIPA (Minnesota Energy Infrastructure Permitting Act, eff. July 1 2025): new state permit required for solar ≥50 MW. PACE financing available statewide. Utility: Xcel Energy (NSP) serves 7-county Twin Cities metro; Great Plains Energy serves southern MN; Minnesota Power (ALLETE) serves northern MN/Arrowhead; Otter Tail Power serves western MN; more than 100 electric cooperatives serve rural areas.

Grid & interconnection

MISO / NSP West (NSPW / Xcel) zone

🔒
Full state policy & grid detail

Full records for this county are part of a SitePath subscription.

Community opposition P1

No organized opposition on record for this county yet — no petition, group, or oppositional coverage tracked. Absence of opposition is a positive siting signal.

Subscriber intel Subscribers

Researched for this county and available with a subscription:

Sign in to viewSee plans

Energy-related meetings & dockets P1

1 meeting indexed for this jurisdiction; none flagged as discussing solar, BESS, data centers, wind, or transmission yet. Coverage expands weekly.

State PSC dockets P1

No tracked activity yet — coverage expands weekly.

Local news P3

🔒
2 more news items

Full records for this county are part of a SitePath subscription.

Explore all 3,143 counties on the interactive map

Filter by grade, state, moratorium status, and compliance stringency. Compare counties side by side.

Open the county map → SitePath home All Minnesota counties
Data sources: public agendas/minutes from local government sites; PSC dockets from state regulators; news from GDELT and curated RSS; sentiment derived from public meeting transcripts. Last refreshed 2026-07-12. See the county risk scorecard or the full Minnesota permitting index.