Solar permitting — Decatur County, Indiana
2 news items, 10 known opposition groups.
Active Moratorium — under solar moratorium while developing dedicated ordinance (date uncertain, confirmed active 2025); moratorium expires active 2025. Permitting: Decatur County Area Plan Commission; 250-ft max / 40-ft min setbacks. Track record: Multiple BZA special exceptio…
Key driver: Rural south-central Indiana; SE pathway; limited track record.
Permitting process
Local permitting pathway
Decatur County Area Plan Commission (APC): CUP or Improvement Location Permit (ILP) in Agricultural district.
Setbacks & buffers
IC 8-1-42-10 default standards, measured as a straight line from the nearest outer edge of the solar panels: 50 ft to the property line of any NON-PARTICIPATING property; 250 ft to the outer wall of a dwelling on non-participating property (a landscape buffer is required within that distance); and to the nearest edge of the right-of-way, 40 ft for an interstate, federal, state or county highway, 30 ft for a collector road, 10 ft for a local road. Panels capped at 25 ft at full tilt. Setback and buffer requirements are waivable with the written consent of each affected non-participating owner. A decommissioning surety bond is required under IC 8-1-42-18 — NOTE: the distances above are a STATE-level fallback, not a figure read from this county's own ordinance. We hold siting-rule records for this county which may include a stricter local limit we have not yet extracted. Verify against the county's own ordinance before relying on these.
Spacing requirements
None codified.
Size restrictions
None codified; managed via CUP/SUP conditions
Penalties & bonding
Total penalty: +28 (Moratorium +28)
State-level permits & approvals
Local permit: Special Exception (SE) in A-1 Agricultural zoning via county Board of Zoning Appeals (BZA); some counties use two-step process (Plan Commission recommendation + BZA approval). BZA SE is the standard county-level pathway for all utility-scale solar. IURC CPCN: Indiana Code §8-1-8.5 — IURC Certificate of Public Convenience & Necessity (Cause No.) required for generating facilities >80 MW; process runs parallel to county BZA SE and does not replace it. IURC approval does NOT override a county BZA denial except where federal jurisdiction applies (see Mammoth Solar / Pulaski County precedent, 2023). IC 36-7-4: Indiana Code §36-7-4 limits how restrictive county ordinances can be for solar; basis for developer preemption litigation against overly restrictive ordinances (Randolph County 2024 litigation pending). SB 411 (2022): Voluntary 'solar-ready county' designation for counties meeting solar-friendly siting standards. SB 390 (2023): $1/MWh financial incentive for solar-ready counties.
Full records for this county are part of a SitePath subscription.
State policy & grid context
State RPS & clean energy policy
No binding RPS — voluntary 10% by 2025 | Indiana Voluntary Clean Energy Portfolio Standard (2011) | Ind. Code §8-1-37
State incentive programs
Indiana Renewable Energy law (IURC): no Renewable Portfolio Standard — Indiana repealed its RPS (HB 1271, effective 2023). Net metering: available for ≤1 MW retail customer generation (IURC regulated utilities); Indiana Michigan Power (AEP), Duke Energy Indiana, Vectren/CenterPoint, NIPSCO offer programs. IURC CPCN: required for generating facilities ≥80 MW. HEA 1381 (2022): counties retain siting authority for solar in unincorporated areas. No state cash incentive program for solar. Utility: Duke Energy Indiana serves central/eastern IN; NIPSCO (NiSource) serves NW IN (Cook/Lake/Porter); Indiana Michigan Power (AEP) serves northeastern IN; Vectren/CenterPoint serves SW IN; REMC cooperatives serve rural areas.
Grid & interconnection
PJM / AEP Indiana Michigan Power (eastern IN border zone) — verify by exact project location
Full records for this county are part of a SitePath subscription.
Battery storage (BESS) P1 Standalone Ordinance
STATE FRAMEWORK FOR ALL UTILITY-SCALE BESS
BESS ordinances & bylaws
County-level battery-storage status, safety requirements, and projects — each linked to a primary source.
Community opposition P1 9 tracked
Organized opposition signals on record for this county — petitions, community groups, and oppositional coverage — each linked to its primary source.
- Locals launch petition opposing proposed 550-acre data center campus in Decatur County, Indiana Data center
- Councilors advance temporary data center moratorium that Hogsett backs Data center
- Decatur Co. zoning meeting tonight on proposed solar project Wind
- Decatur — Indiana Solar Status Wind
- Decatur Township residents continue fight against data center Data center
- Indianapolis approves data center moratorium ban through 2027 Data center
- Industrial Solar Plants in Decatur County, Indiana Meeting ... Solar
- Copied text from Decatur County Citizens Stop Industrial Solar & ... Solar
- Community opposition to Jumping Bison LLC Data Center data center Data center
SitePath maintains the most complete community-opposition dataset available, refreshed continuously from primary sources.
Subscriber intel Subscribers
Researched for this county and available with a subscription:
- 🔒Project track record
- 🔒Developer intelligence
- 🔒Governing board
Energy-related meetings & dockets P1
No tracked activity yet — coverage expands weekly.
State PSC dockets P1
No tracked activity yet — coverage expands weekly.
Local news P3
Filter by grade, state, moratorium status, and compliance stringency. Compare counties side by side.