Solar permitting — Benton County, Indiana
No tracked activity yet — coverage expands weekly.
Paradox county: Easiest/Least Stringent ordinance but near-maximum saturation (S=90). Permitting: Benton County Area Plan Commission; 250-ft max / 40-ft min setbacks. Track record: Fowler Ridge Solar I & II (multiple developers incl.
Key driver: Paradox county: Easiest/Least Stringent ordinance but near-maximum saturation (S=90). First-mover county for large-scale Indiana solar; multiple 100–200 MW projects operational. Risk is saturation-driven, not compliance-driven: available land with viable interconnection approaching exhaustion; future projects limited by remaining leasable acreage.
Permitting process
Local permitting pathway
Benton County Area Plan Commission (APC): CUP or Improvement Location Permit (ILP) in Agricultural district.
Setbacks & buffers
Commercial solar (CSECS): 75 ft from the centre of a county maintenance ditch or right-of-way to a solar panel; 200 ft from the foundation of a primary dwelling on a non-participating parcel; solar farms must also meet the minimum zoning setbacks of their district. These setbacks may be waived in writing by adjacent property owners (per §VI)
Spacing requirements
None codified.
Size restrictions
None codified.
Penalties & bonding
No penalties or adjustments. Standard CUP/SUP process.
State-level permits & approvals
Local permit: Special Exception (SE) in A-1 Agricultural zoning via county Board of Zoning Appeals (BZA); some counties use two-step process (Plan Commission recommendation + BZA approval). BZA SE is the standard county-level pathway for all utility-scale solar. IURC CPCN: Indiana Code §8-1-8.5 — IURC Certificate of Public Convenience & Necessity (Cause No.) required for generating facilities >80 MW; process runs parallel to county BZA SE and does not replace it. IURC approval does NOT override a county BZA denial except where federal jurisdiction applies (see Mammoth Solar / Pulaski County precedent, 2023). IC 36-7-4: Indiana Code §36-7-4 limits how restrictive county ordinances can be for solar; basis for developer preemption litigation against overly restrictive ordinances (Randolph County 2024 litigation pending). SB 411 (2022): Voluntary 'solar-ready county' designation for counties meeting solar-friendly siting standards. SB 390 (2023): $1/MWh financial incentive for solar-ready counties.
Full records for this county are part of a SitePath subscription.
State policy & grid context
State RPS & clean energy policy
No binding RPS — voluntary 10% by 2025 | Indiana Voluntary Clean Energy Portfolio Standard (2011) | Ind. Code §8-1-37
State incentive programs
Indiana Renewable Energy law (IURC): no Renewable Portfolio Standard — Indiana repealed its RPS (HB 1271, effective 2023). Net metering: available for ≤1 MW retail customer generation (IURC regulated utilities); Indiana Michigan Power (AEP), Duke Energy Indiana, Vectren/CenterPoint, NIPSCO offer programs. IURC CPCN: required for generating facilities ≥80 MW. HEA 1381 (2022): counties retain siting authority for solar in unincorporated areas. No state cash incentive program for solar. Utility: Duke Energy Indiana serves central/eastern IN; NIPSCO (NiSource) serves NW IN (Cook/Lake/Porter); Indiana Michigan Power (AEP) serves northeastern IN; Vectren/CenterPoint serves SW IN; REMC cooperatives serve rural areas.
Grid & interconnection
MISO / Indiana Michigan Power (I&M) / ATC transmission zone
Full records for this county are part of a SitePath subscription.
Battery storage (BESS) P1 Standalone Ordinance
STATE FRAMEWORK FOR ALL UTILITY-SCALE BESS
BESS ordinances & bylaws
County-level battery-storage status, safety requirements, and projects — each linked to a primary source.
Community opposition P1
No organized opposition on record for this county yet — no petition, group, or oppositional coverage tracked. Read that as nothing found, not as nothing there: absence of records is not evidence of local support.
Subscriber intel Subscribers
Researched for this county and available with a subscription:
- Project track record
- Developer intelligence
- Governing board
Energy-related meetings & dockets P1
No tracked activity yet — coverage expands weekly.
State PSC dockets P1
No tracked activity yet — coverage expands weekly.
Local news P3
No tracked activity yet — coverage expands weekly.
Filter by grade, state, moratorium status, and compliance stringency. Compare counties side by side.