Solar permitting — Seminole County, Florida
No tracked activity yet — coverage expands weekly.
⛔ ACTIVE MORATORIUM — Active Moratorium; moratorium expires —confirm expiration with county planning. Permitting: CUP required in agricultural zones. Political environment: Democratic majority; community: supportive. Grid: SERC; utility: Duke Energy Florida. Regulatory references: RPS: None (no bind…
Key driver: Dense Orlando suburb with virtually no utility-scale solar land; Duke Energy FL territory; strong sustainability policy (Green Works) creating improving trajectory; no moratorium; high score (44) reflects density/land constraint not policy hostility; Duke Energy FL virtual IRP procurement serves county renewable goals
Permitting process
Local permitting pathway
CUP required in agricultural zones; county commission review; Green Works sustainability orientation makes commissioners receptive; limited agricultural land means few CUP applications have been filed
Setbacks & buffers
No solar-specific setbacks; standard agricultural zone setbacks apply; high urban density means most parcels are too small for utility-scale; Duke Energy FL virtual procurement serves county renewable goals
Spacing requirements
None established
Size restrictions
No county cap; FPSA applies for facilities >75 MW; urban density makes utility-scale development essentially impossible within county
Penalties & bonding
Total penalty: +28 | Active moratorium: +28
State-level permits & approvals
Florida Power Siting Act (FPSA) — Florida DEP has siting jurisdiction for facilities >75 MW. Below 75 MW, county land use authority governs via CUP/SUP process. Florida Statute §163.3205 (2024) limits county restrictions on solar in agricultural zones — cannot prohibit as a matter of law. No state-level preemption below 75 MW threshold. FPL (NextEra Energy) dominates utility-scale procurement in southern and eastern FL; Duke Energy Florida serves central west coast; Tampa Electric (TECO) serves Hillsborough/Polk corridor; Florida Power & Light interconnects through FPL transmission. County commission approves CUPs for projects <75 MW in unincorporated areas.
Full records for this county are part of a SitePath subscription.
State policy & grid context
State RPS & clean energy policy
No binding RPS | None | Florida has no state RPS; utility IRPs (TYSP) only
State incentive programs
Florida has no state RPS (Renewable Portfolio Standard) — only a voluntary goal (100% clean energy by 2050). Key incentives: Federal ITC (30% base + energy community/domestic content adders). Florida Statute §163.3205 (2024) limits local government ability to restrict solar on agricultural land — counties cannot ban solar outright on ag-zoned land. Net metering available. Property tax exemption for residential solar (FL Const. Art. VII §3). No state income tax. USDA REAP for rural projects. FPL, Duke Energy Florida, and Tampa Electric IRP programs include significant utility-scale solar procurement.
Grid & interconnection
SERC / Florida Reliability Coordinating Council (FRCC) | Duke Energy Florida transmission zone
Full records for this county are part of a SitePath subscription.
Community opposition P1
No organized opposition on record for this county yet — no petition, group, or oppositional coverage tracked. Absence of opposition is a positive siting signal.
Subscriber intel Subscribers
Researched for this county and available with a subscription:
- 🔒Project track record
- 🔒Developer intelligence
- 🔒Community & board sentiment
- 🔒Governing board
Energy-related meetings & dockets P1
No tracked activity yet — coverage expands weekly.
State PSC dockets P1
No tracked activity yet — coverage expands weekly.
Sentiment rollup P2
No sentiment rollup yet (requires meeting transcripts to be processed).
Local news P3
No tracked activity yet — coverage expands weekly.
Filter by grade, state, moratorium status, and compliance stringency. Compare counties side by side.