Compliance: ModerateTrajectory: StableSaturation: Low

Florida Keys — isolated island chain served by KEYS Energy Services isolated grid, not connected to mainland F. Permitting: No utility-scale solar CUP mechanism needed or applicable; hard Not applicable — no utility-scale sola…

Key driver: Florida Keys — isolated island chain served by KEYS Energy Services isolated grid, not connected to mainland FRCC; utility-scale solar is physically impossible due to island geography and grid isolation; no moratorium, no hostile policy; grade B reflects permissive local policy; high risk score (51) reflects geographic constraint; KEYS community solar and rooftop programs active

Permitting process

Local permitting pathway

No utility-scale solar CUP mechanism needed or applicable; KEYS Energy Services manages all generation procurement for the Keys grid internally; distributed solar permitted via KEYS net metering and community solar programs

Setbacks & buffers

No solar-specific setbacks relevant to utility-scale applications; island geography and KEYS isolated grid are the binding constraints, not county ordinance

Spacing requirements

Not applicable

Size restrictions

Grid capacity constraints apply — KEYS isolated grid has very limited capacity for additional generation

Penalties & bonding

Total penalty: +18 (Ordinance +18)

State-level permits & approvals

Florida Power Siting Act (FPSA) — Florida DEP has siting jurisdiction for facilities >75 MW. Below 75 MW, county land use authority governs via CUP/SUP process. Florida Statute §163.3205 (2024) limits county restrictions on solar in agricultural zones — cannot prohibit as a matter of law. No state-level preemption below 75 MW threshold. FPL (NextEra Energy) dominates utility-scale procurement in southern and eastern FL; Duke Energy Florida serves central west coast; Tampa Electric (TECO) serves Hillsborough/Polk corridor; Florida Power & Light interconnects through FPL transmission. County commission approves CUPs for projects <75 MW in unincorporated areas.

🔒
Full permitting requirements

Full records for this county are part of a SitePath subscription.

State policy & grid context

State RPS & clean energy policy

No binding RPS | None | Florida has no state RPS; utility IRPs (TYSP) only

State incentive programs

Florida has no state RPS (Renewable Portfolio Standard) — only a voluntary goal (100% clean energy by 2050). Key incentives: Federal ITC (30% base + energy community/domestic content adders). Florida Statute §163.3205 (2024) limits local government ability to restrict solar on agricultural land — counties cannot ban solar outright on ag-zoned land. Net metering available. Property tax exemption for residential solar (FL Const. Art. VII §3). No state income tax. USDA REAP for rural projects. FPL, Duke Energy Florida, and Tampa Electric IRP programs include significant utility-scale solar procurement.

Grid & interconnection

SERC / Florida Reliability Coordinating Council (FRCC) | Keys Energy Services (KEYS) — isolated island grid, not interconnected with mainland FRCC

🔒
Full state policy & grid detail

Full records for this county are part of a SitePath subscription.

Battery storage (BESS) P1 State-Default Permitting

No confirmed county BESS ordinance.

Local BESS ordinances & bylaws

County-level battery-storage status, safety requirements, and projects — each linked to a primary source.

Community opposition P1 1 tracked

Organized opposition signals on record for this county — petitions, community groups, and oppositional coverage — each linked to its primary source.

SitePath maintains the most complete community-opposition dataset available, refreshed continuously from primary sources.

Subscriber intel Subscribers

Researched for this county and available with a subscription:

Sign in to view

Energy-related meetings & dockets P1

No tracked activity yet — coverage expands weekly.

State PSC dockets P1

No tracked activity yet — coverage expands weekly.

Local news P3

No tracked activity yet — coverage expands weekly.

Explore every US county on the interactive map

Filter by grade, state, moratorium status, and compliance stringency. Compare counties side by side.

Open the county map → SitePath home All Florida counties
Data sources: public agendas/minutes from local government sites; PSC dockets from state regulators; news from GDELT and curated RSS. Last refreshed 2026-09-08. See the county risk scorecard or the full Florida permitting index.