SitePath › County map › Florida › Indian River County
Florida

Indian River County

FIPS 12061

Indian River County, Florida: solar permitting grade D (score 54/100, High Risk). Score has been stable over the last 12 months. Primary-source ordinance and board-vote data on SitePath.

D
Score 54/100
High Risk

Public summary

GradeD · High Risk · Score 54/100
Population159,923
Solar ordinanceNo specific solar ordinance recorded
Active moratoriumNone on record
Regulatory trajectoryStable (no material ordinance movement)
12-month score movementStable
Last verified2026-05-02

Developer outlook

Indian River County is a high-risk jurisdiction for utility-scale solar — documented ordinance hurdles are significant and approval history is mixed or unfavorable. Florida's state policy environment adds headwinds — the absence of a strong RPS framework means county-level resistance faces less counterbalancing pressure. Market saturation is elevated in this area — expect competition for prime land parcels and interconnection capacity.

Local intel

No energy-related meetings, PSC dockets, or named opposition tracked for this county yet. See indexed calendar →

Nearby counties where SitePath is tracking energy activity: Polk County (≈71 mi) · Orange County (≈72 mi) · Palm Beach County (≈73 mi)

Browse all Florida county grades →

Cities, towns & townships

Local governments in Indian River County. An incorporated city, town or village can adopt its own zoning, separate from the county’s.

Source: U.S. Census Bureau, incorporated places and county subdivisions with an active government.

Nearby counties

Compare these counties side-by-side →

Indian River County ranks #63 of 67 ranked Florida counties (1 = lowest permitting risk). Lowest-risk in Florida: Hardee County (A · 26), Pinellas County (A · 28), Osceola County (B · 31). See all Florida county grades →

Want the full record?

Setback distances, board vote histories, source documents, and ordinance amendments are available in the full county profile. The map is free; a walkthrough shows you the underlying record.

About this score

Every U.S. county is scored 0–100 on solar permitting risk (lower is friendlier to development). The grade is a weighted composite of compliance stringency, market saturation, regulatory trajectory, and data uncertainty. Every figure traces back to a primary government document. Read the full methodology →

Related reading

SitePath Intelligence is a research platform. Data verified as of 2026-05-02. Scores update on a quarterly review cycle.