Solar permitting — Wasco County, Oregon
2 news items.
The Dalles industrial energy corridor tradition (Columbia River hydropower, aluminum industry) creates strong. Permitting: EFU; 200-ft max / 100-ft min setbacks; hard No county cap. Track record: Deschutes Solar & Storage — 1,000 MW
Key driver: The Dalles industrial energy corridor tradition (Columbia River hydropower, aluminum industry) creates strong acceptance for solar; Google data center presence demonstrates large energy infrastructure capacity; northern NSA area more restricted; excellent BPA transmission access via John Day–Celilo corridor
Permitting process
Local permitting pathway
EFU, Grazing (G), The Dalles Urban Growth Boundary, Industrial (The Dalles energy corridor), Columbia River Gorge NSA (northern county), Moro/Dufur/Shaniko rural zones
Setbacks & buffers
100 ft from property lines; 200 ft from residences in EFU; NSA scenic setbacks north of The Dalles (200+ ft from scenic highways)
Spacing requirements
None specified
Size restrictions
Columbia River Gorge Commission approval for NSA areas; ODOE >35 MW; county CUP for non-NSA; BPA interconnection for transmission
Penalties & bonding
Total penalty: +15 | Hostile ordinance flag: +15
State-level permits & approvals
ORS 215 EFU CUP; Columbia River Gorge Commission for NSA areas; ODOE >35 MW; Wasco County Zoning Ordinance
Full records for this county are part of a SitePath subscription.
State policy & grid context
State RPS & clean energy policy
50% by 2040 (large IOUs) + 100% clean by 2040 | HB 2021 (2021) | ORS §469A.005 et seq.
State incentive programs
Eligible — Oregon Solar + Storage Rebate Program; Energy Trust of Oregon; federal IRA investment tax credits
Grid & interconnection
Pacific Power (PacifiCorp); BPA (John Day Dam–Celilo converter station; premier BPA transmission hub)
Full records for this county are part of a SitePath subscription.
Community opposition P1
No organized opposition on record for this county yet — no petition, group, or oppositional coverage tracked. Absence of opposition is a positive siting signal.
Subscriber intel Subscribers
Researched for this county and available with a subscription:
- 🔒Project track record
- 🔒Developer intelligence
- 🔒Community & board sentiment
- 🔒Governing board
Energy-related meetings & dockets P1
No tracked activity yet — coverage expands weekly.
State PSC dockets P1
No tracked activity yet — coverage expands weekly.
Sentiment rollup P2
No sentiment rollup yet (requires meeting transcripts to be processed).
Local news P3
Filter by grade, state, moratorium status, and compliance stringency. Compare counties side by side.