EFU land restrictions under ORS 215 and limited grid infrastructure constrain large-scale development; low pop. Permitting: EFU; 200-ft max / 100-ft min setbacks. Track record: no prior utility-scale solar on record — greenfield juri…
Key driver: EFU land restrictions under ORS 215 and limited grid infrastructure constrain large-scale development; low population density (~16k) limits rooftop solar market; good eastern Oregon solar irradiance partially offsets barriers
Permitting process
Local permitting pathway
EFU (Exclusive Farm Use) dominates; Rural Industrial and Grazing zones allow energy development with CUP
Setbacks & buffers
100 ft from property lines; 200 ft from occupied residences in EFU zones
Spacing requirements
None specified
Size restrictions
ODOE siting jurisdiction for facilities >35 MW; county CUP for smaller commercial installations
Penalties & bonding
No penalties or adjustments. Standard CUP/SUP process.
State-level permits & approvals
ORS 215 EFU conditional use permit; ODOE Energy Facility Siting Council for >35 MW; LCDC Goal 3 (Agricultural Lands) compliance required
Full records for this county are part of a SitePath subscription.
State policy & grid context
State RPS & clean energy policy
50% by 2040 (large IOUs) + 100% clean by 2040 | HB 2021 (2021) | ORS §469A.005 et seq.
State incentive programs
Eligible — Oregon Solar + Storage Rebate Program (ODOE); Energy Trust of Oregon Business incentives
Grid & interconnection
PacifiCorp Rocky Mountain Power; BPA high-voltage transmission corridor (Jim Bridger–Midpoint)
Full records for this county are part of a SitePath subscription.
Battery storage (BESS) P1 State-Default Permitting
No confirmed county BESS ordinance.
Local BESS ordinances & bylaws
County-level battery-storage status, safety requirements, and projects — each linked to a primary source.
Community opposition P1
No organized opposition on record for this county yet — no petition, group, or oppositional coverage tracked. Absence of opposition is a positive siting signal.
Subscriber intel Subscribers
Researched for this county and available with a subscription:
- 🔒Project track record
- 🔒Developer intelligence
- 🔒Community & board sentiment
- 🔒Governing board
Energy-related meetings & dockets P1
No tracked activity yet — coverage expands weekly.
State PSC dockets P1
No tracked activity yet — coverage expands weekly.
Sentiment rollup P2
No sentiment rollup yet (requires meeting transcripts to be processed).
Local news P3
Filter by grade, state, moratorium status, and compliance stringency. Compare counties side by side.