Solar permitting — Washtenaw County, Michigan
On file: public meetings, local news, known opposition groups.
Ann Arbor/U-M; progressive; growing suburban; active solar in rural townships; PA 233 certainty. Permitting: Washtenaw County/Township: CUP in applicable zoning district; 300-ft max / 100-ft min setbacks. Track record: Ranger Power / MPPA…
Permitting process
Local permitting pathway
Washtenaw County/Township: CUP in applicable zoning district (sub-50 MW). ≥50 MW subject to MPSC siting unless CREO adopted.
Setbacks & buffers
PA 233 standards for a solar facility (MCL 460.1226(8)): 300 ft from the nearest point on the outer wall of occupied community buildings and dwellings on NON-PARTICIPATING properties; 50 ft from the nearest edge of a public road right-of-way; 50 ft from the nearest shared property line of non-participating parties. Solar array may not exceed 25 ft above ground at full tilt, and must not generate more than 55 dB hourly average at the nearest wall of a non-participating property. These are the standards a local ordinance must not exceed to remain a Compatible Renewable Energy Ordinance; the Commission has siting authority for facilities of 50 MW or greater where no CREO applies — NOTE: the distances above are a STATE-level fallback, not a figure read from this county's own ordinance. We hold siting-rule records for this county which may include a stricter local limit we have not yet extracted. Verify against the county's own ordinance before relying on these.
Spacing requirements
None codified.
Size restrictions
None codified.
Penalties & bonding
No penalties or adjustments. Standard CUP/SUP process.
State-level permits & approvals
PA 233 of 2023 (HB 5120) — effective Nov 29, 2024: MPSC has siting authority for solar ≥50 MW, wind ≥100 MW, storage ≥50 MW / 200 MWh, unless affected local unit has adopted a Compatible Renewable Energy Ordinance (CREO) meeting state setback/height minimums. If CREO in place, developer must use local process; if no CREO or CREO is more restrictive than PA 233, developer may go directly to MPSC. MPSC may overrule local denial; if it does, local unit loses CREO status for future projects. 21 minimal conditions apply to all MPSC-approved projects (fencing, acoustics, decommissioning bond, etc.). As of Mar 2026, multiple townships and counties have sued MPSC challenging PA 233 implementation. Projects <50 MW solar / <100 MW wind: local CUP/SUP process governs under township/county zoning. MISO interconnection required. Most of MI in MISO; SE corner (Lenawee, Monroe, parts of Wayne) in PJM via AEP.
Full records for this county are part of a SitePath subscription.
State policy & grid context
State RPS & clean energy policy
60% renewable by 2035, 100% clean by 2040 | PA 235 (2023) / Clean Energy and Jobs Act | MCL 460.1001 et seq.
State incentive programs
Michigan Renewable Energy Standard (PA 295/PA 342): 15% by 2021 (met); Michigan EGLE: state agency oversees environmental permitting for solar under MI PA 233 (2023) and PA 235 (2023). MI PA 233/235 (enacted Nov 2023): new state preemption for solar ≥50 MW — county renewable energy overlay or state MPSC review. Net metering: PA 235 of 2023 raised DG cap to 10% of utility peak load; DTE Energy, Consumers Energy offer net metering programs. MI EGLE grants: Community Resilience Grant for local solar/storage. Utility: DTE Energy serves SE MI/Detroit metro; Consumers Energy serves mid-Michigan; Upper Peninsula Power (UPPCO) serves some UP areas; various electric cooperatives rural.
Grid & interconnection
MISO / Consumers Energy (CE) zone
Full records for this county are part of a SitePath subscription.
Battery storage (BESS) P1 State-Default Permitting
No standalone county BESS ordinance confirmed.
BESS ordinances & bylaws
County-level battery-storage status, safety requirements, and projects — each linked to a primary source.
Community opposition P1
Organized opposition signals on record for this county — petitions, community groups, and oppositional coverage — each linked to its primary source.
SitePath maintains the most complete community-opposition dataset available, refreshed continuously from primary sources.
Subscriber intel Subscribers
Researched for this county and available with a subscription:
- Project track record
- Developer intelligence
- Governing board
Energy-related meetings & dockets P1
No meetings on file for this jurisdiction flagged as discussing solar, BESS, data centers, wind, or transmission yet. Coverage expands weekly.
State PSC dockets P1
No tracked activity yet — coverage expands weekly.
Local news P3
- 2026-09-27 Macomb County Asked For Help In Trying To Control Potential Data Centers
- 2026-09-26 Ann Arbor For Public Power Debates Dte Backed Group Over Ballot Proposal
- 2026-08-18 Ypsilanti Township Eyes Moratorium On Power Transmission To Slow U M Data Center
Filter by grade, state, moratorium status, and compliance stringency. Compare counties side by side.