Solar permitting — Plymouth County, Massachusetts
70 indexed meetings (5 energy-related), 9 news items, 1 tracked court case.
SE MA; Plymouth/Brockton area; Plymouth Rock tourism; suburban/rural mix; active utility-scale solar in rural. Permitting: Municipal Planning Board: Special Permit or variance. Track record: 23 SMART Program solar projects totaling 107 MW in…
Key driver: SE MA; Plymouth/Brockton area; Plymouth Rock tourism; suburban/rural mix; active utility-scale solar in rural areas; EFSB >25 MW
Permitting process
Local permitting pathway
Municipal Planning Board: Special Permit or variance (≤25 MW). EFSB master permit for >25 MW.
Setbacks & buffers
None codified at county level. Municipal bylaws govern ≤25 MW; EFSB review for >25 MW.
Spacing requirements
None codified.
Size restrictions
None codified.
Penalties & bonding
No penalties or adjustments. Standard CUP/SUP process.
State-level permits & approvals
2024 Massachusetts Climate Act (signed Nov 21, 2024): historic reform of siting and permitting. Large projects (>25 MW generation or >100 MWh storage): Energy Facilities Siting Board (EFSB) consolidates state and local review into single master permit; 15-month deadline for EFSB decision. Small projects (≤25 MW / ≤100 MWh): municipalities retain permitting authority under new streamlined process (225 CMR 29.00 promulgated Feb 27, 2026; effective immediately). 12-month deadline for municipal decisions on small clean energy projects. MGL Ch.40A §3 (Massachusetts Zoning Act): zoning ordinances cannot prohibit or unreasonably regulate solar energy systems — long-standing solar protection for sub-threshold projects. DOER site suitability scoring framework; community benefit plan requirements for larger projects. ISO-NE interconnection required statewide.
Full records for this county are part of a SitePath subscription.
State policy & grid context
State RPS & clean energy policy
40% by 2030 + 80% Clean Peak / net-zero by 2050 | Act Creating Next-Gen Roadmap for MA Climate Policy (2021) | G.L. c.25A §11F
State incentive programs
MA SMART Program (Solar Massachusetts Renewable Target): production incentive paid per kWh generated for 10 years for projects ≤5 MW; administered by DOER/utilities. Adder rates for low-income housing, brownfields, rooftops, and agrivoltaic projects. Net metering: available statewide (up to 5 MW for behind-the-meter); MA expanded net metering cap via DPU. MA RPS: 40% renewable by 2030 (Class I); Class I solar carve-out drives SREC value. MA Clean Energy Center MassSave: rebates for commercial/industrial efficiency and solar. Utility: Eversource (NSTAR/WMECo) and National Grid serve most counties; Cape Light Compact serves Barnstable and Dukes; various municipal aggregations active.
Grid & interconnection
ISO-NE / Southeast Massachusetts (SEMA) zone — Eversource / Unitil
Full records for this county are part of a SitePath subscription.
Battery storage (BESS) P1 Active Storage Market
Town-zoned (no county land-use authority). Active towns: Carver, Wareham, Duxbury, Rochester, Middleborough. 6 tracked storage project(s).
Local BESS ordinances & bylaws
- Massachusetts DOER Draft BESS Model Bylaw (Oct 2025): three-tier system for municipalities. Tier 1 (<1 MWh), Tier 2 (1–10 MWh), Tier 3 (10–100 MWh). C
- [STATEWIDE (applies to all towns in both counties)] Statewide model bylaw aligned to the Ch.239 of the Acts of 2024 consolidated siting/permitting reg
Tracked storage projects
- Cranberry Point Energy Storage
- West Street Battery Energy Storage System (Duxbury Energy Storage, LLC / New Leaf Energy)
- Old Middleboro Road PV + ESS (Agilitas Energy)
- 0 Hammond St CSG
- 59 Federal Rd(CSG)
- Old Middleboro Road Solar
- 0 Route 25 Solar + Storage (Wareham PV I LLC / Longroad Energy)
- 276 Federal Rd(CSG)
- 160 Tihonet Rd Hybrid(CSG)
- 299 Farm to Market Rd Hybrid(CSG)
- 77 Farm to Market Rd Hybrid(CSG)
- Cranberry Highway Solar LLC
- Syncarpha Halifax Hybrid CSG
- 196 Tremont St(CSG)
- 342 Circuit
- 71 Charlotte Furnace Rd Hybrid(CSG)
- 20 Bedford
- 27 Charge Pond Road & 150 Tihonet Road Solar + BESS (AD Makepeace / Borrego Solar / New Leaf)
- High Street Solar & Storage System
Full records for this county are part of a SitePath subscription.
County-level battery-storage status, safety requirements, and projects — each linked to a primary source.
Town & municipal bylaws
- CarverBESS — Replacement bylaw adopted after AG disapproved the town's 2022 solar/BESS moratorium; establishes tiered permitting, fire-compliance-plan requirements, buffer areas, and
- CarverBESS — Then-AG Maura Healey disapproved Carver's 11.5-month solar and battery-storage moratoria (passed at April 2022 Town Meeting, 387-87), citing Tracer Lane II Realty v. City
- DuxburyBESS — Draft bylaw (initial warrant version dated 2025-12-30) would require a special permit from the Planning Board, route applications to Fire Chief/Police Chief/Board of Heal
Full records for this county are part of a SitePath subscription.
Zoning bylaws of the 3 town(s) that hold siting and voting authority within this county — each linked to the primary document.
Community opposition P1
No organized opposition on record for this county yet — no petition, group, or oppositional coverage tracked. Absence of opposition is a positive siting signal.
Subscriber intel Subscribers
Researched for this county and available with a subscription:
- 🔒Project track record
- 🔒Developer intelligence
- 🔒Community & board sentiment
- 🔒Governing board
- 🔒Litigation & legal challenges
Energy-related meetings & dockets P1
Halo color = sentiment of the relevant agenda excerpt: green positive, yellow neutral, red negative.
- 2026-04-09 County BoardSolar
Plymouth County Solar Project update
- 2026-04-09 OtherSolar
Plymouth County discussed a proposal for a 270-kilowatt solar panel installation on three county buildings.
- 2024-02-26 Wareham Planning BoardStorage
Considered; not yet resolved at this session per agenda carry-forward
- 2024-01-08 Wareham Planning BoardStorage
Extension request considered; ultimately denied at a later 2024-06-10 session
Full records for this county are part of a SitePath subscription.
State PSC dockets P1
No tracked activity yet — coverage expands weekly.
Sentiment rollup P2
No sentiment rollup yet (requires meeting transcripts to be processed).
Local news P3
- 2026-05-23 2 A Does Proximity To Nuclear Power Plants Increase Cancer Risk
- 2025-10-06 Duxbury Selectboard Confronts Controversial Residential Battery Storage Proposal as Community Demands Action
- 2025-09-19 Duxbury residents speak out over proposed 'battery farm' in residential neighborhood
- 2025-09-05 Duxbury Residents Voice Concerns Over Potential Battery Farm In Area
- 2025-07-09 In a First, Land Court Rules that Standalone Battery Energy Storage Facilities Are Protected Like Solar Energy Systems
- 2025-02-22 Right to build, right to deny: Solar developer lawsuits challenge Planning Board
- 2023-12-18 Updated: Planning board rejects Route 25 solar farm
- 2023-10-11 Solar battery fires addressed by proposed regulation
- 2023-04-20 Planning Board vetoes 0 Route 25 solar project
Filter by grade, state, moratorium status, and compliance stringency. Compare counties side by side.