NE MA; Salem/Lawrence/Haverhill area; suburban/industrial; limited utility-scale land; commercial/community so. Permitting: Municipal Planning Board: Special Permit or variance. Track record: no prior utility-scale solar on record — greenfie…
Key driver: NE MA; Salem/Lawrence/Haverhill area; suburban/industrial; limited utility-scale land; commercial/community solar primary; EFSB >25 MW
Permitting process
Local permitting pathway
Municipal Planning Board: Special Permit or variance (≤25 MW). EFSB master permit for >25 MW.
Setbacks & buffers
None codified at county level. Municipal bylaws govern ≤25 MW; EFSB review for >25 MW. — NOTE: the distances above are a STATE-level fallback, not a figure read from this county's own ordinance. We hold siting-rule records for this county which may include a stricter local limit we have not yet extracted. Verify against the county's own ordinance before relying on these.
Spacing requirements
None codified.
Size restrictions
None codified.
Penalties & bonding
No penalties or adjustments. Standard CUP/SUP process.
State-level permits & approvals
2024 Massachusetts Climate Act (signed Nov 21, 2024): historic reform of siting and permitting. Large projects (>25 MW generation or >100 MWh storage): Energy Facilities Siting Board (EFSB) consolidates state and local review into single master permit; 15-month deadline for EFSB decision. Small projects (≤25 MW / ≤100 MWh): municipalities retain permitting authority under new streamlined process (225 CMR 29.00 promulgated Feb 27, 2026; effective immediately). 12-month deadline for municipal decisions on small clean energy projects. MGL Ch.40A §3 (Massachusetts Zoning Act): zoning ordinances cannot prohibit or unreasonably regulate solar energy systems — long-standing solar protection for sub-threshold projects. DOER site suitability scoring framework; community benefit plan requirements for larger projects. ISO-NE interconnection required statewide.
Full records for this county are part of a SitePath subscription.
State policy & grid context
State RPS & clean energy policy
40% by 2030 + 80% Clean Peak / net-zero by 2050 | Act Creating Next-Gen Roadmap for MA Climate Policy (2021) | G.L. c.25A §11F
State incentive programs
MA SMART Program (Solar Massachusetts Renewable Target): production incentive paid per kWh generated for 10 years for projects ≤5 MW; administered by DOER/utilities. Adder rates for low-income housing, brownfields, rooftops, and agrivoltaic projects. Net metering: available statewide (up to 5 MW for behind-the-meter); MA expanded net metering cap via DPU. MA RPS: 40% renewable by 2030 (Class I); Class I solar carve-out drives SREC value. MA Clean Energy Center MassSave: rebates for commercial/industrial efficiency and solar. Utility: Eversource (NSTAR/WMECo) and National Grid serve most counties; Cape Light Compact serves Barnstable and Dukes; various municipal aggregations active.
Grid & interconnection
ISO-NE / Northeast Massachusetts (NEMA) zone — Eversource
Full records for this county are part of a SitePath subscription.
Battery storage (BESS) P1 State-Default Permitting
Town-zoned (no county land-use authority). Active towns: Peabody, Ipswich, Salem, Wakefield. 2 tracked storage project(s). Requirements referenced: NFPA-855, UL9540.
BESS ordinances & bylaws
Tracked storage projects
Full records for this county are part of a SitePath subscription.
County-level battery-storage status, safety requirements, and projects — each linked to a primary source.
Town & municipal bylaws
- AndoverSolar — Andover's re-codified zoning bylaw (adopted March 21, 2022) includes Section 6.7 Solar, which classifies solar installations by scale. A small-scale array is 1,750 sq ft
- EssexSolar — Essex Chapter VI zoning bylaw contains codified solar energy provisions including definitions for Solar Photovoltaic Facility (SPVF) and related terms, consistent with Ma
- GrovelandBESS — Groveland added a Battery Energy Storage Systems bylaw section via 2023 Annual Town Meeting Article 17 (adopted April 24, 2023, AGO Case #10948), adding a new subsection
- GrovelandSolar — Groveland's zoning bylaw (Chapter 50, codified on eCode360 through 04-28-2025) contains solar energy provisions in Article VII Special Use Regulations, added by post-2018
- IpswichBESS — BESS is regulated under Sections V.D and XI.J of the Ipswich Protective Zoning Bylaw — the same sections governing ground-mounted solar. The Ipswich Electric Light Depart
- IpswichSolar — Ipswich codifies Ground-Mounted Solar Photovoltaic Installations (GSI) under Sections V.D and XI.J of its Protective Zoning Bylaw, adopted at the October 15, 2012 Special
- MiddletonSolar — Middleton's zoning bylaw (Chapter 235, hosted on eCode360) is confirmed to exist but all section pages returned HTTP 403 during research. An operational 6 MW ground-mount
- SaugusSolar — Saugus adopted Article 20 (Large-Scale Ground-Mounted Solar PV Overlay District) at the 2014 Annual Town Meeting, applying to systems with minimum 250 kW DC nameplate cap
Full records for this county are part of a SitePath subscription.
Zoning bylaws of the 6 town(s) that hold siting and voting authority within this county — each linked to the primary document.
Community opposition P1
No organized opposition on record for this county yet — no petition, group, or oppositional coverage tracked. Read that as nothing found, not as nothing there: absence of records is not evidence of local support.
Subscriber intel Subscribers
Researched for this county and available with a subscription:
- 🔒Project track record
- 🔒Developer intelligence
- 🔒Governing board
Energy-related meetings & dockets P1
No tracked activity yet — coverage expands weekly.
State PSC dockets P1
No tracked activity yet — coverage expands weekly.
Local news P3
No tracked activity yet — coverage expands weekly.
Filter by grade, state, moratorium status, and compliance stringency. Compare counties side by side.