Solar permitting — Vermilion Parish, Louisiana
2 news items.
South Louisiana coastal Acadiana parish; Abbeville seat; Entergy Louisiana and SLEMCO MISO grid; flat coastal prairie with extensive sugarcane and ric. Permitting: Conditional Use Permit; 300-ft max / 150-ft min setbacks. Track recor…
Key driver: South Louisiana coastal Acadiana parish; Abbeville seat; Entergy Louisiana and SLEMCO MISO grid; flat coastal prairie with extensive sugarcane and rice agriculture; hurricane exposure adds modest risk premium on trajectory and uncertainty; density of 38.0/sq mi with viable rural parcels; Police Jury supportive; SLEMCO cooperative service territory favorable for smaller distributed projects; B-grade reflects flat coastal prairie viability, permissive CUP, and modest hurricane uncertainty offset by low compliance complexity
Permitting process
Local permitting pathway
Conditional Use Permit (CUP) — Vermilion Parish Police Jury
Setbacks & buffers
Act 279 (2025) siting requirements, applying to a solar facility of 75 ACRES OR MORE not wholly within an industrial-zoned area or an LED certified site, constructed after 1 January 2026: 300 ft from a RESIDENTIAL PROPERTY LINE to the nearest solar equipment, with a 35 ft barrier of new landscaping or a 50 ft barrier of natural plants; 100 ft from the low water mark of natural and navigable waterways; 50 ft from the pavement edge of a public road, with a 35 ft vegetative barrier. Noise may not exceed 10 dB above pre-construction ambient at the property line. A parish may adopt its own siting requirements and opt out of the state requirements by resolution, and a landowner may opt out by written agreement with the operator
Spacing requirements
None established
Size restrictions
None codified; managed via CUP/SUP conditions
Penalties & bonding
Total penalty: +28 | Active moratorium: +28
State-level permits & approvals
Parish zoning authority; no state solar preemption; conditional use permit typically required for utility-scale (>1 MW); no mandatory decommissioning bond statewide (some parishes require it)
Full records for this county are part of a SitePath subscription.
State policy & grid context
State RPS & clean energy policy
No binding RPS | None | Louisiana has no state RPS; voluntary pilot 350 MW distributed
State incentive programs
Federal ITC eligible; Louisiana sales tax exemption for solar equipment; Louisiana property tax exemption for solar; no state income tax credit for commercial solar
Grid & interconnection
MISO / Entergy Louisiana
Full records for this county are part of a SitePath subscription.
Battery storage (BESS) P1 State-Default Permitting
No confirmed parish BESS ordinance.
Local BESS ordinances & bylaws
County-level battery-storage status, safety requirements, and projects — each linked to a primary source.
Community opposition P1
No organized opposition on record for this county yet — no petition, group, or oppositional coverage tracked. Read that as nothing found, not as nothing there: absence of records is not evidence of local support.
Subscriber intel Subscribers
Researched for this county and available with a subscription:
- 🔒Project track record
- 🔒Developer intelligence
- 🔒Governing board
Energy-related meetings & dockets P1
No tracked activity yet — coverage expands weekly.
State PSC dockets P1
No tracked activity yet — coverage expands weekly.
Local news P3
Filter by grade, state, moratorium status, and compliance stringency. Compare counties side by side.