0 indexed meetings (0 energy-related), 0 PSC dockets, 0 news items, 6 known opposition groups.
Northeast Louisiana Delta parish; St. Permitting: Conditional Use Permit; 300-ft max / 150-ft min setbacks. Track record: no prior utility-scale solar on record — greenfield jurisdiction; no established approval precedent in this cou
Key driver: Northeast Louisiana Delta parish; St. Joseph seat; Entergy Louisiana MISO grid; Concordia Electric Cooperative serves rural portions; Louisiana's smallest-population parish (4,334 residents) with very flat Mississippi River alluvial bottomland; density of just 7.2/sq mi — one of the lowest in the South; severe population decline (-8.2% 2020-2023) makes any economic development highly attractive; virtually zero compliance barriers; B-grade borderline reflecting near-A fundamentals with minimal uncertainty premium
Permitting process
Local permitting pathway
Conditional Use Permit (CUP) — Tensas Parish Police Jury
Setbacks & buffers
150 ft from property lines; 300 ft from occupied structures
Spacing requirements
None established
Size restrictions
None codified; managed via CUP/SUP conditions
Penalties & bonding
Total penalty: +28 | Active moratorium: +28
State-level permits & approvals
Parish zoning authority; no state solar preemption; conditional use permit typically required for utility-scale (>1 MW); no mandatory decommissioning bond statewide (some parishes require it)
State policy & grid context
State RPS & clean energy policy
No binding RPS | None | Louisiana has no state RPS; voluntary pilot 350 MW distributed
State incentive programs
Federal ITC eligible; Louisiana sales tax exemption for solar equipment; Louisiana property tax exemption for solar; no state income tax credit for commercial solar
Grid & interconnection
MISO / Entergy Louisiana
Subscriber intel Subscribers
Researched for this county and available with a subscription:
- 🔒Project track record
- 🔒Developer intelligence
- 🔒Community & board sentiment
- 🔒Governing board
- 🔒Sentiment & opposition
Energy-related meetings & dockets P1
No meetings indexed yet for this jurisdiction.
State PSC dockets P1
No PSC dockets matched to this county yet.
Local news P3
News ingestion not yet active for this county (GDELT/RSS pipeline pending).
Filter by grade, state, moratorium status, and compliance stringency. Compare counties side by side.