Solar permitting — Richland Parish, Louisiana
71 news items, 1 known opposition group.
Northeast Louisiana parish; Rayville seat; Entergy Louisiana MISO grid; flat cotton and soybean alluvial plain; very low density (33. Permitting: Conditional Use Permit; 300-ft max / 150-ft min setbacks. Track record: no prior utilit…
Key driver: Northeast Louisiana parish; Rayville seat; Entergy Louisiana MISO grid; flat cotton and soybean alluvial plain; very low density (33.8/sq mi) with declining population; no significant solar development history means low saturation risk; standard CUP with minimal compliance complexity; B-grade reflects permissive rural Police Jury, abundant flat agricultural land, and very low regulatory barriers
Permitting process
Local permitting pathway
Conditional Use Permit (CUP) — Richland Parish Police Jury
Setbacks & buffers
Act 279 (2025) siting requirements, applying to a solar facility of 75 ACRES OR MORE not wholly within an industrial-zoned area or an LED certified site, constructed after 1 January 2026: 300 ft from a RESIDENTIAL PROPERTY LINE to the nearest solar equipment, with a 35 ft barrier of new landscaping or a 50 ft barrier of natural plants; 100 ft from the low water mark of natural and navigable waterways; 50 ft from the pavement edge of a public road, with a 35 ft vegetative barrier. Noise may not exceed 10 dB above pre-construction ambient at the property line. A parish may adopt its own siting requirements and opt out of the state requirements by resolution, and a landowner may opt out by written agreement with the operator — NOTE: the distances above are a STATE-level fallback, not a figure read from this county's own ordinance. We hold siting-rule records for this county which may include a stricter local limit we have not yet extracted. Verify against the county's own ordinance before relying on these.
Spacing requirements
None established
Size restrictions
None codified; managed via CUP/SUP conditions
Penalties & bonding
Total penalty: +28 | Active moratorium: +28
State-level permits & approvals
Parish zoning authority; no state solar preemption; conditional use permit typically required for utility-scale (>1 MW); no mandatory decommissioning bond statewide (some parishes require it)
Full records for this county are part of a SitePath subscription.
State policy & grid context
State RPS & clean energy policy
No binding RPS | None | Louisiana has no state RPS; voluntary pilot 350 MW distributed
State incentive programs
Federal ITC eligible; Louisiana sales tax exemption for solar equipment; Louisiana property tax exemption for solar; no state income tax credit for commercial solar
Grid & interconnection
MISO / Entergy Louisiana
Full records for this county are part of a SitePath subscription.
Battery storage (BESS) P1 State-Default Permitting
No confirmed parish BESS ordinance.
BESS ordinances & bylaws
County-level battery-storage status, safety requirements, and projects — each linked to a primary source.
Community opposition P1 1 tracked
Organized opposition signals on record for this county — petitions, community groups, and oppositional coverage — each linked to its primary source.
SitePath maintains the most complete community-opposition dataset available, refreshed continuously from primary sources.
Subscriber intel Subscribers
Researched for this county and available with a subscription:
- 🔒Project track record
- 🔒Developer intelligence
- 🔒Governing board
Energy-related meetings & dockets P1
No tracked activity yet — coverage expands weekly.
State PSC dockets P1
No tracked activity yet — coverage expands weekly.
Local news P3
- 2026-08-31 Louisiana Town Transformed By Meta Data Center Interest
- 2026-08-28 Ai Infrastructure Investment Hits 697 Billion Driving Renewable Energy Grid And Battery Storage Expansion 55009
- 2026-08-27 Entergy Customers Begin Seeing Benefits From Data Center Agreements Fair Share Plus Pledge Keeps Money In Customers Pockets 302862079
- 2026-08-27 Last Word Data Centers And The Infrastructure Of The Intelligence Revolution
- 2026-08-27 Data Center Delays Threaten Ai Natural Gas Demand 1874661
- 2026-08-26 The Backlash Against Data Centers Is Bipartisan Nationwide And Wrong
- 2026-08-18 When Blocking Solar Power Isnt Conservative
- 2026-08-16 Hating Solar For The Sake Of Hating Solar Isnt Some Kind Of Conservative Tenet N4956208
- 2026-08-14 The Water Fight Over Data Centers Is A Distraction The Grid Fight Is The Real Story
- 2026-08-13 Regulators Allow Meta Keep Data Center Records Secret
- 2026-06-11 Louisiana Senator Helped Secure Meta039S Largest Data Center Then He Sold The Land Beside It,374513
- 2026-06-10 Meta Data Center Free Training Employment Blue Collar Trade Jobs
- 2026-06-09 Meta Launches Program Fast Track Workers Skilled Trade Jobs Ai Infrastructure Data Centers Awa
- 2026-06-08 Theres No Ai Boom Without An Energy Boom
- 2026-06-08 Ai Data Center Near Me Location Tracker 2026 6
Filter by grade, state, moratorium status, and compliance stringency. Compare counties side by side.