Solar permitting — Cameron Parish, Louisiana
0 indexed meetings (0 energy-related), 0 PSC dockets, 0 news items, 6 known opposition groups.
Most sparsely populated parish in Louisiana; vast coastal marshland limits viable solar terrain to higher-grou. Permitting: Conditional Use Permit; 300-ft max / 200-ft min setbacks; hard No acreage cap; vast coastal marsh
Key driver: Most sparsely populated parish in Louisiana; vast coastal marshland limits viable solar terrain to higher-ground agricultural fringe; Cameron LNG export terminal nearby means energy development is culturally normalized; Police Jury fully permissive; hurricane exposure (direct landfall history: Laura 2020, Delta 2020) drives up insurance costs and structural requirements significantly; B-grade on permissive culture and flat viable terrain offset by hurricane uncertainty premium
Permitting process
Local permitting pathway
Conditional Use Permit (CUP) — Cameron Parish Police Jury; coastal construction permits via LADOTD
Setbacks & buffers
200 ft from property lines; 300 ft from occupied structures; coastal construction standards (wind zone IV); elevated panel mounting required in flood-prone zones
Spacing requirements
None established; panel height and wind-load specs governed by coastal building codes
Size restrictions
Wind Zone IV structural compliance required
Penalties & bonding
Total penalty: +28 | Active moratorium: +28
State-level permits & approvals
Parish zoning authority; no state solar preemption; conditional use permit typically required for utility-scale (>1 MW); no mandatory decommissioning bond statewide (some parishes require it)
State policy & grid context
State RPS & clean energy policy
No binding RPS | None | Louisiana has no state RPS; voluntary pilot 350 MW distributed
State incentive programs
Federal ITC eligible; Louisiana sales tax exemption for solar equipment; Louisiana property tax exemption for solar; no state income tax credit for commercial solar
Grid & interconnection
MISO / Entergy Louisiana (SPP overlap at western edge)
Subscriber intel Subscribers
Researched for this county and available with a subscription:
- 🔒Project track record
- 🔒Developer intelligence
- 🔒Community & board sentiment
- 🔒Governing board
- 🔒Sentiment & opposition
Energy-related meetings & dockets P1
No meetings indexed yet for this jurisdiction.
State PSC dockets P1
No PSC dockets matched to this county yet.
Local news P3
News ingestion not yet active for this county (GDELT/RSS pipeline pending).
Filter by grade, state, moratorium status, and compliance stringency. Compare counties side by side.