4 indexed meetings (4 energy-related), 0 PSC dockets, 0 news items, 12 known opposition groups.
Shreveport metro parish; SWEPCO (AEP/SPP) grid dominant; urban density restricts utility-scale sites to wester. Permitting: Conditional Use Permit; 500-ft max / 150-ft min setbacks. Track record: Rocking R Solar — 72.5 MW, 2025, SWEP
Key driver: Shreveport metro parish; SWEPCO (AEP/SPP) grid dominant; urban density restricts utility-scale sites to western rural fringe; declining population in Shreveport urban core; North Louisiana Electric Cooperative on outer rural fringe; oil-and-gas political culture but not hostile to solar; C-grade reflecting urban land constraints, moderate permitting complexity, and suburban saturation risk
Permitting process
Local permitting pathway
Conditional Use Permit (CUP) — Caddo Parish Commission / Planning Department
Setbacks & buffers
200 ft from property lines; 500 ft from occupied structures in urban zones; 150 ft in rural fringe
Spacing requirements
None established
Size restrictions
Projects near Shreveport typically <20 MW due to land constraints
Penalties & bonding
Total penalty: +28 | Active moratorium: +28
State-level permits & approvals
Parish zoning authority; no state solar preemption; conditional use permit typically required for utility-scale (>1 MW); no mandatory decommissioning bond statewide (some parishes require it)
State policy & grid context
State RPS & clean energy policy
No binding RPS | None | Louisiana has no state RPS; voluntary pilot 350 MW distributed
State incentive programs
Federal ITC eligible; Louisiana sales tax exemption for solar equipment; Louisiana property tax exemption for solar; no state income tax credit for commercial solar
Grid & interconnection
SPP / Southwestern Electric Power Company (SWEPCO)
Subscriber intel Subscribers
Researched for this county and available with a subscription:
- 🔒Project track record
- 🔒Developer intelligence
- 🔒Community & board sentiment
- 🔒Governing board
- 🔒Sentiment & opposition
Energy-related meetings & dockets P1
Halo color = sentiment of the relevant agenda excerpt: green positive, yellow neutral, red negative.
- 2024-01-20 OtherData Center
The Planning Commission approved a special-use permit application for a 150 MW solar farm.
- 2024-01-20 OtherData Center
The Planning Commission approved a data center project with a total population of 237,848 and an ideal district size of 19,821.
- 2024-01-20 OtherData Center
The Planning Commission approved a special-use permit application for a 150 MW solar farm in District 1.
- 2024-01-20 OtherTransmission
The Caddo Parish Commission approved a transmission line project that will connect the Southwestern Electric Company transmission line east of Farmridge Road to the Caddo-DeSoto Parish line.
State PSC dockets P1
No PSC dockets matched to this county yet.
Local news P3
News ingestion not yet active for this county (GDELT/RSS pipeline pending).