Solar permitting — Bienville Parish, Louisiana
0 indexed meetings (0 energy-related), 0 PSC dockets, 0 news items, 6 known opposition groups.
✅ LOW RISK (Score 34/100, Grade A, stable trajectory) — Very rural north Louisiana timber parish; Cleco Power MISO grid; Bienville Electric Cooperative serves rural a. Permitting: Conditional Use Permit; 300-ft max / 150-ft min setbacks. Track record: no prior utility-scale solar on record — greenfi
Key driver: Very rural north Louisiana timber parish; Cleco Power MISO grid; Bienville Electric Cooperative serves rural areas; extremely low population density means minimal land conflict; declining population and weak local economy make lease income attractive to landowners; conservative political culture but not actively hostile to solar; B-grade reflecting rural permissive baseline with low saturation and minimal regulatory complexity
Permitting process
Local permitting pathway
Conditional Use Permit (CUP) — Bienville Parish Police Jury
Setbacks & buffers
150 ft from property lines; 300 ft from occupied structures
Spacing requirements
None established
Size restrictions
None codified; managed via CUP/SUP conditions
Penalties & bonding
Total penalty: +28 | Active moratorium: +28
State-level permits & approvals
Parish zoning authority; no state solar preemption; conditional use permit typically required for utility-scale (>1 MW); no mandatory decommissioning bond statewide (some parishes require it)
State policy & grid context
State RPS & clean energy policy
No binding RPS | None | Louisiana has no state RPS; voluntary pilot 350 MW distributed
State incentive programs
Federal ITC eligible; Louisiana sales tax exemption for solar equipment; Louisiana property tax exemption for solar; no state income tax credit for commercial solar
Grid & interconnection
MISO / Cleco Power
Subscriber intel Subscribers
Researched for this county and available with a subscription:
- 🔒Project track record
- 🔒Developer intelligence
- 🔒Community & board sentiment
- 🔒Governing board
- 🔒Sentiment & opposition
Energy-related meetings & dockets P1
No meetings indexed yet for this jurisdiction.
State PSC dockets P1
No PSC dockets matched to this county yet.
Local news P3
News ingestion not yet active for this county (GDELT/RSS pipeline pending).
Filter by grade, state, moratorium status, and compliance stringency. Compare counties side by side.