Colorado

Solar permitting — Logan County, Colorado

FIPS 08075

On file: public meetings, local news, known opposition groups.

C
Logan County, CO
Risk score 51/100 · Full scorecard →
Compliance: ModerateNo local solar ordinanceTrajectory: StableSaturation: High

Flat NE Colorado plains; Xcel territory; permissive county zoning; growing solar pipeline; low density land… Permitting: County Zoning / Administrative Permit. Track record: Sterling Solar I (~15 MW, 2021); Crook Solar (~20 MW, 20…

Key driver: Flat NE Colorado plains; Xcel territory; permissive county zoning; growing solar pipeline; low density land available

Permitting process

Local permitting pathway

County Zoning / Administrative Permit

Setbacks & buffers

None codified statewide. County CUP conditions set site-specific requirements. — NOTE: the distances above are a STATE-level fallback, not a figure read from this county's own ordinance. We hold siting-rule records for this county which may include a stricter local limit we have not yet extracted. Verify against the county's own ordinance before relying on these.

Spacing requirements

No spacing requirements codified

Size restrictions

No size restrictions under 50 MW

Penalties & bonding

No penalties or adjustments. Standard CUP/SUP process.

State-level permits & approvals

County zoning; HB 23-1232 CEO review >50 MW; decommissioning bond required

Full permitting requirements

Full records for this county are part of a SitePath subscription.

State policy & grid context

State RPS & clean energy policy

100% clean by 2050, 80% by 2030 for IOUs | SB19-236 Colorado Clean Energy Plan | C.R.S. §40-2-124 & §40-2-125.5

State incentive programs

Federal ITC; Colorado Clean Energy Fund; Xcel RE procurement programs

Grid & interconnection

Xcel Energy (PSCO) / WECC

Full state policy & grid detail

Full records for this county are part of a SitePath subscription.

Battery storage (BESS) P1 State-Default Permitting

BESS MORATORIUM (EXPIRED) — Logan County enacted moratorium on BESS October 21 2025 through April 19 2026 (5-month duration) while developing new energy facility regulations

Moratorium until 2026-04-19

BESS ordinances & bylaws

County-level battery-storage status, safety requirements, and projects — each linked to a primary source.

Community opposition P1

Organized opposition signals on record for this county — petitions, community groups, and oppositional coverage — each linked to its primary source.

SitePath maintains the most complete community-opposition dataset available, refreshed continuously from primary sources.

Subscriber intel Subscribers

Researched for this county and available with a subscription:

Sign in to view

Energy-related meetings & dockets P1

data center · wind · bess

Halo color matches the energy category tagged on each meeting.

  • 2026-07-07 County Board
    Wind

    Logan County considers approval of a Master Road Use Agreement with Logan Wind, LLC for a wind energy facility project.

  • 2026-05-19 Other
    Data Center

    Logan County may lose land use authority over data center locations.

  • 2026-04-07 County Board
    Wind

    The Board will consider approval of amended Wind Energy Facility regulations in the Logan County Zoning Resolution.

  • 2026-03-31 County Board
    Data Center

    Planning Commission may process concurrent applications for a wind energy facility, data center facility, and/or a battery energy storage system.

  • 2026-03-17 County Board
    Wind

    The Board will consider an amendment to the Logan County Zoning Resolution to adopt new Wind Energy Facility regulations.

  • 2026-03-17 Other
    Data Center

    No data center application was on the agenda for discussion.

  • 2026-02-17 County Board
    Data Center

    The Board will consider approval of Resolution 2026-5 amending the Logan County Zoning Resolution for Data Center Facilities.

  • 2026-01-27 Other
    Data Center

    HDR's building engineering group will assist with designing the data center building foundations and facilities.

  • 2026-01-27 County Board
    Data Center

    Commissioners will hear a presentation from John Sayer of HDR regarding consultation services for a data center project.

  • 2026-01-20 County Board
    Data Center

    The Board will consider adopting Data Center Facility regulations as part of the Logan County Zoning Resolution.

  • 2026-01-06 County Board
    Data Center

    The Board will consider approval of Resolution 2026-5 to amend the Logan County Zoning Resolution with Data Center Facility regulations.

More energy-related meetings

Full records for this county are part of a SitePath subscription.

State PSC dockets P1

No tracked activity yet — coverage expands weekly.

Local news P3

Explore every US county on the interactive map

Filter by grade, state, moratorium status, and compliance stringency. Compare counties side by side.