SitePathLocal intelColorado › Fremont County
Colorado

Solar permitting — Fremont County, Colorado

FIPS 08043

1 news item.

B
Fremont County, CO
Risk score 36/100 · Full scorecard →
Compliance: ModerateSolar ordinance on fileTrajectory: StableSaturation: Low

Arkansas River canyon terrain limits sites but Royal Gorge area has some valley-floor and plateau potential; C. Permitting: County Zoning / Special Use Permit. Track record: One ground-mount project (~12 MW, 2021); one smaller instal…

Key driver: Arkansas River canyon terrain limits sites but Royal Gorge area has some valley-floor and plateau potential; Cañon City is conservative but not hostile to solar; mixed Xcel/Black Hills grid territory

Permitting process

Local permitting pathway

County Zoning / Special Use Permit

Setbacks & buffers

None codified statewide. County 1041 permit conditions vary. Some CO counties have adopted solar-specific setbacks. — NOTE: the distances above are a STATE-level fallback, not a figure read from this county's own ordinance. We hold siting-rule records for this county which may include a stricter local limit we have not yet extracted. Verify against the county's own ordinance before relying on these.

Spacing requirements

No spacing requirements codified

Size restrictions

None codified; managed via CUP/SUP conditions

Penalties & bonding

No penalties or adjustments. Standard CUP/SUP process.

State-level permits & approvals

County SUP; HB 23-1232 CEO review >50 MW; decommissioning bond

🔒
Full permitting requirements

Full records for this county are part of a SitePath subscription.

State policy & grid context

State RPS & clean energy policy

100% clean by 2050, 80% by 2030 for IOUs | SB19-236 Colorado Clean Energy Plan | C.R.S. §40-2-124 & §40-2-125.5

State incentive programs

Federal ITC; Colorado Clean Energy Fund

Grid & interconnection

Xcel Energy (PSCO) / Black Hills Energy / WECC

🔒
Full state policy & grid detail

Full records for this county are part of a SitePath subscription.

Battery storage (BESS) P1 State-Default Permitting

BESS MORATORIUM (EXPIRED) — Fremont County enacted BESS moratorium June 11 2024 through January 1 2025 (6-month duration)

Moratorium until 2025-01-01

Local BESS ordinances & bylaws

County-level battery-storage status, safety requirements, and projects — each linked to a primary source.

Community opposition P1

No organized opposition on record for this county yet — no petition, group, or oppositional coverage tracked. Read that as nothing found, not as nothing there: absence of records is not evidence of local support.

Subscriber intel Subscribers

Researched for this county and available with a subscription:

Sign in to view

Energy-related meetings & dockets P1

No tracked activity yet — coverage expands weekly.

State PSC dockets P1

No tracked activity yet — coverage expands weekly.

Local news P3

Explore every US county on the interactive map

Filter by grade, state, moratorium status, and compliance stringency. Compare counties side by side.

Open the county map → SitePath home All Colorado counties
Data sources: public agendas/minutes from local government sites; PSC dockets from state regulators; news from GDELT and curated RSS. Last refreshed 2026-09-10. See the county risk scorecard or the full Colorado permitting index.