Arkansas River Valley; mixed terrain limits viable flat sites; OG&E SPP grid; moderate CUP process; transition. Permitting: Conditional Use Permit; 400-ft max / 250-ft min setbacks. Track record: Ozark Solar (18 MW, 2022)
Key driver: Arkansas River Valley; mixed terrain limits viable flat sites; OG&E SPP grid; moderate CUP process; transitional area between flat river bottom and Ozark foothills
Permitting process
Local permitting pathway
Conditional Use Permit (CUP) - Quorum Court/Planning Commission
Setbacks & buffers
250 ft property line; 400 ft occupied structures
Spacing requirements
None established
Size restrictions
None codified; managed via CUP/SUP conditions
Penalties & bonding
No penalties or adjustments. Standard CUP/SUP process.
State-level permits & approvals
County zoning authority; Act 827 sets minimum ANRC standards; conditional use permit or special exception required; decommissioning bond required; setback minimums set by ANRC
Full records for this county are part of a SitePath subscription.
State policy & grid context
State RPS & clean energy policy
No binding RPS | None | Arkansas has no state-mandated RPS; net metering only
State incentive programs
Federal ITC eligible; no Arkansas state solar tax credit; Act 827 ANRC framework
Grid & interconnection
SPP / Oklahoma Gas & Electric (OG&E)
Full records for this county are part of a SitePath subscription.
Battery storage (BESS) P1 State-Default Permitting
No confirmed county BESS ordinance.
BESS ordinances & bylaws
County-level battery-storage status, safety requirements, and projects — each linked to a primary source.
Community opposition P1
No organized opposition on record for this county yet — no petition, group, or oppositional coverage tracked. Read that as nothing found, not as nothing there: absence of records is not evidence of local support.
Subscriber intel Subscribers
Researched for this county and available with a subscription:
- Project track record
- Developer intelligence
- Governing board
Energy-related meetings & dockets P1
No meetings on file for this jurisdiction flagged as discussing solar, BESS, data centers, wind, or transmission yet. Coverage expands weekly.
State PSC dockets P1
No tracked activity yet — coverage expands weekly.
Local news P3
Filter by grade, state, moratorium status, and compliance stringency. Compare counties side by side.